  1. Slide 1: 2025 Electric Integrated Resource Plan TAC Meeting No. 11 Agenda

    2025 Electric Integrated Resource Plan Technical Advisory Committee Meeting No. 11 Agenda Tuesday, July 30, 2024 Virtual Meeting – 8:30 am to 10:00 am PTZ Topic Staff Introductions John Lyons Connected Communities Program Update Kit Parker Avista – Spokane Tribe Energy Resiliency Partnership Update

  2. Slide 2: 2025 IRP TAC 11 Introductions

    2025 IRP TAC 11 Introductions John Lyons, Ph.D. Technical Advisory Committee Meeting No. 11 July 30, 2024

  3. Slide 3: Today's Agenda

    Today’s Agenda Introductions, John Lyons Connected Communities Program Update, Kit Parker Avista – Spokane Tribe Energy Resiliency Partnership Update, Meghan Pinch Preferred Resource Strategy Results, Planning Team Avoided Costs, James Gall Remaining TAC Schedule and Scenario Planning, James Gall 2

  4. Slide 4: Remaining 2025 Electric IRP TAC Schedule

    Remaining 2025 Electric IRP TAC Schedule • TAC 12: August 13, 2024: 8:30 to 10:00 (PTZ) – Scheduled o Preferred Resource Strategy Results (continued) o Portfolio Scenario Analysis (continued) o LOLP Study Results (continued) o QF Avoided Cost • Propose to extend TAC 12 meeting to 2.5 hours and move

  5. Slide 5: Remaining 2025 Electric IRP TAC Schedule

    Remaining 2025 Electric IRP TAC Schedule • Virtual Public Meeting- Natural Gas & Electric IRP (Moving to November 2024) o Recorded presentation o Daytime comment and question session (12pm to 1pm- PST) o Evening comment and question session (6pm to 7pm- PST) • October 1, 2024- Remainder of Draft IRP

  6. Slide 6: Connected Communities

    Connected Communities Kit Parker, Renewables Products and Services Manager Technical Advisory Committee Meeting No. 11 July 30, 2024

  7. Slide 7: Program Objectives

    Program Objectives • Create flexible load • Foster community-based 75-125 Buildings and Homes • Reduce energy costs solutions 50-75 Residential and 25-50 Commercial • Maintain occupant comfort • Develop scalable model 1 - 2.25MW During Program Flex Events Flexible Load Created Flex Event 1-4 hours G

  8. Slide 8: Project Timeline

    Project Timeline PROJECT PILOT TESTING ANALYZE & REVIEW & PLANNING ASSESSMENT PHASE EVALUATE PUBLISH Strategic planning and Enrollment of first Completion of Aggregation and Finalization of a business design for delivering participants and testing enrollment and analysis examination of energy model

  9. Slide 9: Avista - Spokane Tribe Energy Resiliency Partnership Update

    Avista - Spokane Tribe Energy Resiliency Partnership Update Meghan Pinch, Manager, Energy Efficiency Programs Technical Advisory Committee Meeting No. 11 July 30, 2024

  10. Slide 10: Clean Energy Fund Grid Modernization Grant Award Overview

    Clean Energy Fund Grid Modernization Grant Award Overview Awarded project: Financial support to design and engineer a clean and resilient energy storage project in partnership with the Spokane Tribe. The project will support increased energy resilience and energy sovereignty. Funding does not includ

  11. Slide 11: Spokane Tribe Grid Resiliency Station

    Spokane Tribe Grid Resiliency Station “Switchable” platform that could enable power to be switched between three or more stepdown circuits in an emergency Would replace elevated building transformers currently behind post office / trading post Would create a “critical loads” circuit to provide power

  12. Slide 12: Equipment Layout Concept

    Equipment Layout Concept PN) MUGEN DOs) Ae AIWISTA

  13. Slide 13: Recent Activities and Next Steps

    Recent Activities and Next Steps • Avista provided technical assistance to the Tribe in applying for $2.75 million from Department of Commerce Tribal Clean Energy Grant • Additional funding been committed from a mix of federal formula Tribal DOE grants and Avista-provided funding • Total project cos

