Alamos Gold Inc. · TSX:AGI
Alamos Gold — Technical Presentation (April 2013)
5 slides from Alamos Gold's technical presentation, Apr 1, 2013
Slide 1: Planned Reserve Pit outlines (2011)
ey Planned Reserve Pit outlines (2011) Ste Sikcagetera tion (Orr
Slide 2: Figure 2: Mulatos District Property Alteration and Known Gold Occurrences
Figure 2: Mulatos District Property Alteration and Known Gold Occurrences
Slide 3: Figure 3: Ağı Dağı Project Alterations and Known Gold Occurrences
Figure 3: Ağı Dağı Project Alterations and Known Gold Occurrences
Slide 4: Figure 4: Ağı Dağı and Çamyurt Project Alterations and Known Gold Occurrences
Figure 4: Ağı Dağı and Çamyurt Project Alterations and Known Gold Occurrences
Slide 5: Figure 5: Kirazlı Project Alteration and Known Gold Occurrences
Figure 5: Kirazlı Project Alteration and Known Gold Occurrences San Carlos - Composite Intervals 1 Include intervals at >0.30 g/t Au over a 3 metres minimum width, no assay cut DRILL HOLE DRILLING METHOD TOTAL DEPTH (m) FROM (m) TO (m) INT. (m) GOLD (g/t) 12SC164 RC 477.13 407.01 410.06 3.05 0.953 1
Alamos Gold — Technical Presentation (April 2013) on 6ix