  1. Slide 1: Building an international mining company

    Building an international mining company May, 2007 (all figures in US dollars where applicable, except where indicated) A copy of this presentation can be downloaded at www.first-quantum.com Disclaimer Some of the statements contained in the following material are forward-looking statements and not

  2. Slide 2: Share Structure

    Share Structure Listed Toronto Stock Exchange Symbol “FM” (member of S&P/TSX 60 index) Listed London Stock Exchange (main board) Symbol “FQM” Issued 67.3 million Fully diluted 69.1 million 52 week range C $36.93 - $90.24 Avg. volume (daily) 600,000 Recent Share Price (5/14/07) C $89.00 Market Capita

  3. Slide 3: Overview and Financial Snapshot

    Overview Growth Pipeline Advanced Development / Exploration Exploration Construction Operating Kolwezi Kashime – 100% Frontier – 95% Kansanshi - 80% Village Kibamba – 100% Kolwezi – 65% Bwana/Lonshi – 100% Mwati Guelb Moghrein – 80% Mokambo Mufulira – 16.9% Exxaro JV Nkana – 16.9% Shabunda 5/15/2007

  4. Slide 4: 2006 Snapshot and 2007 1Q Snapshot

    2006 Snapshot 183,277 tonnes of copper production Sold 172,487 tonnes of copper, stockpile of 15,000 tonnes Cash costs (C1) of $0.87 per pound Cash flow of $588 million or $9.04 per share (before non-cash working capital changes) Earnings of $414 million or $6.37 per share Cash of $265 million Worki

  5. Slide 5: Zambia & DRC Copperbelt

    Zambia & DRC Copperbelt 5/15/2007 Slide 9 Bwana\Lonshi 5/15/2007 Slide 10

  6. Slide 6: Bwana/Lonshi

    Bwana/Lonshi Highlights Lonshi oxide reserve (12/05) – 730,000 tonnes @ 8.3% Cu (60,590, tonnes of copper) 35,000 tonnes of copper per year Cash costs estimated at $0.75/ lb - $0.80/lb Mine reserve will be depleted in mid - 2008 5/15/2007 Slide 11 Lonshi Mine (September, 2006) 5/15/2007 Slide 12

  7. Slide 7: Bwana Mkubwa SX/EW Plant

    Bwana Mkubwa SX/EW Plant 5/15/2007 Slide 13 Bwana Mkubwa – The future HPL facility at Bwana - Lonshi sulphide Oxide Sources - Frontier oxide - Kashime oxide - Lonshi dolomitic ore - External ore - Combination of the above 5/15/2007 Slide 14

  8. Slide 8: Kansanshi Mine

    Kansanshi Mine 5/15/2007 Slide 15 Kansanshi Mine 5/15/2007 Slide 16

  9. Slide 9: Kansanshi Mine Highlights

    Kansanshi Mine Highlights: Commercial production began in April, 2005 Mine life 30+ years Approximate Annual Copper Production - 127,179 tonnes in 2006 - 145,000 tonnes in 2007 - 165,000 tonnes in thereafter Forecast cash costs of $0.90-$0.95 for balance of 5 year plan 5/15/2007 Slide 17 Kansanshi M

  10. Slide 10: Kansanshi Mine – HPL Facility

    Kansanshi Mine – HPL Facility 5/15/2007 Slide 19 Kansanshi Mine – HPL Facility Benefits: Reduce reliance on Copperbelt smelter capacity Generation of acid for leaching Elevated temperature leaching and ferric sulfate improve recoveries for mixed ores Avoid TC/RC’s and freight parity Not a new techno

  11. Slide 11: HPL Facility Update and Guelb Moghrein Mine

    Kansanshi Mine – HPL Facility Update: Commissioning of #1 autoclave began in March Operating at design throughput of 52,500T concentrate/year Initial results: - 91% sulphur conversion - 97% copper recovery Commissioning of #2 autoclave will begin shortly 5/15/2007 Slide 21 Guelb Moghrein Mine 5/15/2

  12. Slide 12: Guelb Moghrein Mine

    Guelb Moghrein Mine Highlights: *Resource (12/03) – 23.7 million tonnes @ 1.88% Cu; 1.41 g/t Au (446,000 tonnes of copper and 1 million ounces of gold) Open pit accessible sulphide ore body Process plan: mill + float + CIL= copper/gold concentrate + dore Annual Target: 30,000 tonnes of copper & 65,0

