Mandalay Resources Corp

Mandalay Resources — Investor Presentation (April 2013)

36 slides from Mandalay Resources's investor presentation, April 2013

  1. Slide 1: Delivering Growth // Discovering Value

    TSX: MND www.mandalayresources.com DELIVERING GROWTH // DISCOVERING VALUE April 2013

  2. Slide 2: Forward-looking Statements; Quality Control and Assurance

    Forward-looking Statements This presentation contains "forward-looking statements" within the meaning of applicable securities laws, including statements relating to life of mine production plans and exploration plans and the growth and strategy of Mandalay. Readers are cautioned not to place undue

  3. Slide 3: Vision

    Vision To create exceptional shareholder value through the acquisition of undervalued assets that can rapidly become cash generative, self fund exploration, establish and maintain high operating margins and return cash to shareholders within a planned period of time. Mandalay is committed to operati

  4. Slide 4: Locations and Tradeflows

    Locations and Tradeflows La Major Customers SS Mine X Exploration Project Costerfield Mine, Australia Gold - Antimony 2 i Cerro Bayo Mine, Chile Silver - Gold Costerfield 2013E Production Cerro Bayo 2013E Production Estimates 2,800,000 - 3,100,000

  5. Slide 5: Management and Board of Directors

    Management and Board of Directors Senior Management Brad Mills, CEO and Sanjay Swarup, CFO Mark Sander, President Dominic Duffy, COO Belinda Labatte, Executive Director and Executive Director 28 years of experience in Mining Engineer with Corporate Secretary Former CEO Lonmin Former Lonmin plc, over

  6. Slide 6: Strategy: Rapid Value Generation and Returns

    Strategy: Rapid Value Generation and Returns Entry Strategy: Focus and Results  Acquire high-quality assets at a low cost relative to ultimate value  Apply management’s extensive operational and exploration expertise to turn around, grow and/or develop the assets  Focus on cash returns to shareho

  7. Slide 7: Capital Structure and Ownership

    Capital Structure and Ownership Millions (Except Capital Structure as at March 6, 2013 Share Price Information) Share price (Last close) (CAD$) 1.09/shr Shares Outstanding 325.3 Options(1) 12.9 Warrants(2) 21.0 Fully Diluted Shares Outstanding 359.2 Post-recap: 181 Market Capitalization (CAD$) 354.6

  8. Slide 8: Management Track Record: Execution, Value Creation

    Management Track Record: Execution, Value Creation Mandalay: Q4 2009 - New Management Team 289% (Mills, Sander, Swarup) Silver: 103% Gold: 65% Peers: 57% Company History and Milestones 2009 Q4 2010 2011 2012 Financial/ Acquired Costerfield gold- Listed on TSX main board from Announced Normal Course

  9. Slide 9: Cerro Bayo Silver-Gold Mine

    Cerro Bayo Silver-Gold Mine Land package 23,096 hectares Ownership 100% 2012 silver production 2,911,595 oz 2012 gold production 17,089 oz 2013E silver production 2.8 – 3.1 million oz 2013E gold production 18,000 – 21,000 oz Current throughput approx. 1,200 tpd P&P Reserves 2.3 Mt @ 241 g/t Ag; 2.2

  10. Slide 10: Cerro Bayo District: Target-rich Land Package

    Cerro Bayo District: Target-rich Land Package Brillantes Brillantes Esperanza NI43-101 Reserve-Resource veins  2012 Infill and Step-Out Drilling 2012 New infill from 2011 Blue Sky successes Laguna Verde 2012 Scheduled Blue Sky drill targets 2012- Field work to prep for 2013 drilling Coigues Sb Anom

  11. Slide 11: Cerro Bayo: Laguna Verde Area

    Cerro Bayo: Laguna Verde Area DALILA Trinidad DAGNY FABIOLA YASNA COYITA Mill Gabriela Tailings DELIA NW BIANCA Coigues LAGUNA VERDE DAGNY UNDER LAKE DELIA SE. Producing Mine or Planned mine (Vein Outcrop) 2012 Infill/Extensional Drilling Exploration Vein 11

  12. Slide 12: Fabiola Vein: Example of Subtle Surface Expression and Reserve Growth

    Fabiola Vein: Example of Subtle Surface Expression and Reserve Growth 2010 Surface 2011 30 m below in Mine, Approximately 1 m 12