  14. Slide 14: 2025 Electric Integrated Resource Plan Draft Preferred Resource Strategy

    2025 Electric Integrated Resource Plan Draft Preferred Resource Strategy James Gall Technical Advisory Committee Meeting No. 11 July 30, 2024

  15. Slide 15: Preferred Resource Strategy (7/16/2024)

    DRAFT Preferred Resource Strategy (7/16/2024) Nameplate MW 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 Shared System Resource Mrkt/Trans 40 4 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Natural Gas 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Solar 0 0 0 0

  16. Slide 16: Revised Preferred Resource Strategy (2026-35)

    Revised Preferred Resource Strategy (2026-35) 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Total Washington (MW- Nameplate) Market 25.8 2.5 6.4 - - - - - - - 34.6 Regional Transmission - - - - - - - 198.4 - - 198.4 Natural Gas - - - - - - - - - - - Solar - 0.5 0.6 0.6 0.7 0.8 0.8 1.0 0.5 0.5 5.

  17. Slide 17: Revised Preferred Resource Strategy (2036-45)

    Revised Preferred Resource Strategy (2036-45) 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 Total Washington (MW- Nameplate) Market - - - - - - - - - - - Regional Transmission - - - - - - - - - - - Natural Gas - - - - - - - - - - - Solar 0.5 0.5 0.5 0.5 0.5 0.5 0.5 180.5 120.5 0.6 305.1 Wind - -

  18. Slide 18: North Plains Connector

    North Plains Connector At the 7/16/2024 TAC Meeting: 300 MW of this resource was selected between 2037-45. It was discussed this resource cannot be acquired in increments and not all benefits were modeled at this time 5

  19. Slide 19: Wind Selection Observations

    Wind Selection Observations • 850 MW of wind is selected between 2029-2033, this is a financially beneficial early action taking advantage of IRA benefits and low PPA prices. – If tax credits change or low priced PPA terms do not materialize, this selection will change. – Avista has limited transmis

  20. Slide 20: Demand Response

    DRAFT Demand Response Program Customer Segment Washington WA Idaho ID Start Year Start Year Electric Vehicle TOU Commercial 2026 8.8 2029 0.7 Battery Energy Storage All 2026 10.4 2035 1.5 Variable Peak Pricing Large Commercial 2026 5.4 2029 1.7 Peak Time Rebate Residential/Sm. Com. 2035 5.5 2040 4.0

  21. Slide 21: Energy Efficiency Top Measure Types

    Energy Efficiency Top Measure Types Row Measure State 2035 Row Measure State 2035 1 Linear Lighting WA 81.34 1 Linear Lighting ID 43.34 2 Windows - High Efficiency (ENERGY STAR 7.0) WA 27.98 2 High-Bay Lighting ID 12.70 3 High-Bay Lighting WA 25.00 3 Water Heater - Pipe Insulation ID 7.90 4 Water He

  22. Slide 22: Avista Transmission Considerations

    DRAFT Avista Transmission Considerations • Rathdrum Area: New natural gas CTs begin in 2030, these are likely located in North Idaho, new transmission will be required, if projects continue to be sited in the area additional reinforcement is needed. • Off-System Imports: Need to increase connections

  23. Slide 23: Clean Energy Forecast

    Clean Energy Forecast 140% 120% Existing New 100% 38% 77% 21% 13% 28% 12% 35% 27% 55% 80% Percent of Load 11% 10% 60% 40% 81% 77% 79% 80% 77% 78% 75% 73% 72% 71% 66% 68% 60% 54% 56% 20% 0% Washington Washington Washington Washington Washington Idaho Idaho Idaho Idaho Idaho System System System Syste

  24. Slide 24: Average Energy Rate Forecast

    Average Energy Rate Forecast $0.30 Electric Washington $0.25 Electric Idaho $0.20 $ per kWh $0.15 $0.10 $0.05 $0.00 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 Assumes non-modelled cost increase by 3.8% per year 12

