Luca Mining Corp · TSXV:LUCA

Luca Mining — Investor Presentation (February 2026)

25 slides from Luca Mining's investor presentation, Feb 4, 2026

  1. Slide 1: Optimization Exploration Expansion

    February 2026 TSX-V: LUCA | OTCQX: LUCMF | FRANKFURT: Z68 | L U C A LMUI CNAI MN IGN .I C NGO .M COM 1 Optimization Exploration Expansion

  2. Slide 2: Forward Looking Statements

    LUCAMINING.COM 2 Canadian regulatory agencies and available at www.sedarplus.ca. The Company Company’s anticipated future business operations. The Company disclaims any FORWARD LOOKING STATEMENTS believes that the expectations reflected in Forward-Looking Information in this Corporate Presentation a

  3. Slide 3: Mexico Mining Experts

    LUCAMINING.COM 3 MEXICO MINING EXPERTS Some of the largest mining companies in the world Mining in Mexico surround us in Mexico We know Mexico - and our experienced management team and our knowledge of the Mexican mining landscape give us a competitive advantage 3

  4. Slide 4: Our Metal Breakdown

    LUCAMINING.COM 4 OUR METAL BREAKDOWN ~50/50 Precious and Base metals YTD 2025 (9-Months) Revenue by Metal - Consolidated 18% COPPER Copper 20% Gold 37% Zinc 23% Lead 2% Silver 18% 4

  5. Slide 5: The Luca Story

    LUCAMINING.COM 5 The Luca Story TAHUEHUETO 2 Fully permitted operating mines in DE-RISKED OPERATIONS Fully permitted No further major capex required FREE CASH FLOW 2025 ESTIMATE Beat Revised Guidance of $5 to $10 million Dec 31: Increased cash to $25.5 million from US$15.9M at Sept 30 Mexico produci

  6. Slide 6: Our Plan

    LUCAMINING.COM 66 Commission Tahuehueto Our Plan Commercial production achieved Q1/25. Record 970tpd in Q3  +190% y/y increase Explore Tahuehueto …underway 2026 First assays in over a decade – exciting new gold zones discovered. Drilling at Santiago returning wide, high-grade gold Ramp up Campo Mor

  7. Slide 7: Three-Year, US$25 Million Exploration Program to Unlock Gold Potential

    LU LUCC AMAM I NI N I NI N GG. C. C OOMM 7 7 Three-Year, US$25 Million Exploration Program to Unlock Gold Potential at Campo Morado and Tahuehueto District-scale gold discovery potential across Luca's two producing mines • 80,000 metres of diamond drilling (surface & underground) • To expand and def

  8. Slide 8: What this Means

    LUCAMINING.COM 8 What this Means Our mines are permitted, Our mines have Luca is heading towards re-ranking in production and development and resource as a mid-tier producer generating cash flow – upside and optimization at our foundation on which to both projects is ongoing grow Clean balance sheet

  9. Slide 9: The Skills We Bring to De-risk M&A

    LUCAMINING.COM 9 The Skills We Bring to De-risk M&A: FINANCIAL OPERATIONS Luca has the expertise to restructure and recapitalize Luca has the ability to turn around and optimize on accretive terms for shareholders mining assets  Since Jan 1, 2024, debt has been reduced  Campo Morado throughput inc

  10. Slide 10: Campo Morado

    LUCAMINING.COM 10 GLOBAL M&I GOLD ZINC COPPER SILVER LEAD 16.6 Mt M&I 700 Koz M&I 1.2 Blbs M&I 0.2 Blbs M&I 62 Moz M&I 0.3 Blbs M&I CAMPO Location Guerrero State 121 sq km Processing 2,400 tpd throughput capacity (crushing, milling, flotation) MORADO Ownership 100% 2025E Production Achieved Revised

  11. Slide 11: Reforma and El Rey

    LUCAMINING.COM 11 Reforma and el Rey Un-mined Deposits Higher Precious Metals Grades First drilling in >10 years July 7, 2025: First Surface Drill Result at Reforma 15.1 metres of 13.4 g/t AuEq (5.35 g/t Au, 187.48 g/t Ag, 0.31% Cu, 8.39% Zn, 2.75% Pb) Aug 27, 2025: Additional Drill Results at Refor

