Slide 3: March Quarter - Key Points
March Quarter - Key Points Group gold production of 47,509oz at total cash cost of For personal use only • US$1,051/oz. • Chatree in line with December quarter and Challenger is transitioning from capital development to mining of stopes. • Reviews of project expenditure and operating plans are under
Slide 4: Chatree
Chatree For personal use only 1,600Kt @ 0.87g/t for 30,609oz. Operational Plants operating at a steady 6.4Mtpa Performance Recovery to improve with access to main orebody at A and Q oxide ore. Total cash costs US$923/oz (incl. US$149/oz royalty). Total Cash Costs Higher maintenance costs,
Slide 5: High Grade Intercepts at A Pit
High Grade Intercepts at A Pit For personal use only Visual representation of the total gold accumulation at Chatree from the resource modelling (gram metres)
Slide 6: Challenger
Challenger For personal use only 136Kt @ 4.02g/t for 16,900oz Low equipment availability and Production hauling waste to surface. Operating bias moving back towards mining stopes from u/g development. Total cash costs US$1,278/oz (incl. US$59/oz royalty). Total cash Costs Costs reflect the
Slide 7: Nueva Esperanza
Nueva Esperanza For personal use only A staged project with an initial heap leach based on Chimberos ore with Feasibility Study conventional leaching 3 to 4 yrs later. Resource upgrade drilling occurring at Chimberos. Column leach testing underway in Metallurgical laboratory and on-site. Testw
Slide 8: Nueva Esperanza
For personal use only Nueva Esperanza
Slide 9: Bowdens
Bowdens For personal use only Feasibility study moving towards Feasibility Study completion in July. Geotech and sterilisation drilling re- commenced to support mine Fieldwork planning and pit optimisation. Baseline environmental monitoring continues. Focus meeting completed on-site Environm
Slide 10: Outlook
Outlook For personal use only • Group gold production for the June quarter will be highest quarterly production for the year. • Capital expenditure and operating plans under review given the volatility in gold and silver prices. • Subject to any initiatives from the operational asset review, group g
Slide 11: Kingsgate Consolidated Limited
Kingsgate Consolidated Limited For personal use only Shares: 152 Million Market Cap: ~A$400 Million ASX: KCN www.kingsgate.com.au
Slide 12: Appendix - General Disclaimer
Appendix General Disclaimer: For personal use only The information contained in this presentation is for informational purposes only and does not constitute an offer to issue, or arrange to issue securities or other financial products. The information contained in this presentation is not investment
Slide 13: Chatree
Chatree For personal use only Chatree Ore Reserves as at 30 June 2012 (>0.3g/t gold cut-off grade) Gold Silver Gold Silver Grade Tonnes Grade Contained Contained AuEq Source Category (millions) (g/t) (g/t) (Moz) (Moz) (Moz) From Pits Proven 46.2 0.79 7.9 1.17 11.7 1.30 Probable 16.7 0.72 5.9 0.39 3.
Slide 14: Challenger
Challenger Challenger Ore Reserves as at 30 June 2012 For personal use only Tonnes Gold Gold Source Category Grade Contained (million) (g/t) (‘000 oz) From Mine Proven 0.64 4.32 90 Probable 2.61 6.61 550 Challenger Total Total 3.25 6.16 640 Challenger Mineral Resources as at 30 June 2012 Tonnes Gold
Slide 15: Nueva Esperanza
Nueva Esperanza For personal use only Nueva Esperanza Mineral Resources as at 30 June 2012 (0.5g/t AuEq cut-off grade) Gold Silver Gold Silver AgEq AuEq Tonnes Grade Grade Contained Contained Contained Contained Category (millions) (g/t) (g/t) (Moz) (Moz) (Moz) (Moz) Measured 1.8 0.01 90 0.00 5.1 5.
Slide 16: Bowdens
Bowdens Bowdens Mineral Resources as at 19 November 2012 For personal use only (30g/t AgEq cut-off grade) Grade Contained Metal Category Tonnes Silver Lead Zinc AgEq Silver AgEq AuEq (million) g/t % % g/t (Moz) (Moz) (Moz) Measured 23.6 56.6 0.31 0.41 74.5 43.0 57 1.25 Indicated 28.4 48.0 0.27 0.36