  1. Slide 1: Fenn-Gib Gold Project

    FENN-GIB GOLD PROJECT TSX.V: MFG OTCQB: MFGCF FRA: 9M5 CANADA’S FIRST CARBON NEUTRAL GOLD PROJECT: Vision to Build Zero Carbon Mine M A Y 2 0 2 4

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT This presentation contains "forward-looking information" for purposes of applicable securities laws ("forward-looking statements"). Forward-looking statements are neither historical facts nor assurances of future performance. Instead, they are based on the Company's current beli

  3. Slide 3: Current Status

    CURRENT STATUS ASSESSING DEVELOPMENT OPTIONS INDICATED RESOURCE 3.38Moz @ 0.93 G/T AU PFS-LEVEL METALLURGICAL TESTING COMPLETED PFS-LEVEL GEOTECH STUDY COMPLETED BASELINE STUDIES ONGOING PRE-FEASIBILITY STUDY UNDERWAY 2

  4. Slide 4: Fenn-Gib: Top Tier Mining Jurisdiction

    FENN-GIB: TOP TIER MINING JURSIDICTION North Block straddles South Block straddles 4,800 ha: Numerous gold the Pipestone Fault: the Porcupine Fault: occurrences across North Block and hosts current +3 Moz under-explored: no both North and South NI 43-101 resource road access Blocks South Block 3

  5. Slide 5: Fenn-Gib Deposit: Key Attributes

    FENN-GIB DEPOSIT: KEY ATTRIBUTES Location • Excellent access: adjacent to Highway 101, 20km east of Matheson • Renewable grid power, abundant water, and large, skilled labor pool • No camp required • Suitable for remote operations with high-speed connectivity Geology • Broad disseminated mineralizat

  6. Slide 6: Fenn-Gib Deposit

    FENN-GIB DEPOSIT Interim Resource: Indicated 113.7M tonnes @ 0.93 g/t 5

  7. Slide 7: Fenn-Gib Deposit

    FENN-GIB DEPOSIT Potential Open -Pit, Large Tonnage, Low Strip 6

  8. Slide 8: Fenn-Gib Deposit: Conceptual Pit

    FENN-GIB DEPOSIT: CONCEPTUAL PIT CONCEPTUAL OPEN -PIT Similar to Ernest Henry Open Pit: Depth 570m, Diameter 1.3km 7

  9. Slide 9: Bulk Tonnage Deposits: Detour Lake

    BULK TONNAGE DEPOSITS: DETOUR LAKE Current Resource: M&I 277.46Mt @ 0.91 g/t Lenth 3.5km Width 1.2km Ultimate depth 624m 8

  10. Slide 10: Mineral Resource: April 2023

    MINERAL RESOURCE: APRIL 2023 HIGH QUALITY, BULK-MINEABLE RESOURCE • Based on assays of 113,800m of drilling (currently +152,000m) • Pit constrained Indicated resource: 113.7 Mt @ 0.93 g/t Au for 3.38Moz • Pit constrained Inferred resource: 5.7M tonnes @ 0.85 g/t Au for 0.16Moz • Broad disseminated m

  11. Slide 11: Fenn-Gib Mineral Resource Update

    FENN-GIB MINERAL RESOURCE UPDATE Based on 113,800m of 140,000m Drill Program (50 ° Pit Slope) Open-Pit Cut-Off Grade Au Ounces Class Tonnes Grade (g/t Au) (oz) Indicated 0.40 113,687,000 0.93 3,383,000 Inferred 0.40 5,724,000 0.85 157,000 Source: Tim Maunula, P. Geo, T Maunula & Associates Consultin

  12. Slide 12: Metallurgical Testing

    METALLURGICAL TESTING WORLD CLASS GOLD RECOVERIES • Advanced met testing for PFS completed at SGS • Two recommended flowsheets: • Flotation to Final Concentrate—98% Au recoveries • Flotation – Regrind – Cyanidation—94% Au recoveries • Phase 1: Flotation to Final Concentrate for offsite treatment • C