  13. Slide 13: Guelb Moghrein Mine

    Guelb Moghrein Mine 5/15/2007 Slide 25 Guelb Moghrein Mine 5/15/2007 Slide 26

  14. Slide 14: Frontier Project

    Frontier Project 5/15/2007 Slide 27 Frontier Project 5/15/2007 Slide 28

  15. Slide 15: Frontier Project Overview and Engineering Study

    Frontier Project Overview: Measured & Indicated Sulphide Resource (12/06) 182 million tonnes @ 1.16% copper (2.1 million tonnes of copper) Deposit remains open Process plan: mill + floatation = copper in concentrate Construction underway Commercial production targeted for 3Q 2007 5/15/2007 Slide 29

  16. Slide 16: Frontier Project Economic Highlights

    Frontier Project Economic Highlights Copper Price ($/lb) 1.50 2.00 2.50 3.00 Pre-tax IRR (%) 24 58 92 124 Pre-tax NPV (10%) ($M) 213 739 1,299 1,858 Pre-tax NPV (12%) ($M) 156 605 1,083 1,561 Net cash flow ($M) 957 2,365 3,862 5,360 (after capital & before tax) Payback period (years) 3.6 1.5 <0.4 <0

  17. Slide 17: Frontier Deposit (April, 2007)

    Frontier Deposit (April, 2007) 5/15/2007 Slide 33 Frontier Deposit (April, 2007) 5/15/2007 Slide 34

  18. Slide 18: Frontier Deposit (April, 2007)

    Frontier Deposit (April, 2007) 5/15/2007 Slide 35 Frontier Deposit (April, 2007) 5/15/2007 Slide 36

  19. Slide 19: Kolwezi Tailings Project

    Kolwezi Tailings Project 5/15/2007 Slide 37 Kolwezi Tailings Project 5/15/2007 Slide 38

  20. Slide 20: Kolwezi Tailings Project Ownership and Highlights

    Kolwezi Tailings Project Ownership Structure: First Quantum Minerals Ltd. 65.0% Gécamines (carried) 12.5% IDC* (participating) 10.0% IFC** (participating) 7.5% Government of the DRC (carried) 5.0% *International Development Corporation of South Africa **International Finance Corporation 5/15/2007 Sl

  21. Slide 21: Exploration

    Kolwezi Tailings Project 5/15/2007 Slide 41 Exploration 5/15/2007 Slide 42

  22. Slide 22: Exploration – Copperbelt Portfolio

    Exploration What are we looking for? 5/15/2007 Slide 43 Exploration – Copperbelt Portfolio 5/15/2007 Slide 44

  23. Slide 23: Kibamba and Kashime Prospects

    Kibamba Prospect, DRC Highlights Discovered during 2005 exploration season 10 kilometre long structural zone Initial drill program results: - RSF01 - 80 metres grading 2.02% Cu & 0.25% Co - RSF13 - 75 metres grading 1.12% Cu & 0.03% Co - RSF16 - 82 metres grading 1.88% Cu & 0.12% Co 5/15/2007 Slide

  24. Slide 24: Outlook: 2007 Objectives

    Outlook 5/15/2007 Slide 47 2007 Objectives Bring HPL to commercial production Finish construction / begin commercial production at Frontier Fine tune Guelb Moghrein production Complete sulphide expansion at Kansanshi Secure future ore feed for Bwana Finalize engineering at Kolwezi and begin construc

  25. Slide 25: Development Projects and Potential Copper Production Profile

    Development Projects 2006 2007 2008 2009 2010 Frontier Kansanshi (expansion) Kolwezi* Kolwezi* (expansion) = Financing & feasibility = Construction (subject to positive feasibility and project finance) = Commercial production * Subject to final board approval 5/15/2007 Slide 49 Potential Copper Prod

  26. Slide 26: Challenges and EPS & CFPS Estimates

    Challenges Scarcity of human capital Strained infrastructure Long lead delivery for capital items Inflation Commodity price variations Local political issues and impacts 5/15/2007 Slide 51 EPS & CFPS Estimates First Call Consensus Earnings & Cash Flow Estimates (US$) EPS CFPS* 2007 $8.18 $10.64 2008

  27. Slide 27: Investment Highlights

    Investment Highlights Pure Copper Play Earnings and cash flow highly leveraged to copper Unmatched Growth Profile Copper production to grow from 40K tonnes in 2004 to +300K tonnes in 2008 Blue Sky On going exploration may lead to new mines 5/15/2007 Slide 53 Building an international mining company