Slide 1: Specifying Power System Equipment for Water and Wastewater Applications
Power Systems Specifying Power System Equipment for Water and Wastewater Applications PowerHour webinar series for consulting engineers Experts you trust. Excellence you count on. January 28, 2021 12:00pm Eastern Time / 9:00am Pacific Time (1 PDH issued by Cummins Inc.) Cummins Public
Slide 2: Welcome!
Welcome! Cummins PowerHour webinar series is designed to help our engineer partners to… Keep up to date on products, technology, and codes and standards development , Hyperlinks have been included in this slide deck for additional content for specific topics. Interact with Cummins experts and ga
Slide 3: Meet your panelists
Meet your panelists Cummins Facilitator: Cummins Panelist: Cummins Panelist: John Chen Brian Pumphrey Earnest Glaser Technical Marketing Specialist Director of Sales Application Engineering Senior Sales Application Engineer Cummins Inc. Western USA, Cummins Inc. Cummins Inc. AZ, ID, NM, NV: Carl K
Slide 4: Disclaimer
Disclaimer The views and opinions expressed in this course shall not be considered the official position of any regulatory organization and shall not be considered to be, nor be relied upon as, a Formal Interpretation. Participants are encouraged to refer to the entire text of all referenced documen
Slide 5: Course Objectives
Course Objectives Emergency Standby Power Systems Requirements/Recommendations for Water and Wastewater Facilities: This course is designed to discuss requirements/recommendations of Emergency Standby Power Systems for Water and Wastewater Treatment applications. After completing this course, partic
Slide 6: Agenda
Agenda • Brief Water and Wastewater Treatment Overview • Generator Sizing and Solution Options • Important Design Considerations • Installation Examples • Q&A 6
Slide 7: Background and Overview
Background and Overview 7
Slide 8: Water and Energy
Water and Energy • Energy and water are intricately connected. • Energy availability is the pillar for social and economic progress in a society. Water holds the Key! • Energy is of primary importance for water management and developments. 8
Slide 9: Water Treatment
Water Treatment • Water and wastewater treatment plants produce water for consumption and recycling. • Municipalities rely upon their water network to provide efficient distribution of precious water resources at the lowest cost to local stakeholders. • Water treatment facilities treat surface or gr
Slide 10: Supply Water Treatment
Supply Water Treatment Pumps highlighted In RED http://northpennwater.org/Forest-Park-Water-Treatment-Plant 10
Slide 11: Wastewater Treatment Overview
Wastewater Treatment Overview Pumps highlighted In RED https://commons.wikimedia.org/w/index.php?curid=39975544 11
Slide 12: Wastewater Flow Path (Lift Stations)
Wastewater Flow Path (Lift Stations) Metropolitan Council https://www.youtube.com/watch?v=Z9-DXl028-Y 12
Slide 13: Supply Water Treatment Outage Consequences
Supply Water Treatment Outage Consequences • When pumps go offline due to power outages, these processes are halted and water distribution ceases. • In the case of large municipalities, returning all plant systems to normal operations and resuming the distribution of water can be a daunting task. •
Slide 14: Water Treatment Outage Consequences (Cont’d)
Water Treatment Outage Consequences (Cont’d) • Water distribution facilities are the heart of the water network, responsible for pumping water through the system. • A power outage that disrupts pumping or lifting stations can put a significant strain on the network, potentially leading to flooding o
Slide 15: Power System Sizing and Solution Options
Power System Sizing and Solution Options 15
Slide 16: Power System Options
Power System Options On-site (stationary or mobile) 16
Slide 17: Generator Selection
Generator Selection Spec Note: As highlighted on the right and earlier in the presentation, pumps comprise a large portion of the electrical loads at WT and WWTP facilities. Motor starting capability should be carefully considered when selecting a generator supplier. 17
Slide 18: Generator Selection: Automatic Voltage Regulator (AVR)
Generator Selection: Automatic Voltage Regulator (AVR) SCR Controlled AVR (With Harmonics) SCR Controlled AVR FET Controlled AVR (Without Harmonics) with Pulse Width Modulation (PWM) Excitation System Spec Note: Specify 3-phase sensing, full wave rectified FET type AVR, with PMG Related White Papers
Slide 19: Generator Selection: Sizing
Generator Selection: Sizing • Online sizing tools help to account for variables that impact generator sizing, such as: • Soft start capabilities • Variable frequency drives (VFDs) • Motor starting abilities Power Hour • Introduction to Generator Set Sizing Related Software Content • Advanced Generat
Slide 20: Concept Check
Concept Check The following variable(s) should be included when utilizing a power system supplier’s online sizing tool in order to ensure that the appropriate power system is selected: A. Maximum Load B. Soft Starting Capability C. Variable Frequency Drives D. Motor Starting Abilities E. All of the
Slide 21: Concept Check
Concept Check The following variable(s) should be included when utilizing a power system supplier’s online sizing tool in order to ensure that the appropriate power system is selected: A. Maximum Load B. Soft Starting Capability C. Variable Frequency Drives D. Motor Starting Abilities E. All of the
Slide 22: Generator Selection/Sizing: Fuel Choice
Generator Selection/Sizing: Fuel Choice • Due to fuel shortages caused by extended outages that were the result of recent hurricanes, larger onsite fuel storage is now being required in some regions. • Fuel testing requirements for diesel fuel tanks must also be considered. Power Hour Related Consid
Slide 23: Generator Selection/Sizing: Fuel Choice (Cont’d)
Generator Selection/Sizing: Fuel Choice (Cont’d) • Natural gas generator sets may not be suitable for seismic regions • Natural gas infrastructure has limitations, depending on location, however, it’s important to note, natural gas infrastructure was not impacted during major recent storms Irene, Sa
Slide 24: Generator Selection/Sizing: Rating Types
Generator Selection/Sizing: Rating Types What type of rating is appropriate for Water and Waste Water applications? Industry Standard for Generator Set Ratings: • ISO 8528: Standard for reciprocating internal combustion engine driven alternating current generator sets. • Defines application, ratings
Slide 25: Emergency Standby Power (ESP)
Emergency Standby Power (ESP) Spec Note: If a generator set is only utilized for emergency backup, not demand response or rate curtailment, then, a Standby rating should be specified. Prime and Continuous ratings are not properly suited for emergency backup applications as this can cause the generat
Slide 26: Why Customers Need or Want a Tier 4 Solution for Diesel?
