  1. Slide 1: Boonanarring Mineral Sands Project

    1 For personal use only Boonanarring Mineral Sands Project 100%-owned; high-grade; zircon-rich 80km north of Perth in Western Australia On-track for positive cashflow end 1st QTR 2019 RIU Explorers Conference 19-21 February 2019 Fremantle, WA Patrick Mutz Managing Director Image Resources NL ASX: IM

  2. Slide 2: Disclaimer and Forward-Looking Statements

    Disclaimer and Forward-Looking Statements 2 For personal use only This presentation/document has been prepared by the management of Image Resources NL ("Image”, “IMA“, or “the Company”). The information presented includes an indicative outlook of the business activities of Image for the calendar yea

  3. Slide 3: Investor Snapshot

    Investor Snapshot 3 For personal use only Company transitioning to profitable miner and realisation of full valuation  Company fully funded to positive cashflow  Project construction and commissioning complete 30 Nov 2018 • ‘on-budget’ and ‘on-schedule’  Production commenced 1 Dec 2018  First bu

  4. Slide 4: Investor Snapshot

    Investor Snapshot 4 Company transitioning to profitable miner at a time For personal use only of supply shortage of zircon  Binding off-take agreements in place for 100% of HMC production for life of mine  Project NPV A$235 million1; IRR 125%1; 13 month payback1  metrics have strengthened with 12

  5. Slide 5: Products and Applications

    Products and Applications 5 For personal use only Key products are zircon and titanium dioxide  Zircon sand is processed into zirconium compounds, intermediate products and zirconium metal for a variety of applications;  Ceramics (tiles); 55% demand  Foundry Sands (castings); 14%  Refractories (

  6. Slide 6: Products and Applications

    Products and Applications 6 For personal use only Key products are zircon and titanium dioxide  Titanium dioxide (TiO2) from rutile and ilmenite is processed into titanium based products and titanium metal for a variety of applications;  Ultra-white pigments (paint, paper, plastic); ~90% demand 

  7. Slide 7: Project Location

    Project Looking Forward LocationStatement 7 For personal use only  LOCATION  North Perth Basin in Western Australia  80 km north of Perth CBD  Proven mineral sands address  Including majors Iluka and Tronox  Infrastructure rich  paved roads, power, gas pipeline water, telecommunications etc.

  8. Slide 8: Project Types and Locations

    Project Types and Locations 8 For personal use only  1,000 km2 tenements portfolio Atlas Ore Reserves  100% focus on mineral sands Probable: 9.5Mt @ 8.1% HM  Strandline projects (dry mining)  Dredge mining prospects Boonanarring Ore Reserves Multiple opportunities for a second Proved: 9.3 Mt @ 8

  9. Slide 9: Ore Reserves

    Ore Reserves Forward Looking Statement 9 For personal use only  QUALITY ORE RESERVES  JORC Code (2012) Compliant  High HM, VHM and very high zircon at Boonanarring High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) Project/Deposit Category Volume Tonnes % HM % Slim

  10. Slide 10: Products and Prices

    Products and Prices 10 For personal use only Notes: VHM assemblages and commodity prices are estimates based on Boonanarring project heavy mineral concentrate product.

  11. Slide 11: Bankable Feasibility Study Base Assumptions

    Bankable Forward Feasibility Looking Study Statement 11 For personal use only Base Assumptions  Start mining at Boonanarring  Dry, open-cut mining  Production rate - 500 dry tonnes per hour • 3.7M dry tonnes per year  Conventional gravity separation using spirals  Product: Heavy Mineral Concent

  12. Slide 12: Boonanarring – Production Statistics

    Boonanarring – Production Statistics 12 For personal use only Average annual production at Boonanarring (5 yrs)  240k tonnes HMC; containing; • 60kt zircon (70kt/year in 2019-20) • 130kt ilmenite • 6kt rutile • 4kt leucoxene  5.5 years mine life with ability to add 3-4 years additional ore reserve

  13. Slide 13: Boonanarring – BFS Production Statistics

    Boonanarring – BFS Production Statistics 13 Boonanarring Project Production Forecast - updated July 2018 For personal use only 2018 2019 2020 2021 2022 2023 Total Ore processed (Kt) 700 350 3,600 3,800 3,700 3,800 3,500 19,100 Ore grade (%HM) 6% 7% 8% 11% 6% 8% 11% 8% Assemblage (% of HM) 42.7 270.0