  12. Slide 12: Exploration Upside at Campo Morado

    L U CC A AMM II N N II NN GG .. CC OOM M 12 Main Declines, Development exploration upside G9, Naranjo and Largo Ore Bodies at Campo morado • Well-defined, drilled and developed ore bodies • Expand gold and silver-rich Mineral Resources • 38 exploration targets • >12,000-hectare mining concession • >

  13. Slide 13: Campo Morado 4.0 – Gold Opportunity

    LU LUCC AMAM I NI N I NI N GG. C. C OOMM 1313 Campo Morado 4.0 – Gold Opportunity 4 3 implementation • Modifications to processing circuit 2 Economics can be implemented efficiently • An increase in recovery and 1 metallurgy grade could materially • No major new permit requirements • Cyanidation for

  14. Slide 14: Reforma – The Future of Campo Morado

    LUCAMINING.COM 14 Reforma – The future of campo morado • Current Mining Areas: Southwest, G9 Zones, El Largo • Large stopes 40m wide, Reforma: -2028 and beyond productive, low-cost mining -Higher gold grades • 2024 mining cost: $35/t -Efficient mining -Shorter haul to mill • Starting in 2028: Reform

  15. Slide 15: Tahuehueto

    LUCAMINING.COM 15 GLOBAL M&I GOLD ZINC COPPER SILVER LEAD 6.3 Mt M&I 425 Koz M&I 273 Mlbs M&I 36 Mlbs M&I 9 Moz M&I 123 Mlbs M&I Tahuehueto Location Durango State 100 sq km Processing 1,200 tpd throughput capacity (crushing, milling, flotation) Ownership 100% 2025E Full Year Achieved Revised Guidanc

  16. Slide 16: Tahuehueto

    LUCAMINING.COM 16 Tahuehueto LEVEL 12 & 14 PORTALS LEVEL 20 PORTAL CRUSHING CIRCUIT MINE CAMP PROCESS PLANT 16

  17. Slide 17: Transformative Exploration Potential at Tahuehueto

    LUCAMINING.COM 17 Transformative exploration potential at tahuehueto CONNECTING CRESTON/EL PERDIDO TO SANTIAGO Drilling is underway to investigate the highly prospective gap between El Perdido and Santiago with two active rigs Zones are open along strike and to depth EARLY RESULTS CONFIRM GROWTH POT

  18. Slide 18: Luca Corporate Stats

    LUCAMINING.COM 18 2.50 Luca corporate stats PRICE 2.00 CHART 1.50 One Year LUCA LUCMF Z68 1.00 TSXV OTCQX Frankfurt 0.50 Shares 269 million Outstanding 0.00 Fully Diluted 290 million Market Cap C$551 million (C$2.05/share) (Feb 4, 2026) ANALYSTS 52 Week C$2.16 high Haywood Buy C$4.50 C$0.88 low SHAR

  19. Slide 19: A Strong Board of Directors

    LUCAMINING.COM 19 A strong Board of directors Mine builders | Opportunity driven Phil Brumit DIRECTOR Peter Damouni CHAIRMAN, DIRECTOR Mr. Brumit is a mining executive with over 40 years of experience in Over 20 years of corporate and investment banking experience with a property evaluation, enginee

  20. Slide 20: A Strong Management Team

    LUCAMINING.COM 20 A strong MANAGEMENT TEAM Effective Execution Dan Barnholden, CEO Dan Barnholden is a seasoned professional with over 20 years of experience in senior mining investment banking roles at bank-owned Ramon Mendoza M.Sc., P.Eng. COO & CTO and boutique dealers in Toronto and Vancouver .

  21. Slide 21: What's Next

    LUCAMINING.COM 21 What’s next We see a near-term With significant And longer term valuation re-rating additional upside growth ahead The Campo Morado Production upside at both mines M&A growth copper/zinc/gold/silver mine has Targeting doubling production in the Targeting mid-tier ranking with under

  22. Slide 22: Thank You

    LUCAMINING.COM 22 Thank You LUCAMINING.COM TSX-V: LUCA OTCQX: LUCMF FRANKFURT: Z68

  23. Slide 23: Appendix

    LUCAMINING.COM 23 APPENDIX 23

  24. Slide 24: Campo Morado Resources

    LUCAMINING.COM 24 Campo Morado Resources RESOURCES (NI 43-101 Compliant, March 2018) 24

  25. Slide 25: Tahuehueto Resources

    LUCAMINING.COM 25 Tahuehueto resources RESERVES & RESOURCES (NI 43-101 Compliant, April 2022) 25

Luca Mining — Investor Presentation (February 2026) on 6ix