Stelco Holdings Inc

Stelco — Corporate Update (January 2018)

24 slides from Stelco's corporate update, Jan 24, 2018

  1. Slide 1: Hamilton Works Community Liaison Committee Meeting

    Hamilton Works Community Liaison Committee Meeting January 2018 Andy Sebestyen

  2. Slide 2: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 28 Sept 2017 4. Performance under O.Reg. 419/ 05 Site Specific Standard Order – Particulates 5. Greenhouse Gas Reduction Projects 6. Community Concerns 7. Adjournment

  3. Slide 3: Know Your Emergency Exits

    Know Your Emergency Exits Review Evacuation Routes of the room you are located in

  4. Slide 4: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 28 Sept 2017 4. Performance under O.Reg. 419/ 05 Site Specific Standard Order – Particulates 5. Update – O.Reg. 419/ 05 Site Specific Standard Order - Benzene 6. Greenhouse Gas Reduction Projec

  5. Slide 5: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 28 Sept 2017 4. Performance under O.Reg. 419/ 05 Site Specific Standard Order – Particulates 5. Update – O.Reg. 419/ 05 Site Specific Standard Order - Benzene 6. Greenhouse Gas Reduction Projec

  6. Slide 6: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 28 Sept 2017 4. Performance under O.Reg. 419/ 05 Site Specific Standard Order – Particulates 5. Update – O.Reg. 419/ 05 Site Specific Standard Order - Benzene 6. Greenhouse Gas Reduction Projec

  7. Slide 7: Site-Specific Standard Order (Particulates): Performance Review – Daily

    Site-Specific Standard Order (Particulates): Performance Review – Daily Date Doors Lids Off-takes (% Leaks) (% Leaks) (% Leaks) 2015 Limits 54% 2% NA (July 2 start) 2016 Limits 32% 2% NA 2017-2019 Limits 10% 2% 5% 2020 Limits 5% 1% 4% Jan. 1 to Dec. 31, 2017 0 – 3.66% 0 – 1.50% 0 – 3.80% Range (0.12

  8. Slide 8: Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages

    Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages Date Doors Lids Off-takes Charging (% Leaks) (% Leaks) (% Leaks) (sec) (log avg) 2015 Limits 38% 0.8% 25% 12 sec (July 2 start) 2016 Limits 22.5% 0.8% 15% 12 s 2017-2019 Limits 7% 0.8% 4.2% 12 s 2020 Limits 4%

  9. Slide 9: Performance Review – Daily Observations – Pushing Emissions

    Site-Specific Standard Order (Particulates): Performance Review – Daily Observations – Pushing Emissions Date Pushing Emission (opacity %) 2015 Limit (July 2 start) ≥50% 2016 – 2018 ≥50% 2019 ≥ 40% 2020 ≥ 30% Jan. 1 to Dec. 31, 2017 Range 0 – 48.33 % (Average) (2.70 %) 0 – 48.33 % Pushes > = 84 per

  10. Slide 10: Performance Review – Additional Items

    Site-Specific Standard Order (Particulates): Performance Review – Additional Items • There were 3 community complaints since the last CLC meeting: 1. Black dust (Oct. 30, 2017 - 1 resident near St. Christopher Park area) 2. Black dust (Jan. 8, 2018 – 2 Beach Blvd residents) (Not specific to Stelco,

  11. Slide 11: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 28 Sept 2017 4. Performance under O.Reg. 419/ 05 Site Specific Standard Order – Particulates 5. Update – O.Reg. 419/ 05 Site Specific Standard Order - Benzene 6. Greenhouse Gas Reduction Projec

  12. Slide 12: Update – O.Reg. 419/05 Site Specific Standard Order - Benzene

    Update – O.Reg. 419/05 Site Specific Standard Order - Benzene

  13. Slide 13: Update – O.Reg. 419/05 Site Specific Standard Order - Benzene

    Update – O.Reg. 419/05 Site Specific Standard Order - Benzene Problem: • Structural weakness identified in the tar storage tank (Tank #23) Solution: • Rebuild another storage tank (Tank #25) and connect it to the nearby Vapour Recovery System at the Clarifier • Reduced piping • New tank • Tank is lo

  14. Slide 14: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 28 Sept 2017 4. Performance under O.Reg. 419/ 05 Site Specific Standard Order – Particulates 5. Update – O.Reg. 419/ 05 Site Specific Standard Order - Benzene 6. Greenhouse Gas Reduction Projec

  15. Slide 15: OCE Project #27602

    OCE Project #27602 Utilization of Bio-Carbon to Reduce Fossil Carbon Input Requirements for Coke Production 15

  16. Slide 16: OCE Project #27602: Utilization of Bio-Carbon to Reduce Fossil Carbon

    OCE Project #27602: Utilization of Bio-Carbon to Reduce Fossil Carbon Input Requirements for Coke Production Applicant: Stelco Inc. - Hamilton Plant, #7 Coke Battery 16

  17. Slide 17: OCE Project #27602: Solution Provider

    OCE Project #27602: Utilization of Bio-Carbon to Reduce Fossil Carbon Input Requirements for Coke Production Solution Provider: Walker Environmental - Thorold, Ontario 17

  18. Slide 18: Converting Coal to Coke

    Converting Coal to Coke • Blend of coal is charged into tall slot ovens • Coal is heated for 18 hours at 1100°C in the absence of oxygen & converted into coke (nearly pure carbon) • QA/QC to determine coke quality • Coke is used in the Blast Furnace • Coke Oven gas is processed at the By-Product Pla

  19. Slide 19: Producing Iron from Iron Ore

    Producing Iron from Iron Ore • The Blast Furnace converts iron ore into molten iron metal at 1450°C Iron ore & limestone for Steelmaking • Blast Furnace gas is used for steam & electricity Coke 1100°C Fe2O3 + 3CO —› 2Fe + 3CO2 19

  20. Slide 20: Walker Environmental Process Flow Grinding Railway Ties

    Walker Environmental Process Flow Grinding Railway Ties 20

  21. Slide 21: Greenhouse Gas Reduction Opportunity

    Greenhouse Gas Reduction Opportunity Replace a portion of the fossil carbon (coal) with bio- carbon (used railway ties) Innovative technology: First application in a Canadian steel plant 21

  22. Slide 22: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 28 Sept 2017 4. Performance under O.Reg. 419/ 05 Site Specific Standard Order – Particulates 5. Update – O.Reg. 419/ 05 Site Specific Standard Order - Benzene 6. Greenhouse Gas Reduction Projec

  23. Slide 23: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 28 Sept 2017 4. Performance under O.Reg. 419/ 05 Site Specific Standard Order – Particulates 5. Update – O.Reg. 419/ 05 Site Specific Standard Order - Benzene 6. Greenhouse Gas Reduction Projec

  24. Slide 24: Thank You.

    Thank You. stelcocanada.com