  13. Slide 13: Cerro Bayo Operating Performance

    Cerro Bayo Operating Performance 13

  14. Slide 14: Costerfield Gold-Antimony Mine: Overview

    Costerfield Gold-Antimony Mine: Overview Land package 1,293 hectares Ownership 100% 2012 gold production 18,036 oz 2012 antimony production 2,481 t 2013E gold production 18,000 – 21,000 oz 2013E antimony production 2,800 – 3,000 t Current throughput 340 tpd P&P Reserves 178,000 tonnes @ 8.9 g/t Au;

  15. Slide 15: Augusta Mine & Cuffley Exploration Breakthrough

    Augusta Mine & Cuffley Exploration Breakthrough  Drilling and development shows possible shoot at southern N-lode in Augusta, open to north and at depth  NI 43-101 Indicated Resource at Cuffley of 79 kt @ 20.8 g/t Au, 6.4% Sb  NI 43-101 Inferred Resource at Cuffley of 300 kt @ 10 g/t Au, Cuffley

  16. Slide 16: Costerfield Operating Performance

    Costerfield Operating Performance 16

  17. Slide 17: Fundamental Source of Improvements

    Fundamental Source of Improvements Improved mine staff, technical work and planning discipline New mobile fleet 5 metre stopes moving to 10 metre stopes 17

  18. Slide 18: La Quebrada Copper-Silver Project: Overview

    La Quebrada Copper-Silver Project: Overview Land package 7,418 hectares Ownership 100% Location 45 km NW of La Serena Mineralization Cu-Ag mantos Elevation 1,000 – 1,500 metres ASL M&I Resource 34.8 Mt @ 10 g/t Ag, 0.6% Cu 18

  19. Slide 19: La Quebrada

    La Quebrada La Quebrada Total Resources(1) Rock (t) Ag Grade (g/t) Ag (cont. oz) Cu Grade (%) Cu (cont. lb) Measured 0 0 0 0 0 Indicated 34,800,000 10 11,188,272 0.6% 459,360,000 Measured & Indicated 34,800,000 10 11,188,272 0.6% 459,360,000 Inferred 1,000,000 11 353,652 0.6% 13,200,000 Next steps:

  20. Slide 20: Discovery-fuelled Organic Growth

    Discovery-fuelled Organic Growth Significant M&I Resource Growth (1,2,3) Costerfield Budget and Production (2013E) Cerro Bayo Budget and Production (2013E) 1 Source: Roscoe Postle Associates, March 2013, documented in an independent NI 43-101 report filed March 28, 2013 Source for Dalila vein: Inter

  21. Slide 21: Peer Comparison

    Peer Comparison 2012 Production 2012 Financials Ag Au Other Ag Eq. Revenue EBITDA EBITDA Margin (oz) (oz) (Au + Ag) (oz) (US$MM) (US$MM) (%) Mandalay Resources 2,911,595 35,125 2,481 t Sb 4,828,166 171.8 79.9 46.5 Endeavour Silver* 4,485,426 38,687 6,595,355 206.1 89.2 43.3 Silver Standard 8,350,000

  22. Slide 22: Mandalay Compares Favourably to its Peers

    Mandalay Compares Favourably to its Peers  Highest grade reserves (Ag Eq oz)  Highest EBITDA margin  Lowest fully loaded cost (Ag Eq oz)  Second lowest market cap per estimated annual production of Ag eq. oz  Lowest total enterprise value/EBITDA multiple  Third lowest market cap/P+P reserves o

  23. Slide 23: Highlights and Catalysts

    Highlights and Catalysts Cerro Bayo  Current ramp up to 1,200 tpd is complete; ramp up to 1,400 tpd expected for Q1 2014  7 rigs drilled through 2012 – Resource and Reserve updated in Q1 2013  6 rigs drilling on 12 major district exploration areas in 2013  Flotation automation project to improve

  24. Slide 24: Summary

    Summary  Execution-focused management with track record of operational and exploration success, growth and value generation  High-quality, cash flowing asset portfolio with major exploration upside  Strong balance sheet, self-funding projects, zero net debt  Rapid increase in production and marg

  25. Slide 25: Appendices

    TSX: MND Appendices For more information, please contact: Greg DiTomaso Tel: 647.260.1566 Email: g.ditomaso@mandalayresources.com Company Website: www.mandalayresources.com Twitter: @MandalayAuAg 25

  26. Slide 26: Mandalay Reserves

    Mandalay Reserves Ore Ag Grade Ag Au Grade Au Cerro Bayo Reserves (1) (t) (g/t) (cont. oz) (g/t) (cont. oz) Proven Reserves 420,000 356 4,803,000 2.2 30,000 Probable Reserves 1,934,000 216 13,447,000 2.1 133,000 P&P Reserves 2,354,000 241 18,250,000 2.2 163,000 Ore Sb Grade Sb Au Grade Au Costerfiel

