  1. Slide 1: A Rapidly Growing Metals & Mining Company

    A Rapidly Growing Metals & Mining Company www.first-quantum.com TSX: FM LSE: FQM LuSE: FQMZ February 2012 1

  2. Slide 2: Cautionary Note Concerning Forward-Looking Statements

    Cautionary Note Concerning Forward-Looking Statements Some of the statements contained in the following material are forward looking statements and not statement of facts. Such statements are based on the current beliefs of management, as well as assumptions based on management information currently

  3. Slide 3: What Do Our Shareholders Own?

    First Quantum What Do Our Shareholders Own? • A substantial copper producer with a pipeline of expansions and new projects • An emerging nickel producer with growth opportunities • A strong balance sheet • Production in an industry with strong fundamentals • Most importantly, the ability to add valu

  4. Slide 4: What We Have Delivered So Far

    What We Have Delivered So Far Copper Growth (1) Total Annualised Shareholder Return (2) 2000-2011 CAGR (%) January 2000 – December 2011 (%) Barrick 34% First Quantum 32% Inmet 24% Southern Copper 23% Southern Peru 22% First Quantum 22% Antofagasta 21% Xstrata 20% Norilsk 15% Teck 18% Vale 12% BHP Bi

  5. Slide 5: Long-Term Targets

    Long-Term Targets 1000 Copper Production 125 Nickel Production 000’s tonnes 000’s tonnes 800 100 600 75 400 50 200 25 0 0 04 06 08 10 12F 14F 16F 18F 04 06 08 10 12F 14F 16F 18F Base Projects Base Projects Optional 5

  6. Slide 6: What We Are Looking to Deliver: Copper Growth Remains Best in Class

    What We Are Looking to Deliver: Copper Growth Remains Best in Class 2016 Copper Producer Landscape Copper Growth (Mt) 6th Largest Global 13th Largest Global 2011 – 2016 CAGR (%) Copper Producer Copper Producer FQM 29.2% by 2016 Currently Vale S Copper Xstrata Glencore Rio Tinto Kazakhmys 1.0 Barrick

  7. Slide 7: Tripling Copper Production Capacity

    Tripling Copper Production Capacity

  8. Slide 8: Kansanshi Copper-Gold Mine

    Kansanshi Copper-Gold Mine • Located near Solwezi in the North Western Province of Zambia • First production in 2005 • Open pit mining • Flexible ore treatment to allow for variation in ore type – Sulphide circuit – Oxide circuit – Gold facility • On-going program of resource development and explora

  9. Slide 9: Kansanshi Mining Volumes & Strip Ratio

    Kansanshi Mining Volumes & Strip Ratio 9

  10. Slide 10: Kansanshi Sulphuric Acid Supply

    Kansanshi Sulphuric Acid Supply 10

  11. Slide 11: Kansanshi Improving Ore Availability

    Kansanshi Improving Ore Availability 11

  12. Slide 12: Kansanshi Multi-Phase Expansion

    Kansanshi Multi-Phase Expansion Expansion Estimate Project Capacity Completion Cost Production Impact ($ millions) Acid Plant 5 1000t/day 2012 18 Oxide 7.2 mtpa 2012 31 Copper: 10,000 - 15,000 tpa Oxide 12 mtpa 2013 - 2014 200 Copper: 60,000 - 75,000 tpa Smelter 1.2 mtpa 2014 635 Smelter Acid - 900,

  13. Slide 13: Kansanshi Copper Smelter Project Parameters

    Kansanshi Copper Smelter Project Parameters • Concentrate feed rate 1.2 Mtpa —67% Sentinel —33% Kansanshi —Average copper grade 26% • Blister copper production 300,000 tpa • Acid production 1.0 Mtpa 13

  14. Slide 14: Kansanshi Copper Smelter Project Key Estimates

    Kansanshi Copper Smelter Project Key Estimates • Capital cost of US$635M • Commissioning from mid 2014 • Operating cost US$69/t of concentrate 14

  15. Slide 15: Economic Benefits of the Copper Smelter

    Economic Benefits of the Copper Smelter Transport Kansanshi 100% to Zambian Smelters Sentinel 900,00 – 1,200,000 to export less 300,000 t Blister Cost per annum @ $220/t: $130M to $ 200M Export Levy Current 10% of export value Sentinel Annual export 230,000 – 310,000 copper in concentrate Cost per a

  16. Slide 16: Guelb Moghrein Copper-Gold Mine

    Guelb Moghrein Copper-Gold Mine • 100% ownership • Located 250 kilometres northeast of the nation’s capital, Nouakchott • As at December 31, 2011, the estimated minelife was approximately 10 years (including stockpiles) • First production in 2006 • Workforce of ~1,200 16

