Slide 1: Hamilton Works Community Liaison Committee Meeting
Hamilton Works Community Liaison Committee Meeting January 2018 Andy Sebestyen
Slide 2: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 28 Sept 2017 4. Performance under O.Reg. 419/ 05 Site Specific Standard Order – Particulates 5. Greenhouse Gas Reduction Projects 6. Community Concerns 7. Adjournment
Slide 3: Know Your Emergency Exits
Know Your Emergency Exits Review Evacuation Routes of the room you are located in
Slide 4: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 28 Sept 2017 4. Performance under O.Reg. 419/ 05 Site Specific Standard Order – Particulates 5. Update – O.Reg. 419/ 05 Site Specific Standard Order - Benzene 6. Greenhouse Gas Reduction Projec
Slide 5: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 28 Sept 2017 4. Performance under O.Reg. 419/ 05 Site Specific Standard Order – Particulates 5. Update – O.Reg. 419/ 05 Site Specific Standard Order - Benzene 6. Greenhouse Gas Reduction Projec
Slide 6: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 28 Sept 2017 4. Performance under O.Reg. 419/ 05 Site Specific Standard Order – Particulates 5. Update – O.Reg. 419/ 05 Site Specific Standard Order - Benzene 6. Greenhouse Gas Reduction Projec
Slide 7: Site-Specific Standard Order (Particulates): Performance Review – Daily
Site-Specific Standard Order (Particulates): Performance Review – Daily Date Doors Lids Off-takes (% Leaks) (% Leaks) (% Leaks) 2015 Limits 54% 2% NA (July 2 start) 2016 Limits 32% 2% NA 2017-2019 Limits 10% 2% 5% 2020 Limits 5% 1% 4% Jan. 1 to Dec. 31, 2017 0 – 3.66% 0 – 1.50% 0 – 3.80% Range (0.12
Slide 8: Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages
Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages Date Doors Lids Off-takes Charging (% Leaks) (% Leaks) (% Leaks) (sec) (log avg) 2015 Limits 38% 0.8% 25% 12 sec (July 2 start) 2016 Limits 22.5% 0.8% 15% 12 s 2017-2019 Limits 7% 0.8% 4.2% 12 s 2020 Limits 4%
Slide 9: Performance Review – Daily Observations – Pushing Emissions
Site-Specific Standard Order (Particulates): Performance Review – Daily Observations – Pushing Emissions Date Pushing Emission (opacity %) 2015 Limit (July 2 start) ≥50% 2016 – 2018 ≥50% 2019 ≥ 40% 2020 ≥ 30% Jan. 1 to Dec. 31, 2017 Range 0 – 48.33 % (Average) (2.70 %) 0 – 48.33 % Pushes > = 84 per
Slide 10: Performance Review – Additional Items
Site-Specific Standard Order (Particulates): Performance Review – Additional Items • There were 3 community complaints since the last CLC meeting: 1. Black dust (Oct. 30, 2017 - 1 resident near St. Christopher Park area) 2. Black dust (Jan. 8, 2018 – 2 Beach Blvd residents) (Not specific to Stelco,
Slide 11: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 28 Sept 2017 4. Performance under O.Reg. 419/ 05 Site Specific Standard Order – Particulates 5. Update – O.Reg. 419/ 05 Site Specific Standard Order - Benzene 6. Greenhouse Gas Reduction Projec
Slide 12: Update – O.Reg. 419/05 Site Specific Standard Order - Benzene
Update – O.Reg. 419/05 Site Specific Standard Order - Benzene
Slide 13: Update – O.Reg. 419/05 Site Specific Standard Order - Benzene
Update – O.Reg. 419/05 Site Specific Standard Order - Benzene Problem: • Structural weakness identified in the tar storage tank (Tank #23) Solution: • Rebuild another storage tank (Tank #25) and connect it to the nearby Vapour Recovery System at the Clarifier • Reduced piping • New tank • Tank is lo
Slide 14: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 28 Sept 2017 4. Performance under O.Reg. 419/ 05 Site Specific Standard Order – Particulates 5. Update – O.Reg. 419/ 05 Site Specific Standard Order - Benzene 6. Greenhouse Gas Reduction Projec
Slide 15: OCE Project #27602
OCE Project #27602 Utilization of Bio-Carbon to Reduce Fossil Carbon Input Requirements for Coke Production 15
Slide 16: OCE Project #27602: Utilization of Bio-Carbon to Reduce Fossil Carbon
OCE Project #27602: Utilization of Bio-Carbon to Reduce Fossil Carbon Input Requirements for Coke Production Applicant: Stelco Inc. - Hamilton Plant, #7 Coke Battery 16
Slide 17: OCE Project #27602: Solution Provider
OCE Project #27602: Utilization of Bio-Carbon to Reduce Fossil Carbon Input Requirements for Coke Production Solution Provider: Walker Environmental - Thorold, Ontario 17
Slide 18: Converting Coal to Coke
Converting Coal to Coke • Blend of coal is charged into tall slot ovens • Coal is heated for 18 hours at 1100°C in the absence of oxygen & converted into coke (nearly pure carbon) • QA/QC to determine coke quality • Coke is used in the Blast Furnace • Coke Oven gas is processed at the By-Product Pla
Slide 19: Producing Iron from Iron Ore
Producing Iron from Iron Ore • The Blast Furnace converts iron ore into molten iron metal at 1450°C Iron ore & limestone for Steelmaking • Blast Furnace gas is used for steam & electricity Coke 1100°C Fe2O3 + 3CO —› 2Fe + 3CO2 19
Slide 20: Walker Environmental Process Flow Grinding Railway Ties
Walker Environmental Process Flow Grinding Railway Ties 20
Slide 21: Greenhouse Gas Reduction Opportunity
Greenhouse Gas Reduction Opportunity Replace a portion of the fossil carbon (coal) with bio- carbon (used railway ties) Innovative technology: First application in a Canadian steel plant 21
Slide 22: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 28 Sept 2017 4. Performance under O.Reg. 419/ 05 Site Specific Standard Order – Particulates 5. Update – O.Reg. 419/ 05 Site Specific Standard Order - Benzene 6. Greenhouse Gas Reduction Projec
Slide 23: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 28 Sept 2017 4. Performance under O.Reg. 419/ 05 Site Specific Standard Order – Particulates 5. Update – O.Reg. 419/ 05 Site Specific Standard Order - Benzene 6. Greenhouse Gas Reduction Projec
Slide 24: Thank You.
Thank You. stelcocanada.com