  1. Slide 1: ASX Announcement: November 2026 Investor Presentation

    ASX ANNOUNCEMENT 11 November 2026 For personal use only November 2026 Investor Presentation Bannerman Energy Ltd (ASX:BMN, OTCQX:BNNLF, NSX:BMN) (Bannerman or the Company) is pleased to release a copy of its latest investor presentation to be provided by Managing Director and CEO, Mr Gavin Chamberla

  2. Slide 2: Leading the uranium revolution

    ASX: BMN OTCQX: BNNLF NSX: BMN rsonal use only Leading the uranium revolution Investor Presentation | November 2026 Fully funded Delivery focused Positioned for growth

  3. Slide 3: Important notices

    Important notices Forward Looking Statements Competent Person Statement This presentation includes various forward looking statements which are identified by the use of forward looking words such Mineral Resources as “may”, “could”, “will”, “expect”, “believes”, “intend”, “plan”, “estimate”, “antici

  4. Slide 4: Building the world's next uranium mine

    Building the world’s next uranium mine • Full-scale construction in progress rsonal use only following positive Final Investment Decision (October 2026) • Large-scale resource, highly derisked project, robust economics and clear expansion upside • Strong social licence to operate in Namibia, a Top 3

  5. Slide 5: Bannerman Energy corporate snapshot

    Bannerman Energy Corporate snapshot Capital structure Share price (ASX: BMN) rsonal use only ASX share price (10 Nov 2026) A$3.70 $6.00 Shares on issue 239.1 M $5.00 Market capitalisation A$885 M $4.00 Options and performance rights 2.5 M $3.00 Average daily volume (ASX 3-month) 1.2 M Cash (at 30 Se

  6. Slide 6: A dedicated cross-border team

    A dedicated cross-border team With extensive global uranium credentials Brandon Munro | Executive Chairman Gavin Chamberlain | Managing Director & CEO Management Board of Directors rsonal use only • 25+ years in resources, corporate law and uranium strategy • 30+ years in engineering, construction a

  7. Slide 7: A new growth era for uranium

    rsonal use only A new growth era for uranium Compelling long-term industry outlook

  8. Slide 8: A multi-decade demand growth cycle

    A multi-decade demand growth cycle Accelerating nuclear deployment and constrained supply • Renewed global support for nuclear as a Upper Scenario for Uranium Supply and Demand (Mlbs U3O8) 585 rsonal use only secure, low-carbon source of baseload power Persistent 520 cumulative • Increasing recognit

  9. Slide 9: Growing nuclear industry tailwinds

    Growing nuclear industry tailwinds Building adoption of nuclear planned decades ahead Operating across Supplying approx. USA 443 31 9% rsonal use only nuclear China reactors countries of global electricity France China accounts for Russia ~50% of new reactor builds Japan Korea New reactor builds and

  10. Slide 10: Our flagship: The Etango Uranium Project

    rsonal use only Our flagship The Etango Uranium Project

  11. Slide 11: The Etango JV: A solid platform for future growth

    The Etango JV: A solid platform for future growth Strategic partnership with CNNC Group, a global leader in the nuclear industry • Bannerman attributable 52.25% rsonal use only interest in Etango Uranium Project CNNC Overseas Bannerman Energy Limited (CNOL) • Forecast pre-production capital fully fu

  12. Slide 12: Etango at a glance

    Etango at a glance 15 years 3.5 Mlb One of the world’s largest and most advanced Initial mine life Average U3O8 output p.a. uranium development assets rsonal use only • Located in Namibia's premier uranium province, 30km south-east of Swakopmund 52.6 Mlb 8 Mtpa • Globally significant 207 Mlb U₃O₈ To

  13. Slide 13: Namibia: A globally significant uranium mining jurisdiction

    Namibia A globally significant uranium mining jurisdiction Tier 1 Uranium jurisdiction with a long- rsonal use only standing track record as a trusted supplier to global nuclear utilities 50 years Continuous uranium production, supported by an established mining industry and mature workforce 3 Globa