  14. Slide 14: Boonanarring – 2019 Guidance

    Boonanarring – 2019 Guidance 14 For personal use only 2019 CY Production and Profitability Guidance1,2 Production Guidance 2020 Forecast Ore processed (million tonnes) 3.4-3.7 3.6-3.8 HMC3 produced (000 tonnes) 220-240 280-300 HMC sold (000 tonnes) 220-240 280-300 Costs (AU$) Project operating costs

  15. Slide 15: Boonanarring – Ramp-up Production

    Boonanarring – Ramp-up Production 15 Operating Statistics – December 2018 January 2019 For personal use only Item Unit Actual Budget Variance Actual Budget Variance FPP/WCP runtime hrs. 639 558 15% 646 632 2% FPP Ore Feed t 232,664 167,400 39% 217,341 205,720 6% FPP Ore Feed tph 364 300 21% 338 325

  16. Slide 16: Zircon Prices – Actual and Forecast

    Zircon Prices Forward Looking– Statement Actual and Forecast 16 For personal use only Current price for Tronox premium grade zircon

  17. Slide 17: BFS Financial Metrics

    BFS Financial Forward LookingMetrics Statement 17 For personal use only Key Financial Metrics Original BFS1 Updated BFS2 Updated BFS3  Pre-Tax NPV (@ 8%) A$135M A$197M A$235M  Pre-Tax IRR 64% 104% 125%  Payback period (months) 22 16 13  Mine life 8+ years  Project capital cost A$52M • includes

  18. Slide 18: Upside Potential

    UpsideLooking Forward Potential Statement 18 For personal use only Upside potential at and near Boonanarring  Confirmed potential to extend mine life with high grade mineralisation (ASX announcement 13 March & 26 June 2017);  Assuming mineralisation in extension area is identical to known Ore Rese

  19. Slide 19: Boonanarring High-Grade Extension

    Boonanarring High-Grade Extension 19 For personal use only ASX - 13 March & 26 June 2017 New Drilling Results (Feb 2017)  Confirm 5.6km northern extension of Boonanarring mineralisation  Outstanding high grade intersections:  8m @ 23.8% HM in IX00245  8m @ 21.1% HM in IX00244 and  8m @ 16.3% HM

  20. Slide 20: Projects Pyramid – Strand Deposits

    Projects PyramidStatement Forward Looking – Strand Deposits 20 Mineral Resources – Accessible by Dry Open-Cut Mining For personal use only Projects ranked by combined Zircon (Zr) plus Rutile (Ru) BFS assumes mining at Boonanarring Tonnes-grades are for Mineral Resources; Boonanarring and Atlas per J

  21. Slide 21: Projects Pyramid – Dredge Prospects

    Projects PyramidStatement Forward Looking – Dredge Prospects 21 Mineral Resources – Accessible by Dredge Mining For personal use only Projects ranked by HM Grade Positive attributes • 90+%VHM; • <5% slimes; Tonnes-grades are for historic Mineral Bidaminna • 25-67% Leucoxene; Resources per JORC Code

  22. Slide 22: Potential Royalty from Tronox

    Potential Royalty from Tronox 22 For personal use only Royalty agreement in place as of 2014  Small cash payment (already received)  Sliding-scale royalty on production Avg. HM Grade Royalty 2.5% 1.25% 3.0% 2.50% 3.5% 3.75% 4.0% 5.00%  Indefinite production schedule  Potential for future arrange

  23. Slide 23: Image Corporate Snapshot

    Image Corporate Snapshot 23 For personal use only Diverse and experienced Board and Management ASX Code: IMA Board of Directors Share Price: A$0.17* Bob Besley – Independent Chairman 12-Month Price Range: A$0.08– 0.18 Patrick Mutz – Managing Director Shares on Issue: 957m Chaodian Chen - Non-Executi

  24. Slide 24: Use of Solar Energy

    Use of Solar Energy 24 For personal use only Heads of Agreement with Sunrise Energy Group Pty Ltd to provide 3-4 MWAC solar farm to be:  Constructed and operated by Sunrise Energy;  Located on Image owned land adjacent to Boonanarring mine site; and  Providing 25% of total electricity requirement