  17. Slide 17: Guelb Moghrein Copper-Gold Mine

    Guelb Moghrein Copper-Gold Mine • 2011 production challenged with plant utilization issues but tonnage increases evident at year end • Mining side performed positively • 2012 focus on improved throughput and recoveries to increase copper production 17

  18. Slide 18: Guelb Moghrein - Outlook

    Guelb Moghrein - Outlook • Feed tonnage rising during operating Average tonnes per hours with improved grinding and operating hour HPGR operation 500 450 • Additional mill and further 400 modifications to existing circuits 350 expected to achieve desired tonnage 300 targets. 250 200 • Improvements t

  19. Slide 19: Ravensthorpe Nickel Operation: Months from Purchase to Production

    Ravensthorpe Nickel Operation 20 Months from Purchase to Production • Purchased in February 2010 for US$340M • Design phase – February – December 2010 • Modifications – July 2010 – September 2011 • Commissioning – June – December 2011 • First product – 4 October 2011 • First exports – 25 November 20

  20. Slide 20: Ravensthorpe Making it Work

    Ravensthorpe Making it Work • Front-end materials handling • Dewatering • Buffer storage capacity • Refurbish existing plant • Tailings Storage Facility 20

  21. Slide 21: Ravensthorpe Operational Achievements

    Ravensthorpe Operational Achievements • Crushing: – SAP and LIM achieved design of 2000 tph • Beneficiation: – SAP – 550 tph vs design of 455 tph – LIM – 1200 tph vs design of 1177 tph • Atmospheric Leach: – 180 tph vs design of 135 tph • PAL Trains: – 150 tph vs design of 150 tph • MHP Loadout: – 1

  22. Slide 22: Ravensthorpe Going Forward

    Ravensthorpe Going Forward  Target operations:  39 ktpa for the first five years; 28 ktpa over the life of mine; C1 cost of ~$7.00 per lb (1) • Expected mine life >30 years • Three ore bodies: Halleys, Hale-Bopp, Shoemaker-Levy • 480 staff (1) At current sulphur prices 22

  23. Slide 23: Kevitsa Nickel-Copper-PGE Project

    Kevitsa Nickel-Copper-PGE Project • 100% owned; Acquired in 2008 • Large undeveloped sulphide nickel deposit suitable for open cast mining • 240M tonnes @ 0.30% Ni (0.28 NiSulphide) and 0.41% Cu • Initial ore feed of 5.5 mt/yr with intention to expand by ~50% in 2013 • On-going drill program continu

  24. Slide 24: Kevitsa Nickel-Copper-PGE Project

    Kevitsa Nickel-Copper-PGE Project • First product expected in May, sales in July, 2012 • Target operations:  10 ktpa nickel @ ~$6.70 / lb  20 ktpa copper @ ~$1.10 / lb • Workforce primarily from Lapland; FQM technical staff in key areas • Preliminary mining, process and engineering staff establish

  25. Slide 25: Sentinel Copper Project

    Sentinel Copper Project • Located ~ 140 km northwest of Solwezi, Northern Zambia • Resource update being finalized • EIA and land use agreement obtained • Estimates: – Production to start at 150 ktpa copper concentrate initially, rising up to 300 ktpa – Strip ratio 2:1 – Mine life over 20 years – C1

  26. Slide 26: Sentinel Copper Project

    Sentinel Copper Project Project Total Nominal Nominal Cost 20Mtpa Plant 40Mtpa Plant Mining 299 495 Treatment 393 645 Plant Infrastructure 217 335 Indirects 169 250 Total 1,078 1,725 26

  27. Slide 27: Sentinel Copper Project Project Status

    Sentinel Copper Project Project Status • Committed deliveries for mills, gearless mill drives, crushers and mining fleet • Flowsheets completed • Concept layouts and detailed estimates complete • Equipment list complete • 300-man construction camp complete 27

  28. Slide 28: Sentinel Copper Project Project Status

    Sentinel Copper Project Project Status • Power scope defined and commercial discussions are continuing • Mine planning commenced • Internal reviews undertaken • Site access complete • Pending Board approval 28

  29. Slide 29: Enterprise Nickel Project

    Enterprise Nickel Project • Located 12 km northwest of Sentinel • High grade sulphide nickel – open pit potential • Potential to produce 40 - 70 ktpa of Ni vaesite nickeloan pyrite 29

