Slide 1: Hamilton Works Community Liaison Committee Meeting Q2 2021
Hamilton Works Community Liaison Committee Meeting Q2 2021 July 2021
Slide 2: Agenda
Agenda 1. Introductions 2. Draft Summary Note – 28 April 2021 meeting 3. Coke Battery Performance Summary –Q2 2021 4. #1 Baywater Intake – Recent Maintenance Dredging 5. Additional Updates 6. Community Feedback 7. Next Meeting 8. Adjournment
Slide 3: Coke Battery Performance Review – Daily (Particulates)
Coke Battery Performance Review – Daily (Particulates) Date Doors Lids Off-takes (% Leaks) (% Leaks) (% Leaks) 2015 July 2-Dec 31 Thresholds 54% 2% NA 2016 Thresholds 32% 2% NA 2017-2019 Thresholds 10% 2% 5% 2020-2021 Thresholds 5% 1% 4% Apr – Jun 2021 Range 0 – 4.23% 0 – 0.77% 0 – 2.47% (Average) (
Slide 4: Performance Review – 30 Day Rolling Averages (Particulates)
Performance Review – 30 Day Rolling Averages (Particulates) Date Doors Lids Off-takes Charging (% Leaks) (% Leaks) (% Leaks) (sec) (log avg) 2015 July 2-Dec 31 Thresholds 38% 0.8% 25% 12 sec 2016 Limits 22.5% 0.8% 15% 12 s 2017-2019 Limits 7% 0.8% 4.2% 12 s 2020-2021 Limits 4% 0.4% 2.5% 12 s Apr – J
Slide 5: Performance Review – Daily Observations – Pushing Emissions (Particulates)
Performance Review – Daily Observations – Pushing Emissions (Particulates) Date Pushing Emission (opacity %) 2015 Limit (July 2 start) ≥ 50% 2016 – 2018 ≥ 50% 2019 ≥ 40% 2020 - 2021 ≥ 30% Apr – Jun Range 0 – 28.33% (Average) (7.58%) Apr – Jun Operational Adjustments (0 exceedances) • None required
Slide 6: Coke Battery Performance Review – Additional Items
Coke Battery Performance Review – Additional Items Community Complaints: • No complaints attributable to Stelco’s operations were received, however the following general enquiries were investigated: o April 9, 2021: MECP - Rotten egg or sulphur-like odour in North Hamilton o A boiler was undergoing
Slide 7: #1 Baywater Intake – Recent Maintenance Dredging
#1 Baywater Intake – Recent Maintenance Dredging Background • Stelco’s #1 Baywater intake is located at the north side of the plant. Water from Hamilton Harbour is used for dust control on our coalfield plant roadways • It was observed that the water flow was reduced as the water tankers were being
Slide 8: Aerial View
Aerial View
Slide 9: Dredging Overview
Dredging Overview • To conduct maintenance dredging, Stelco obtained a permit from Hamilton Conservation Authority • Assessment by third party coastal engineer • Furthermore, obtained approval from Department of Fisheries and Oceans and the Ministry of Natural Resources and Forestry • Dredging was c
Slide 10: Dredging Overview (cont’d)
Dredging Overview (cont’d) Prior to dredging, a silt curtain was installed completely around the structure to contain any silt during the excavation work. The sediment on either side of the pipe was dredged with a long reach excavator. The excavated silt and sediment was placed on the bank to dewate
Slide 11: Dredging Overview (cont’d)
Dredging Overview (cont’d) • Once the sediment was dredged from around the pipe, the intake screen was removed and divers cleaned the accumulated silt inside the pipe using an airlift hanging from the long reach excavator and a diver assisted venture dredge. After cleaning, the intake screens were r
Slide 12: #1 Baywater Intake – Dredging Completed
#1 Baywater Intake – Dredging Completed
Slide 13: Additional Updates
Additional Updates • Application for an Environmental Compliance Approval for waste receiver (existing wastewater treatment facility) with limited operational flexibility is on Environmental Registry for public consultation • Previously discussed with CLC in 2020 • Amended Site-Specific Standard for
Slide 14: Community Feedback
Community Feedback | STELCO } *
Slide 15: Next Meeting
Next Meeting • Wed. October 27, 2021
Slide 16: Thank You.
| STELCO | . The Steel Company of Canada Thank You. stelco.com