  13. Slide 13: Flowsheet Options

    FLOWSHEET OPTIONS FLOW SHEETS SIMILAR TO NORTHERN STAR’S KCGM OPERATION 12

  14. Slide 14: High-Grade Starter Pit

    HIGH-GRADE STARTER PIT +600,000 oz @ ~1.35 g/t – Rapid Repayment of Capital High Grade Starter Pit 13

  15. Slide 15: Infill, Expansion and Exploration Drilling

    INFILL, EXPANSION AND EXPLORATION DRILLING 1. Main Deposit: infill drilling complete 2. East Extension: drilling to continue 3. Contact Zone: drilling completed 4. Footwall Zone: drilling to continue 5. Exploration drilling: drilling to continue 14

  16. Slide 16: Eastern Extension

    EASTERN EXTENSION High-Grade Zone Plunging to the Southeast 15

  17. Slide 17: Eastern Extension

    EASTERN EXTENSION High-Grade Zone Plunging to the Southeast Access for Summer Drilling 16

  18. Slide 18: Footwall Zone Discovery

    FOOTWALL ZONE DISCOVERY Footwall Zone Mafic Volcanics Main Zone Pyroxenite Porcupine Sediments 7 Open-Pit METERS MAYFAIRCOLD

  19. Slide 19: Footwall Zone Discovery

    FOOTWALL ZONE DISCOVERY FG21-211 FG21-215 FG21-218 2021 JDS FG22-222 Conceptual FG21-220 Pit Outline FG22-215 2.88 g/t Au over Fenn-Gib 49.0m incl Zone 6.53 g/t Au over 17.5m FG22-218 0.71 g/t Au over 92.0m incl. 2.15 g/t Au over 10.0 FG22-218 2.40 g/t Au over 47.4m incl. 0.0 12.5 3.83 g/t Au over 4

  20. Slide 20: Footwall Zone Model

    FOOTWALL ZONE MODEL ~800m +700m 19

  21. Slide 21: Footwall Zone Model

    FOOTWALL ZONE MODEL FG23-311 secondary altered/mineralized Mafic volcanics (i setimentary rocks (Porcupine Group Sediments) IHF afc vteanirocks massive plowed vail ws) [Ty tere mate vokanc rocks (erced, serie carbonate aie atered) BiB vrramaticvoeaic rocks (a Frersiteatered amas okanc rook (geencarb

  22. Slide 22: Footwall Zone Extension: Drilling Now

    FOOTWALL ZONE EXTENSION: DRILLING NOW Fenn-Gib Deposit 21

  23. Slide 23: Contact Zone: Below Pit

    CONTACT ZONE: BELOW PIT High-Grade Main Zone Plunging to the Southeast: Underground Potential 22

  24. Slide 24: Contact Zone Drilling

    CONTACT ZONE DRILLING MAYFAIRCOLD coro a g 41.14 g/tAu / 496.0m nc. 2.84 e/tAu /21.0m & eftAu /19.0m8 2.40 g/tAu /31.2mincl. ‘5.45 g/tau /19.0m 5 & a 0 Ge (0.61 g/tAu /168.2m inl Lad g/t Au /38.1m et 2023 resource pit shell "28% ell 0.73g/tAu /47.0m Wa H i 16 g/tAu /42imindl 1.60 g/t Au /209.0m inet