  14. Slide 14: A highly derisked asset

    A highly derisked asset Built from the ground up • Systematically de-risked over 20 years of exploration rsonal use only drilling, technical studies and detailed metallurgical testwork; ensuring robust, proven input parameters • Large-scale, multi-year Heap Leach Demonstration Plant comprehensively

  15. Slide 15: On the path to production

    On the path to production Extensive early works build program delivered on budget and schedule, now in full-scale construction rsonal use only Phase 1 permanent Bulk earthworks ~99% Contractor workforce on 14,700m³ of concrete water supply pipeline complete, with final phase site of approximately 52

  16. Slide 16: Etango fully funded through production and ramp-up

    Etango fully funded through production, ramp-up and into commercial uranium production Capital spent Residual forecast to date pre-production capital spend rsonal use only 64 289 US$353M Total forecast Etango pre-production capex Forecast Etango pre- production capital and ~US$60M Bannerman’s residu

  17. Slide 17: Building a broader uranium business

    rsonal use only Building a broader uranium business

  18. Slide 18: Building a broader uranium business

    Building a broader uranium business Long-term value growth beyond initial Etango development rsonal use only 1 2 3 Etango-16 Regional exploration Strategic opportunities • Subsequent expansion of Etango-8 • Building on existing resource, satellite • Regional partnership and consolidation base-case o

  19. Slide 19: Etango-16: The next phase of production growth

    1 Etango-16: The next phase of production growth Plant throughput expansion rsonal use only Potential post ramp-up mine and plant expansion that roughly doubles annual ore throughput 8 Mtpa 16 Mtpa Increased annual U3O8 output Scaled production extracting higher value from 3.5 Mlbs p.a. 6.7 Mlbs p.a

  20. Slide 20: Regional exploration

    2 Regional exploration Further potential in a world-class province • Etango represents highly strategic tenure within a Tier-1 rsonal use only uranium mining and exploration region • Significant potential to unlock satellite resources and regional discoveries to support further mine expansion and li

  21. Slide 21: Leading the uranium revolution

    Leading the uranium revolution Etango in full-scale construction and set to Fully funded, debt-free pathway be the next large-scale uranium producer into commercial production rsonal use only Experienced in-country execution team Located in Namibia, a leading and Tier-1 global nuclear partner, CNNC

  22. Slide 22: Contact Us

    ASX: BMN OTCQX: BNNLF NSX: BMN Contact Us rsonal use only Registered & Principal Office Emma Culver Suite 7, 245 Churchill Ave Investor Relations Manager Subiaco Western Australia 6008 eculver@bmnenergy.com.au +61 8 9831 1436 Postal Address PO Box 1973 Subiaco Western Australia bannermanenergy.com +

  23. Slide 23: Appendices

    GE BANNERMAN N energy Appendices

  24. Slide 24: Etango-8 DFS and Etango-XP / XT Scoping Study

    Etango-8 DFS and Etango-XP / XT Scoping Study Incorporating Front-End Engineering and Design (FEED) and Control Budget Estimate (CBE) processes Key Metrics (100% basis) Unit Etango-8 Etango-XP (second phase to 16 mtpa) Etango-XT (extended life at 8Mtpa) Physicals rsonal use only Total ore mined and

  25. Slide 25: Mineral Resource and Ore Reserves (Etango 100% basis)

    Mineral Resource and Ore Reserves (Etango 100% basis) Ore Reserve (100ppm U3O8 cut-off)3 Mineral Resource Estimate (55ppm U3O8 cut-off)1,3 Tonnes Grade Contained Tonnes Grade Contained Resource category Resource category rsonal use only (Mt) (ppm U3O8) U3O8 (Mlb) (Mt) (ppm U3O8) U3O8 (Mlb) Proved 15