Slide 1: Oyu Tolgoi: world-class asset, development optionality, significant cash flow potential
RBC Global Mining and Materials Conference June 7-8, 2018 Oyu Tolgoi: world-class asset, development optionality, significant cash flow potential
Slide 2: Forward-looking statements
Forward-looking statements 2 This presentation includes certain “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the “safe harbour” provisions of the United States Private Securities Litigation Refor
Slide 3: Turquoise Hill's investment thesis
Turquoise Hill’s investment thesis 3 World-class asset with long-term development optionality Significant free cash flow generation expected from underground Expected benefit from lower copper supply (~2020) and ongoing Jaw crusher – Bin 11 demand growth
Slide 4: Robust long-term production profile
Robust long-term production profile 4 Copper ('000 tonnes) Gold ('000 ounces) Expected copper production growth 2018 – 2025: +340% 669 622 612 Expected gold production growth 2018 – 2025: +150% 583 522 521 475 450 397 369 Source: 2016 Oyu Tolgoi Technical Report 260 256 264 Phase 4A Phase 4A product
Slide 5: Significant cash flow expected
Significant cash flow expected 5 Indicative Oyu Tolgoi Cash Flow $3.00/lb. Copper and $1,300/oz. Gold (Estimated values in billions; see footnotes for assumptions) (Billions) $3.5 $3.0 $2.5 $2.0 From 2014 – 2017, Oyu Tolgoi has generated $1.5 ~$2.1 billion in From 2022 – 2026, operating cash flow $1
Slide 6: Long-term development optionality
Long-term development optionality 6 Resources 120 Case • ~Year 20, concentrator capacity ~120mtpa • NPV8% $8.8 billion1 • Expansion capex ~$14.9 billion3 Resources 100 Case • ~Year 20, concentrator capacity ~100mtpa • NPV8% $8.9 billion1 • Expansion capex ~$13.5 billion3 Resources 50 Case • Assumes
Slide 7: Long-term copper fundamentals strong
Long-term copper fundamentals strong 7 Copper mine supply/demand outlook Small deficit/balanced market Base Primary Demand Avg copper price expected 2018-2019 30 4.50 Forecast 4.00 Ongoing attrition at existing mines driven by declining grade Copper mine supply/demand (millions of tonnes) 25 Ave
Slide 8: Underground development
Underground development Bottom of Shaft 2
Slide 9: Q1'18 underground progress
Q1’18 underground progress 9 Workforce Workforce Composition Lateral Development Over Mongolian nationals Since project restart 6,600 89% 10.3 eq. km workers of workforce completed Development Rates Project Spend Mongolian Spend Imminent completion of Project spend and Almost capital commitments Sha
Slide 10: 2016 Resources Case: ~3.3 billion tonnes
2016 Resources Case: ~3.3 billion tonnes 10 Oyut Open Pit ~860Mt (reserve) 0.44% copper; 0.28 g/t gold Hugo South ~300Mt (resource) Heruga 1.07% copper ~700Mt (resource) 0.06 g/t gold 0.42% copper 0.43 g/t gold; >100Mlb moly Hugo North Lift 1, panels 0,1,2 ~500Mt (reserve) 1.66% copper; 0.35 g/t gol
Slide 11: Underground mining sequence
Underground mining sequence 11 Panel 0 Panel 2 Panel 1 Initial production – three to five draw Five draw bells per month bells per month Four draw bells per month South North Average grade 2.5% cu Initial underground production begins with Panel 0 Highest copper grades occur during ramp up excee
Slide 12: Underground development status
Underground development status 12 10.3 equivalent kilometres completed (January 2016 – Q1’18) Lateral development Highest development month to date in March 2018 Expect ~10.0 kilometres of lateral development in 2018 Shaft 2 Shaft sinking complete in January 2018 (Production and ventilation)
Slide 13: Complete ramp-up expected by 2027
Complete ramp-up expected by 2027 13 Sustainable underground production Complete convey-to-surface Project First draw Complete concentrator Complete re-start bell firing upgrade ramp-up 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Expansion capital Pre-start Sustaining capital Ex
Slide 14: Hugo North Lift 1 production schedule
Hugo North Lift 1 production schedule 14 Figure: 2016 Oyu Tolgoi Technical Report.
