Tombill Mines Ltd. · TSXV:TBLL

Tombill Mines — Investor Presentation (March 2022)

23 slides from Tombill Mines's investor presentation, March 2022

  1. Slide 1: Investor Presentation – March 2022

    TSX-V: TBLL OTCQB: TBLLF INVESTOR PRESENTATION – March 2022 EXPANDING GERALDTON GOLD CAMP’S WORLD CLASS RESOURCE WWW.TOMBILLMINES.COM

  2. Slide 2: Company Disclaimer

    COMPANY DISCLAIMER Introductory Cautionary Notes Tombill Mines Limited (“Tombill”) has taken all reasonable care in producing and publishing information contained in this presentation and website, and will endeavor to do so regularly. Material may still contain technical or other inaccuracies, omiss

  3. Slide 3: Tombill at a Glance

    TOMBILL AT A GLANCE MIDDLE OF OPTIMAL GOLD CAMP, SIZABLE RESOURCES Seasoned Senior Simple Story & Structure: Own TBLL Results To Date: Team/Advisors in Place with Patents, No Royalties, Top • High Grade Intercepts Superior Local Knowledge & Jurisdiction, Optimal Extending the F-Zone Proven Track Rec

  4. Slide 4: Tombill/Geraldton Gold Camp History, Resource & Exploration

    TOMBILL/GERALDTON GOLD CAMP HISTORY, RESOURCE & EXPLORATION SIZABLE RESOURCES MORPHING FROM PAST MINES Tombill: “Donut Hole” within World Class Gold Mine under G E R A L D T O N C A M P P A S T P R O D U C E R S (4) + C U R R E N T R E S O U R C E Construction Little Long 10 Past Producing Gold Mine

  5. Slide 5: Geraldton Gold Camp Past Producers and Current Resources

    GERALDTON GOLD CAM P PAST PRODUCERS: 1934- 70 & CUR RENT RESOURCES LIMITED FOCUS HISTORICALLY ON LOW GRADE NEAR SURFACE. 6 OF 10 LOCAL PAST MINES HAVE YIELDED EXPONENTIALLY LARGER RESOURCES RELATIVE TO PAST MINES Talmora Long Lac Little Long Tombill Original Bankfield 10 Past Producing Gold Mines La

  6. Slide 6: Location: Geraldton Gold Camp

    LOCATION: GERALDTON GOLD CAMP “DONUT HOLE” IN THIS WORLD CLASS RE-AWAKENED GOLD CAMP LARGE TOWN, INFRASTRUCTURE, DONUT HOLE IN GERALDTON GOLD CAMP Tombill: founded 1935 by Newmont and Tom/Bill Johnson To Airport (6km) Footprint: 3,050+ Acres with Until Now Sparse and Antiquated Historical Exploratio

  7. Slide 7: Tombill's Surface & Underground Primary Gold Targets

    TOMBILL’S SURFACE & UNDERGROUND PRIMARY GOLD TARGETS FOCUSING ON FOUR POTENTIAL HIGH QUALITY TARGETS – TWO PAST MINES – LOWER GRADE SURFACE AND HIGHER GRADE DEPTH F- ZONE EXTN/TOMBILL MAIN TOMBILL ORIGINAL MINE-NEAR SURFACE TALMORA MINE-NEAR SURFACE GROUP o Past Producing(1938-42,55) o Past Producin

  8. Slide 8: On Strike with Greenstone Mine, Including F-Zone

    ON STRIKE WITH GREENSTONE MINE, INCLUDING F-ZONE F-ZONE, OVER HARDROCK: 6GPT+; 30 X 125M DIMENSION; ~4.3KM STRIKE Greenstone Mine: Dimension of F-Zone (1) (2) LONG SECTION OF THE GERALDTON CAMP LOOKING NORTH (3) • Gpt: Above 6 g/t • Height: 100-150m • Width: 25-35m • Density ratio: 2.7x MM179C MM172

  9. Slide 9: F-Zone Lithology Similar to Hardrock

    F-ZONE LITHOLOGY SIMILAR TO HARDROCK NOTE DEFORMED WHITE QUARTZ VEINS IN GREYWACKE F-ZONE INTERCEPTS TOMBILL HARDROCK Part of F-Zone drill intercept at Tombill from drill-hole TB21- F-Zone mineralization in core from Premier Gold Mines 005A at around 1105 m down-hole Limited (Hardrock), 2011 9 | TBL

  10. Slide 10: Our Results Confirm Extension of F-Zone & Other Zones Down Plunge

    OUR RESULTS CONFIRM EXTENSION OF F- ZONE & OTHER ZONES DOWN PLUNGE STRIKE 283M; INTERSECTED 46M; WEIGHTED 6.01G/T SIGNIFICANT RESULTS OF PHASE 1 DRILL PROGRAM TO DATE LONG SECTION VIEW OF DEEP DRILLING TO DATE Hole-ID 46M From (m) To (m) Length (m) Au (g/t) Zone TB21-001A 1191 1192 1.0 6.03 F TB21-0

  11. Slide 11: Inaugural Near Surface Drilling: Talmora Past-Producing Mine

    INAUGURAL NEAR SURFACE DRILLING: TALMORA PAST-PRODUCING MINE 1,146M DRILLED, INTERSECTED 22M; WEIGHTED 2.47 G/T, INCLUDING 1.65G/T OVER 11.5M INTERSECT TALMORA DRILLING SECTION LOOKING WEST SIGNIFICANT RESULTS OF TALMORA DRILLING Interval From To Au Hole ID Length Zone (m) (m) (gpt) (m) TAL21001 133