  25. Slide 25: Contact Zone: Underground Potential

    CONTACT ZONE: UNDERGROUND POTENTIAL Footwall Zone Main Deposit Contact Zone 24

  26. Slide 26: Fenn-Gib Regional Exploration

    FENN-GIB REGIONAL EXPLORATION Fenn-Gib Deposit 25

  27. Slide 27: North Block Regional Drill Targets

    NORTH BLOCK REGIONAL DRILL TARGETS Fenn-Gib Deposit 26

  28. Slide 28: South Block: Potential for New Discoveries

    SOUTH BLOCK: POTENTIAL FOR NEW DISCOVERIES 27

  29. Slide 29: South Block: Airborne Mag Survey

    SOUTH BLOCK: AIRBORNE MAG SURVEY 28

  30. Slide 30: South Block Ground Geophysics

    SOUTH BLOCK GROUND GEOPHYSICS 29

  31. Slide 31: ESG Vision: Carbon Neutral Gold Mine

    ESG VISION: CARBON NEUTRAL GOLD MINE CA A A’S FIRS E ZERO CARBON GOLD PROJECT 30

  32. Slide 32: ESG Vision: Zero Carbon Gold Mine

    ESG VISION: ZERO CARBON GOLD MINE OPPORTUNTIES TO DECARBONIZE • Mobile fleet emits +50% of GHG: Alternatives: hydrogen/battery electric • Processing emits +30% of GHG: Renewable hydropower • Heating emits 5-10% of GHG: Renewable hydropower • Drilling and blasting emits +5% of GHG: Battery electric •

  33. Slide 33: Capital Structure & Major Shareholders

    CAPITAL STRUCTURE & MAJOR SHAREHOLDERS CAPITAL STRUCTURE MAJOR SHAREHOLDERS Shares Outstanding 100.3M Options 8.03M ➢Insiders/founders ~28% Warrants Nil Fully Diluted 108.3M ➢HNW retail ~18% Market Cap ~C$210M ➢Muddy Waters Capital +16% CASH End Q1 C$10M ➢Canadian pension plan +5% Current ~C$4M 32

  34. Slide 34: Summary

    SUMMARY LOW RISK, SUSTAINABLE ASSET • JURISDICTION: Low risk; security of title • LOCATION: Low risk; abundant power, water, labor • GEOLOGY: Low risk; outcropping; bulk mineable • METALLURGY: Low risk; standard flowsheet options; high recoveries • DEVELOPMENT: Low risk; conventional development • C

  35. Slide 35: Vision

    VISION TARGET: TIER-ONE ASSET CURRENT RESOURCE: 3.38Moz INDICATED “FIRST MINE” TARGET: 4Moz NORTH BLOCK REGIONAL TARGET: +1Moz SOUTH BLOCK REGIONAL TARGET: +1Moz FENN-GIB TARGET: +5Moz 34

  36. Slide 36: Mayfair Gold Corp

    MAYFAIR Patrick Evans GOLD CORP President and CEO WWW.MAYFAIRGOLD.CA TSX.V: MFG OTC: MFGCF FRA: 9M5 PATRICK@MAYFAIRGOLD.CA (800) 342-6705 35

  37. Slide 37: Appendices

    APPENDICES A.1 Leadership A.2 2024 Business Plan A.3 Interim resource Update (Oct. 2023) A.4 Fenn-Gib Development Options

  38. Slide 38: Leadership

    LEADERSHIP MANAGEMENT BOARD OF DIRECTORS Patrick Evans Howard Bird Harry Pokrandt Doug Cater CEO VICE PRESIDENT EXPLORATION Chairman ▪ 23+ years of senior management ▪ 30+ years of exploration, ▪ 30+ years of capital markets ▪ Professional geologist with +35 experience at public mining development a

  39. Slide 39: 2024 Business Plan

    2024 BUSINESS PLAN 25,000m Phase 6 drill program Resource update Q2 2024 Pre-feasibility study Completed Planned Underway Regional exploration Baseline environmental studies Definitive feasibility study To continue Year 4 underway Planned TIMELINE TO DEVELOPMENT OF FIRST MINE 2025 2026 Permitting Pe

  40. Slide 40: Fenn-Gib Interim Resource Update

    FENN-GIB INTERIM RESOURCE UPDATE Gold Cut- Resources Tonnage Gold Grade Gold Ounces Off Grade Category (T X 1000) (g/t) (oz) (g/t) Pit-Constrained Resources 0.70 57,004 1.32 2,418,000 0.60 70,830 1.19 2,706,000 0.55 79,449 1.12 2,865,000 0.50 89,424 1.06 3,033,000 0.45 100,785 0.99 3,206,000 Indicat

  41. Slide 41: Fenn-Gib Development Options

    FENN-GIB DEVELOPMENT OPTIONS FENN-GIB PROJECT HWY 101 BLACK FOX MINE A.4