  27. Slide 27: Mandalay Resources

    Mandalay Resources Resource Ag Grade Ag Au Grade Au Cerro Bayo Resources (1) (t) (g/t) (cont. oz) (g/t) (cont. oz) Measured Resources 327,000 525 5,521,000 3.2 33,000 Indicated Resources 1,562,000 334 16,754,000 3.2 160,000 M&I Resources 1,889,000 367 22,276,000 3.2 194,000 Inferred Resources 452,00

  28. Slide 28: Safety, Health, Environment and Community

    Safety, Health, Environment and Community Safety & Health Environment & Community Employees ACTIONS • Spending on S&H (including • Spent over 200% more in 2012 • Employee selection process safety training) tripled in last on environment & community improved two years projects as compared to 2011 • F

  29. Slide 29: Cerro Bayo – Dagny Extension Under Laguna Verde

    Cerro Bayo – Dagny Extension Under Laguna Verde 29

  30. Slide 30: Coyita Extension

    Coyita Extension NW LAGUNA VERDE - COYITA VEIN SE LONGITUDINAL SECTION - DRILLING PLAN DECEMBER 2012 > Degyo1z neovoka pyo22 e Dcoy009 0 18 Deny I Laguna Verde Boyo0s e DeOvORs LJ Berra B00x003 ocoyo26ycoyo1s Dooyor Dcoyo23 @ vDIMos2 cov" pcoyos: LEGEND LITHOLOGY DRILL 2011 RESOURCES POST-MINERAL =

  31. Slide 31: Marcela Sur Expansion

    Marcela Sur Expansion LAGUNA VERDE - MARCELA SUR VEIN N LONGITUDINAL SECTION - DRILLING PLAN s DECEMBER 2012 CAMINO PUBLICO 10009) 8 Z a g g 5 5 5 LEGEND LITHOLOGY DRILL MINE WORKINGS ?OST-MINERAL [| Gravels ‘Symbology Assay color legend — Devooped April 2010 RESOURCES Historic drilholes © >200gt Ag

  32. Slide 32: Costerfield – N-lode

    Costerfield - N-lode = zs T S = & a Si & S s 3S 3 3 8 3 3 8 s 3 s 3 s Ss Zz Zz iz iz Iz Iz NDALAY_RESOURCES| Costerfield Operation N Lode Longitudinal Section - December 2012 Mountain Creek Surface | y H400RL a ° ypo20 [ Sea 7 HOOORL gors sal@too ono RL eoz2we s1k@o8 g00RL r i Legend May 2012 4 Lith

  33. Slide 33: Costerfield – Cuffley

    Costerfield — Cuffley re Fs a FS iB i T is T ay g é 3 3 3 8 8 3 8 3 s s s s 8 Ss s Zz a Zz Iz Zz Iz Zz \aoctay nesources ©0Sterfield Operation Cuffley Longitudinal Section December 2012 Surface ° ° . ° H100RL . ee O 2s e ° ° b . ° ° A000RL e RL ° i D025 _ 1147@ 2694 Os RL Lithology Legend ay 2012 70

  34. Slide 34: Metal Price History

    Sb price USD/t Au price USD/oz 1,200 1,300 1,400 1,500 1,600 1,700 1,800 1,900 2,000 10,000 11,000 12,000 13,000 14,000 15,000 01/Nov/12 01/Nov/12 08/Nov/12 08/Nov/12 15/Nov/12 15/Nov/12 22/Nov/12 22/Nov/12 29/Nov/12 29/Nov/12 06/Dec/12 06/Dec/12 13/Dec/12 13/Dec/12 Source: www.metalbulletin.com 20/

  35. Slide 35: Antimony Facts

    Antimony Facts  140,000 t/y global market • Sold either as metal ingots or various grades of antimony oxides and trioxides • Primary use as fire retardant in fabrics and plastics (trioxides) • Relatively minor uses in electronics, with possible new uses in development, e.g. in batteries • Ingredien

  36. Slide 36: Gold Equivalent Ounces Calculation; Silver Equivalent Ounces Calculation

    Gold Equivalent Ounces Calculation ***Au Eq. oz produced is calculated by multiplying the saleable quantities of Au, Ag, and Sb in the period by the respective average market prices of the commodities in the period, adding the three amounts to get a “total contained value based on market price”, and

Mandalay Resources — Investor Presentation (April 2013) on 6ix