  1. Slide 1: Energy Performance Systems, Inc.

    Energy Performance Systems, Inc. Improving the Efficiency of Planting, Tending and Harvesting Farm-Grown Trees for Energy To: Xcel RDF advisory group L. David Ostlie, Principal Investigator Lynn L Wright, Investigator

  2. Slide 2: Value Based Research Goals

    Value Based Research Goals Values  Lower the cost of electric power generation using renewable wood fuel; enough to cover the added risk in using new, model-one technology  Establish a large scale (90 acre) tree farm demonstration using short growth cycle wood (5 years) to maximize fuel production

  3. Slide 3: EPS Injection Planter

    EPS Injection Planter Planter in Operation at the Graceville Site

  4. Slide 4: Planter Summary

    Planter Summary  Multi-row planter was built  Planter was used under operational conditions  Test demonstrated potential of machine injection; tree survival and growth was similar to hand planted sections of field  Slip injection springs & materials have been redesigned  Planting Cost Proved to

  5. Slide 5: EPS Whole Tree Harvester

    EPS Whole Tree Harvester™ Harvester after 160 Mile Transport to site Power Systems Being re- installed and Tested at Nearby Farm Site 5

  6. Slide 6: EPS Whole Tree Harvester

    EPS Whole Tree Harvester™ Harvesting Head: Continuously travels and cuts up to 9 feet per second without stopping while self sharpening blades and cuts up to a 30” diameter tree

  7. Slide 7: EPS Whole Tree Harvester

    EPS Whole Tree Harvester™ Harvester Cutting Second Row of Trees 7

  8. Slide 8: Project Participants

    Project Participants Project Demonstration Participants 8

  9. Slide 9: Project Participants

    Project Participants Project Demonstration Participants Resting After Doubling as Camera Personnel 9

  10. Slide 10: Harvester Summary

    Harvester Summary  900 HP 65 Ton, 4 Tracked Unit  Contiuously Harvested Trees at Speeds up to 8 FPS (6 MPH)  Can Harvest up to 30” Trees  Lifted Trees 13 Feet to Load Semi Trailers  Cleanly Cut Trees within 2 Inches of the Ground  Proved Self Centering Cutting Head to be Effective  Traveled w

  11. Slide 11: Harvester Demonstration

    Harvester Demonstration CEO Feeling Downsized after a Particularly Difficult Day 1

  12. Slide 12: Hybrid Poplar Glencoe Tree Farm

    Hybrid Poplar Glencoe Tree Farm Project Investigator Lynn Wright Showing First Year Growth of NM-6 Hybrid Poplar on 80 Acre Site

  13. Slide 13: Hybrid Poplar Yield Results

    Hybrid Poplar Yield Results 40 Acre Tree Farm Near Graceville, MN Section of Farm Yielding 4 Dry Tons per Acre Per Year in 6 Years

  14. Slide 14: Planting Cost Analysis

    Planting Cost Analysis Required Factors Estimated Costs Six general laborers $8/hr, 600 hrs each season = $28,800 One skilled, trained, and certified operator $50/hr, 500 hrs each season = $25,000 Fuel $12,000 Miscellaneous (i.e. maintenance, tires, etc.) $13,000 Estimated Annual Operating Cost $78,

  15. Slide 15: Wood Production Cost Analyses

    Wood Production Cost Analyses One Harvest, 6-year, EPS Two Coppice Harvest, 12-year- One Harvest, 12 year NRRI Cost Type Costs EPS Costs assumptions Land Rent $660.00 $1,320.00 $1,320.00 Harvest Yield (dry tons/acre) 24.78 49.56 48 NPV of all costs $924.22 $1,470.76 $1,549 Discounted Breakeven Price

  16. Slide 16: Benefit to the Rate Payer

    Benefit to the Rate Payer  A new system was developed to lower the cost of renewable energy including new methods and new equipment  If the legislature mandates increased attention to climate change caused by greenhouse gas emissions, this project provides a pathway to help satisfy the mandate wit

  17. Slide 17: Where Do We Go From Here?

    Where Do We Go From Here?  Our Research indicates an all-in power plant delivered fuel cost of 3.65/Mbtu  The increased fuel cost would be similar to natural gas in some regions  Establishing a fuel plantation takes 6 years, 3 years before and 3 years after plant startup  By Reducing the cost of

  18. Slide 18: Electric Power From Trees

    Electric Power From Trees  Now is the Time for Closed Loop, Wood fueled, Electric Power Production  EPS wishes to thank the RDF advisory Group, the Minnesota Public Utilities Commision including the rate payers and Xcel Energy in making our project possible. Project funding provided in part by cus