Alamos Gold Inc. · TSX:AGI

Alamos Gold — Technical Presentation (April 2013)

5 slides from Alamos Gold's technical presentation, Apr 1, 2013

  1. Slide 1: Planned Reserve Pit outlines (2011)

    ey Planned Reserve Pit outlines (2011) Ste Sikcagetera tion (Orr

  2. Slide 2: Figure 2: Mulatos District Property Alteration and Known Gold Occurrences

    Figure 2: Mulatos District Property Alteration and Known Gold Occurrences

  3. Slide 3: Figure 3: Ağı Dağı Project Alterations and Known Gold Occurrences

    Figure 3: Ağı Dağı Project Alterations and Known Gold Occurrences

  4. Slide 4: Figure 4: Ağı Dağı and Çamyurt Project Alterations and Known Gold Occurrences

    Figure 4: Ağı Dağı and Çamyurt Project Alterations and Known Gold Occurrences

  5. Slide 5: Figure 5: Kirazlı Project Alteration and Known Gold Occurrences

    Figure 5: Kirazlı Project Alteration and Known Gold Occurrences San Carlos - Composite Intervals 1 Include intervals at >0.30 g/t Au over a 3 metres minimum width, no assay cut DRILL HOLE DRILLING METHOD TOTAL DEPTH (m) FROM (m) TO (m) INT. (m) GOLD (g/t) 12SC164 RC 477.13 407.01 410.06 3.05 0.953 1

Alamos Gold — Technical Presentation (April 2013) on 6ix