  12. Slide 12: Exploration Programs-Phase 2A

    EXPLORATION PROGRAMS-PHASE 2A 4 AREAS/TARGETS: 3 NEAR SURFACE AREAS OF WHICH 2 PAST PRODUCING + DEEP DRILL F-ZONE STRIKE TOMBILL EXPLORATION AND DRILLING PROGRAM Phase 2A/2022: Objective is to diversity exploration -- LEGEND Hardrock Resource mostly drilling -- over 4 targets; both shallow and near

  13. Slide 13: F-Zone Extension Drilling Program

    F-ZONE EXTENSION DRILLING PROGRAM EXTEND THE STRIKE 7 PLUNGE OF THE F-ZONE TOMBILL MAIN GROUP PHASE 1 & 2 DRILLING PROGRAMS Last exploration of Tombill was in the early 80’s- very marginal LEGEND Phase 1 • Jan 2021 - 1st deep drilling ever on Phase #1 Collars Phase #2 Collars Tombill TOMBILL MINES –

  14. Slide 14: Talmora & Tombill Main Group North Near Surface Exploration Program

    TALMORA & TOMBILL MAIN GROUP NORTH -- NEAR SURFACE EXPLORATION PROGRAM COMMENCED SEPTEMBER 2021 AT TALMORA, OUR PAST PRODUCING MINE TALMORA SURFACE DRILLING PROGRAM Northern Half of Tombill Main Group comprises interesting mineralisation and the past-producing Talmora mine • UAV-MAG survey completed

  15. Slide 15: Tombill Original Mine Near Surface Exploration Program

    TOMBILL ORIGINAL MINE-- NEAR SURFACE EXPLORATION PROGRAM COMMENCING IN 2022, OUR PAST PRODUCING MINE Tombill Original Mine was mined in 1938-42, TOMBILL ORIGINAL MINE 1955 where 68.7k oz AU were produced at 12.36 g/t Borders Trans Canada Hwy, 4km west of Main Group Program of 600 to 900m A strong co

  16. Slide 16: Experienced & Proven Team

    EXPERIENCED & PROVEN TEAM TOP NOTCH TEAM WITH UNPARALLED KNOWLEDGE OF GERALTON CAMP MANAGEMENT Incentivized & Seasoned Adam Horne CEO Leadership Liam Ruddy CFO Thanos Pythagoras Financial Controller Local Knowledge: Hardrock Senior EXPLORATION Geo Team + Ex COO of Centerra + VP Head of Exploration a

  17. Slide 17: Share and Capital Structure

    SHARE AND CAPITAL STRUCTURE C A P I TA L S T R U C T U R E SHAREHOLDER BASE Shares Issued & 172.9 M Outstanding Crescat 8.9% Warrants 48.6 M (@ avg C$0.21) Insiders 7.0% Options 9.8 M (@ avg C$0.16) Fully Diluted Shares 231.4 M Family C$2.3M 44.0% Cash (as at YE 31/10/21) Debt – Free Float 40.1% LIS

  18. Slide 18: Summary-Recap

    SUMMARY-RE CAP • “Donut hole" surrounded by and on strike with Greenstone Mine “CLOSEOLOGY” PLAY IN • Greenstone Mine-to be 3rd or 4th largest Canadian gold mine being built on WORLD CLASS GERALDTON door-step o Mining H2 2022 CAMP o Gold pouring latter half 2024 o Produce 400,000oz Au per annum duri

  19. Slide 19: 26 Grosvenor Gardens London , SW1W 0DH, UK Office: +1 647 493 8270

    Adam Horne Georgia Bevan TSX-V: TBLL Chairman & CEO Corp. Development & IR OTCQB: TBLLF Office: +1 647 493 8270 Office: +1 647 493 8270 Mobile: +44 (0) 7768 258 126 Mobile: +44 (0) 7505 136 285 adam@tombillmines.com georgia@tombillmines.com 26 Grosvenor Gardens London , SW1W 0DH, UK Office: +1 647 4

  20. Slide 20: Appendix

    TSX-V: TBLL OTCQB: TBLLF APPENDIX WWW.TOMBILLMINES.COM 20 | TBLL

  21. Slide 21: Tombill Org Chart

    TOMBILL ORG CHART BOARD OF DIRECTORS ADVISORY BOARD Ray Davies Mark Colman Gordon Reid Quinton Hennigh Director Director Ex-COO of Centerra Crescat Adam Horne Giuseppe Ciardi John Alexander CEO , COB Ron Burk Director Director Strategic Advisor & Head of Exploration & Geology FINANCE, CORPORATE, IR

  22. Slide 22: Management, BOD & Advisory Board

    MANAGEMENT, BOD & ADVISORY BOARD Adam Horne – Chairman & CEO Dr. Quinton Hennigh – Advisory Board Adam is Managing Partner of Caledon Partners, a hedge fund based in London. Quinton is an eco geologist with 25 years of exploration experience and founder, Prior, he ran the European Media Investment B

  23. Slide 23: History of Tombill Mines & Geraldton Gold Camp

    HISTORY OF TOMBILL MINES & GERALDTON GOLD CAMP FROM 1930’S, CAMP EMERGES. PRODUCING DORMANT FROM 1970 UNTIL ANTICIPATED 2024. RE-EMERGENCE OF SERIOUS EXPLORATION FROM 2008 1938-42, 1955 1948-74 1979 Dec 2020 Jan 2021 June 2021 Mining of the Tombill Sporadic mining / Tombill goes public and TB21-005A

Tombill Mines — Investor Presentation (March 2022) on 6ix