  30. Slide 30: Enterprise Nickel Project

    Enterprise Nickel Project • Current focus – continue to define resource, design the mine and confirm process route • Campaign treatment at the Sentinel facilities significantly reduces capital – utilization of re-grind mills and cleaner circuits • Open pit mining – potential one-off pre-strip utiliz

  31. Slide 31: Haquira Copper Project

    Haquira Copper Project • Acquired in December 2010 • Large scale copper project located in southern Peru  M&I resource of 3.7 Mt of copper equivalent and an inferred resource of 2.4 Mt of copper equivalent • Currently focused on:  Community relations and land access  Expanding infill and condemna

  32. Slide 32: Long-term Copper Dynamics

    Long-term Copper Dynamics 15

  33. Slide 33: Copper Price Estimates Over Time

    Copper Price Estimates Over Time 4.50 Copper Price (US$ / lb Cu) 2009 4.00 2011 3.50 2010 3.00 Actual 2008 2.50 2011 2.00 2007 Long Term 2010 LT 2009 LT 1.50 2008 LT 2004 2006 2007 LT 1.00 2002 2003 2005 2006 LT 2001 2002 LT 2004 LT 2000 2001 LT 2003 LT 2005z LT 0.50 2000 LT 0.00 Long Term Price Est

  34. Slide 34: Surpluses Overestimated & Deficits Underestimated

    Surpluses Overestimated & Deficits Underestimated Brook Hunt Supply / Demand – Forecast vs. Actual Supply / Demand Surplus (Deficit) (ktpa) Copper Demand (ktpa) 1,500 19,000 1,137 960 1,000 737 648 18,000 500 424 295 236 0 78 0 17,000 (77) (134) (135) (293) (334) (500) (422) 16,000 (1,000) (1,080) (

  35. Slide 35: Copper Grades Have Declined Significantly

    Copper Grades Have Declined Significantly Grades of Global Copper Mined % Cu 1.60 1.40 Lack of sizeable, high quality production coming on-stream… 1.20 Initial production of Grasberg 1.00 and Escondida 0.80 0.60 1980 1985 1990 1995 2000 2005 2010 2015 2020 2025 Source: Brook Hunt. Broker Research 35

  36. Slide 36: Emerging Markets – Substantial Growth Ahead

    Emerging Markets – Substantial Growth Ahead GDP per Capita US$ 35,000 USA 30,000 25,000 UK 20,000 15,000 10,000 Brazil 5,000 China Russia 0 1835 1855 1875 1895 1915 1935 1955 1975 1995 Source: Maddison 36

  37. Slide 37: Projected Impact on the Copper Market

    Projected Impact on the Copper Market Key Points Intensity of Refined Copper Consumption (1) Multiple of India, Brazil, China kg Cu per capita 7.1x  Should China, India and Brazil all 25 Average Intensity of Use (x) grow in line with population Aggregate Copper Use 6.1x 21.50 forecasts and reach co

  38. Slide 38: Projects Less Sensitive to Copper Prices

    Projects Less Sensitive to Copper Prices Top 25 Copper Projects Capex Intensity (US$ / t) Minimum Required Copper Price to Generate 15% IRR (US$ / tonne Cu) Cobre Panama (Inmet) $ 21,622 Caracoles (Antofagasta) $ 20,421 Caserones (JX Nippon) $ 20,045 Sierra Gorda (Quadra FNX) $ 19,895 El Moro (GoldC

  39. Slide 39: Agreement to Dispose of DRC Assets

    Agreement to Dispose of DRC Assets • Agreement with ENRC to dispose of all residual claims and assets • Total consideration of $1.25B – consisting of: – $750M payable on closing – $500M three-year promissory note with a 3% interest coupon • Condition of closing – FQM, ENRC and DRC government will se

  40. Slide 40: A Rapidly Growing Mining & Metals Company

    A Rapidly Growing Mining & Metals Company • Unique core technical strength behind the strong track record of value creation • Existing operations provide a solid platform to support growth • Strong financial position and cash flow • ~$5 billion investment in growth over 2012 – 2016 to significantly

  41. Slide 41: A Rapidly Growing Metals & Mining Company

    A Rapidly Growing Metals & Mining Company www.first-quantum.com TSX: FM LSE: FQM LuSE: FQMZ February 2012 1

  42. Slide 42: Corporate Profile

    Corporate Profile Stock exchange listings & symbols – (S&P/TSX 60 Index) TSX: FM LSE: FQM LuSE: FQMZ Shares issued and outstanding 476.3 million Fully diluted 476.3 million 52-week share price range C$29.60 – C$12.60 Recent share price – February 17, 2012 C$22.24 Market capitalization – $ millions C

First Quantum Minerals — Investor Presentation (February 2012) on 6ix