  25. Slide 25: Washington Energy Burden CBI

    DRAFT Washington Energy Burden CBI #2b: Percent of WA Customers with Excess Energy Burden #2a: WA Customers with Excess Energy Burden (Before Energy Assistance) (Before Energy Assistance) 70,000 25.0% 60,000 20.0% 50,000 15.0% 40,000 30,000 10.0% 20,000 5.0% 10,000 0 0.0% 2026 2027 2028 2029 2030 20

  26. Slide 26: DER Additions CBI

    DRAFT DER Additions CBI #5a: Total MWh of DER <5MW in Named Communities 200,000 180,000 160,000 MWh 140,000 120,000 100,000 80,000 60,000 40,000 20,000 0 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 #5b: Total MWh Capability of DER Storage <5MW

  27. Slide 27: WA Low Income/Named Community Investments CBI

    DRAFT WA Low Income/Named Community Investments CBI #6: Approximate Low Income/Named Community Investment and Benefits $70 Annual Utility Benefits $60 Annual NEI Benefits $50 Annual Investment Millions $40 $30 $20 $10 $0 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041

  28. Slide 28: Reserve Margin CBI

    DRAFT Reserve Margin CBI #7: Energy Availability- Reserve Margin 35% Winter Summer Resource Percent Above Peak 30% 25% 20% Load 15% 10% 5% 0% 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 Notes: • Regional Transmission not included in Reserve Mar

  29. Slide 29: Generation Location CBI

    DRAFT Generation Location CBI #8: Generation in WA and/or Connected Transmission System (as a Percent of Generation) 100% 80% 80% 80% 81% 83% 81% 79% Percent of Load 77% 76% 76% 76% 76% 76% 76% 77% 77% 76% 80% 75% 75% 74% 60% 40% 20% 0% 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 203

  30. Slide 30: Washington Air Emissions CBI

    18 Metric Tons Metric Tons 0.00 0.01 0.02 0.03 0.04 0.05 0 1 2 3 4 5 2026 2026 2027 2027 2028 2028 2029 2029 2030 2030 2031 2031 2032 2032 2033 2033 2034 2034 2035 2035 #9c: Mercury 2036 2036 #9a: SO2 2037 2037 2038 2038 2039 2039 2040 2040 2041 2041 2042 2042 2043 2043 2044 2044 2045 2045 Metric To

  31. Slide 31: WA Greenhouse Gas Emissions CBI

    DRAFT WA Greenhouse Gas Emissions CBI #10a: Greenhouse Gas Emissions 1.2 Direct Emissions Net Emissions 1.0 Metric Tons (Millions) 0.8 0.6 0.4 0.2 - 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 #10b: Regional Greenhouse Gas Emissions 12.0 10.3 1

  32. Slide 32: Job Creation (Direct and Induced)

    DRAFT Job Creation (Direct and Induced) Jobs Created From Resource Selection 900 798 800 700 616 600 575 531 Jobs 500 392 412 400 299 314 332 300 241 263 283 216 200 160 188 128 96 62 100 19 39 0 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 Job

  33. Slide 33: Resource Diversity (Resource Resiliency Metrics)

    DRAFT Resource Diversity (Resource Resiliency Metrics) Facility Diversity Fuel Diversity 3,500 3,500 Winter Summer Winter Summer 3,000 3,000 2,500 2,500 HHI Score HHI Score 2,000 2,000 1,500 1,500 1,000 1,000 500 500 - - 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041

  34. Slide 34: Avoided Costs

    Avoided Costs Washington Idaho Clean Clean Flat On-Peak Off-Peak Capacity Capacity Flat On-Peak Off-Peak Capacity Capacity Energy Energy Energy Premium Premium Energy Energy Energy Premium Premium Year ($/MWh) ($/MWh) ($/MWh) ($/kW-Yr) ($/kW-Yr) Year ($/MWh) ($/MWh) ($/MWh) ($/kW-Yr) ($/kW-Yr) 2026

  35. Slide 35: Portfolio Scenarios (includes changes)

    Portfolio Scenarios (includes changes) Methodology Load Scenarios Resource Availability Other Alternative Lowest Reasonable Cost Low Growth Clean Resource Portfolio by 2045 17% PRM (replaces lower WRAP [only used for 2026-2029] PRM scenario) Baseline Least Cost Portfolio High Growth 500 MW Nuclear i