Meteoric Resources Nl · ASX:MEI
Meteoric Resources Nl — Meteoric Resources — Mines and Money September 2020
16 slides from Meteoric Resources Nl's conference presentation, Sep 1, 2020
Slide 1: Discovering Gold - 2020
METEORIC RESOURCES For personal use only DISCOVERING GOLD - 2020 Meteoric Resources NL - Mines and Money September 2020
Slide 2: Disclaimer
For personal use only DISCLAIMER The material in this presentation has been prepared by Meteoric Resources and is general background information about Meteoric’s activities current as at the date of this presentation. This information is given in summary form and does not purport to be complete. Inf
Slide 3: Corporate Overview
CORPORATE OVERVIEW For personal use only Andrew Tunks Managing Director Dr Tunks is a member of the Australian Institute of Geoscientist holding a B.Sc. (Hons.) from Monash and a Ph.D from the University of Tasmania. Dr Tunks has held numerous senior executive positions in a range of small to large
Slide 4: Growing Footprint Australia – Brazil
GROWING FOOTPRINT AUSTRALIA – BRAZIL For personal use only Palm Springs – Halls Creek W.A Juruena – Northern Mato Grosso Historic Mine 50K oz Produced in 1990s Garimpo production 1980s approx. 500k oz Classic Proterozoic Orogenic Gold Low sulfidation epithermal gold & Porphyry copper-gold Drilling C
Slide 5: Australia – Palm Springs Gold Project
AUSTRALIA – PALM SPRINGS GOLD PROJECT For personal use only
Slide 6: WA Gold Acquisition – Palm Springs Gold Project
WA GOLD ACQUISITION – PALM SPRINGS GOLD PROJECT For personal use only Halls Creek • Palm Spring Gold Project Butchers Creek Open Cut – • Operated 1995 – 1997 Acquisition of 13 licences - 120km2 • 50,000 oz produced • Includes 3 MLs • Ore in floor of pit • 60 Gold Prospects in Project • No JORC 2012
Slide 7: Historic Data – X Section 10,100 mN
For personal use only HISTORIC DATA –X SECTION 10,100 mN Historic Data Butchers Creek • NO COMPLETE DATABASE • 65 A0 EW X-Sections • Paper drill logs • Digital Pit Design • Final Pit Design • Plant Specs • Tailing Dam Specs 7 | INVESTOR PRESENTATION
Slide 8: Palm Springs Gold Project Historic Data – X Section 10,100 mN
PALM SPRINGS GOLD PROJECT HISTORIC DATA –X SECTION 10,100 MN For personal use only Ground Surface Planned Pit, 1995 Actual Pit floor 1997 At closure 8 | INVESTOR PRESENTATION
Slide 9: For personal use only
For personal use only • Historical section 10,100mN • Pencil workings from 1996 • Only drilling data we have • Final Pit Survey - pit depth at 335m (top of this view) 35m • Amazing robust orebody beneath the floor of the abandoned pit – waiting to be RE-discovered! • Drilling commenced 24th August 2
Slide 10: Palm Springs Gold Project Butchers Creek
PALM SPRINGS GOLD PROJECT BUTCHERS CREEK For personal use only • Abundant ore remains in the floor of the southern end of Butchers Creek Pit • The orebody is completely open at depth and down plunge to the south • The entire prospect lies with granted Mining Leases from the early 1990s ALSO • 9Mt Ta
Slide 11: Palm Springs Gold Project Exploration Program
PALM SPRINGS GOLD PROJECT EXPLORATION PROGRAM For personal use only 2020 Exploration Program • 5,000m RC • 1,500m Diamond • Planning for Geophysics • Construction of Regional Structural Interpretation • Evaluation of untested historic anomalies 11 | INVESTOR PRESENTATION
Slide 12: Brazil - Juruena
For personal use only BRAZIL - JURUENA
Slide 13: Brazil – Juruena History
BRAZIL – JURUENA HISTORY For personal use only • Juruena contains extensive artisanal workings- Recorded production in excess of 500,000oz gold MEI completed an extensive 2019 drilling campaign with some spectacular results • JUDD001 – 20.6m @ 94.5 g/t from 96m including 3.65m @ 505 g/t – Dona Maria
Slide 14: Juruena Gold – JORC Resource
JURUENA GOLD – JORC RESOURCE For personal use only PROSPECT CATEGORY CUT OFF Tonnes Grade (g/t) Oz Au Indicated 67,800 13.7 29,800 Donna Maria Inferred 2.5 g/t 148,500 12.2 58,200 Sub-total 216,300 12.7 88,000 Indicated 31,200 28.4 28,500 Querosene Inferred 2.5 g/t 188,700 14.7 89,300 Sub-total 219,
Slide 15: Dona Maria – 2020 Drilling
DONA MARIA – 2020 DRILLING For personal use only • Moderate to steeply dipping orezones • Average 1m to 4m true width • Bonanza Grades controlled by fault intersections? • Excellent Metallurgy with > 90% recoveries • 2020 Program Extending Resource at Depth • Drilling NOW • Results to flow JUDD025 3
Slide 16: Summary
SUMMARY For personal use only Currently drilling at Juruena – Latest results 31/08 9m @ 15.6 g/t Au and 1.5% Cu – JUDD024 3.4m @ 10.1 g/t Au – JUDD025 Drilling Commenced at Palm Springs 24th August Results expected October Meteoric Over 10,000m of drilling across two continents Generating strong exp