Slide 15: CAPEX profile
CAPEX profile 15 Underground capital spend profile1 ($ billion) $1.3 $1.2 $1.2 $1.0 $0.8 $0.8 $0.5 $0.5 $0.4 $0.4 $0.4 $0.3 $0.3 $0.2 2016e 2016a 2017e 2017a 2018e 2019e 2020e 2021e 2022e 2023e 2024e 2025e 2026e 2027e Expansion capital Sustaining capital Expansion capital of $5.3 billion and sustain
Slide 16: Open-pit operations
Open-pit operations
Slide 17: Production highlights
Production highlights 17 All injury frequency rate Concentrator throughput (Per 200,000 hours worked) ('000 tonnes) 0.42 10,838 10,615 10,087 9,637 9,561 0.27 0.27 0.25 0.21 Q1'17 Q2'17 Q3'17 Q4'17 Q1'18 Q1'17 Q2'17 Q3'17 Q4'17 Q1'18 Industry-leading safety performance Q1’18 throughput impacted by s
Slide 18: Financial highlights
Financial highlights 18 Revenue Operating cash costs ($'000,000) ($'000,000) 251.7 217.7 237.5 246.9 245.6 203.7 168.4 176.6 163.6 161.9 Q1'17 Q2'17 Q3'17 Q4'17 Q1'18 Q1'17 Q2'17 Q3'17 Q4'17 Q1'18 Q1’18 revenue reflects higher copper and gold prices Q1’18 operating cash costs impacted by higher open
Slide 19: Production and financial guidance
Production and financial guidance 19 2018 Copper in concentrates 125,000 – 155,000 tonnes Gold in concentrates 240,000 – 280,000 ounces Operating cash costs $700M Capital expenditures $150M (open pit) $1.1B - $1.2B (underground) For 2018, open-pit capital mainly comprised of deferred stripping, eq
Slide 20: Reserves case concentrator performance
Reserves case concentrator performance 20 Annual concentrator throughput (million tonnes) Million Copper grade Gold grade Cu % grade tonnes Au g/t 45 2.00 41.2 39.7 40.0 40.1 40.0 40.0 40 38.2 37.9 37.0 37.1 35.1 34.5 35 1.50 30 27.9 25 1.00 20.3 20 15 0.50 10 5 0 0.00 2013a 2014a 2015a 2016a 2017a
Slide 21: Managing near-term ore grade challenges
Managing near-term ore grade challenges 21 Open-pit plan view Phase 7 Phase 4A higher gold grades in second half of Phase 6 2018 Phase 10 Phase 5 Phase 8 Phase 6 continues to be mined in early 2018 and Phase 4 will be mined throughout the year Phase 4A Phase 4B stripping continues Phase 9 Phas
Slide 22: Oyu Tolgoi – a long-term growth opportunity
Oyu Tolgoi – a long-term growth opportunity 22 Advancing underground development Creating long-term development options Demonstrated productivity and cost improvements Best copper asset in development
Slide 23: Appendix
Appendix
Slide 24: Helping expand the Mongolian economy
Helping expand the Mongolian economy 24 Mongolian Workforce Taxes and Fees In-country Spend >14,000 ~$1.8B ~$7.5B At the end of Q1’18, the 2010 – Q1’18, Oyu Tolgoi Between 2010 and Q1’18, Oyu Tolgoi’s workforce had paid ~ $1.8 billion in Oyu Tolgoi has spent was 14,000+ strong and taxes and royaltie
Slide 25: Reserves Case cash-flow model
Reserves Case cash-flow model 25 Cash Flow Statement (US$M) Year Total Year Number 1 2 3 4 5 6 7 8 9 10 11 21 31 Year To 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 20 30 40 Gross Revenue 954 923 1,189 1,402 1,735 1,993 3,380 4,434 4,879 4,622 35,422 13,698 8,175 82,806 Realization Costs 263 2
Slide 26: Increasing copper demand from electric vehicles
Increasing copper demand from electric vehicles 26 Vehicle Type Contained copper From 2017 to 2025 Conventional car 18 – 49 lbs. copper Copper demand from electric Hybrid electric vehicles 85 lbs. copper vehicles is expected to grow Plug-in hybrid electric 132 lbs. copper roughly six times from ~0
Slide 27: Block cave concept
Block cave concept 27 Gravity used to exploit deep ore body Block caving Cave propagation (caveability) depends on in situ stresses and host rock’s ability to fracture Initial drill, blast and extraction focused on bottom section of ore body via drawpoint to create void Broken ore removal fr
Slide 28: Oyu Tolgoi at China's doorstep
Oyu Tolgoi at China’s doorstep 28
Slide 29: Project finance flow of funds
Project finance flow of funds 29 Shareholder loan At project finance drawdown Payable to Turquoise Hill* Receivable from Oyu Tolgoi* Proceeds: $4.3 billion2 $4.3 billion3 $4.2 billion Shareholder loan Q1’16: $7.0 billion Shareholder loan Q1’18: $4.1 billion Payable to Turquoise Hill* Receivable from
Slide 30: Committed to sustainability
Committed to sustainability 30 Strong safety performance Significant water conservation results – regularly exceed recycling target Robust biodiversity program Comprehensive climate change strategy Landmark Cooperation Agreement in 2015 with local communities Environmental and social imp
Slide 31: This page intentionally left blank
31 This page intentionally left blank
Slide 32: turquoisehill.com
turquoisehill.com Turquoise Hill Resources Ltd. Suite 354 - 200 Granville Street Vancouver, BC, Canada V6C 1S4 TRQ: TSX, NYSE & NASDAQ Turquoise Hill is an international mining company focused on the operation and development of the Oyu Tolgoi copper-gold mine in southern Mongolia.