Why Customers Need or Want a Tier 4 Solution for Diesel? Need • to operate outside of the emergency standby limitations set forth by the EPA. (i.e. prime, peak shaving, rate curtailment, etc.) • to comply with local requirements (BACT) Related Power Hour Emissions and Air Permitting for Content Want
Slide 27: Cummins Tier 4 Certified vs Tier 4 Compliant Products
Cummins Tier 4 Certified vs Tier 4 Compliant Products EPA Tier 4 Certified Tier 4 Compliant • Extended operation non-emergency • Lower price point • “Inducement- • Not regulated by EPA • Meets T4 shutdowns” (example: emissions limits • Modifications are forced shutdowns if DEF permitted, DEF tank fl
Slide 28: Cummins Tier 4 Products
Cummins Tier 4 Products Generator Set Standby Engine Model Rating Model (kWe) Certified DQFAH 1000 QST30-G17 DQGAS 1500 QSK50-G8 DQKAM 2250 QSK60-G17 DQLH 2750 QSK78-G14 Generator Set Standby Engine Model Model Rating Engine Standby T4 Compliant (kWe) Model Rating (kWe) System C70D2RE 70 QSB5-G11 Po
Slide 29: Concept Check
Concept Check If a customer plans to use a backup power system only in emergency situations, totaling less than 200 hours per year, then the most effective rating choice, in terms of cost and space claim, would be: A. Limited Time Prime B. Prime C. Emergency Standby D. Continuous 29
Slide 30: Concept Check
Concept Check If a customer plans to use a backup power system only in emergency situations, totaling less than 200 hours per year, then, the most effective rating choice, in terms of cost and space claim, would be: A. Limited Time Prime B. Prime C. Emergency Standby D. Continuous 30
Slide 31: Additional Design Considerations
Additional Design Considerations 31
Slide 32: Power Transfer Design Considerations (Open Transition)
Power Transfer Design Considerations (Open Transition) • An Automatic Transfer Switch (ATS) or breaker pairs can be used for transferring power from one source to another. • In applications where a significant portion of the loads are motors, the design must be cognizant when switching between two l
Slide 33: Residual Voltage Decay
Residual Voltage Decay Voltage decays exponentially (independent of motor speed) NEMA MG-1 recommends a delay of 1.5 Motor Open Circuit Time Constants • Voltage will be at 22% of nominal For multiple motors, use the time delay for the largest motor 22% of nominal voltage (safe transfer) Residu
Slide 34: Design Considerations (Closed Transition Transfer)
Design Considerations (Closed Transition Transfer) • If closed transition (make-before-break) is being considered, be sure to verify acceptability with local utility at least six months in advance. • ATSs cannot anticipate a power failure. The site will experience a power outage if the utility unexp
Slide 35: Design Considerations (ATSs / Switchgear)
Design Considerations (ATSs / Switchgear) • If transfer switches or gear will be located outdoors, be sure to verify site environmental requirements. Often, NEMA 3R or 4X enclosures with anti-condensation heaters are required. • Ensure that switchgear busses are plated with a material compatible wit
Slide 36: Design Considerations (Switchboard/Switchgear)
Design Considerations (Switchboard/Switchgear) • Switchboard/Switchgear/Metal-Clad Switchgear size and accessibility are important factors when designing installations. • Specifying front access only ATSs and switchboards provide an advantage by not requiring rear access, which will allow the gear t
Slide 37: Design Considerations (Pre-configured equipment)
Design Considerations (Pre-configured equipment) • Generator vendors often offer a wide selection of preconfigured switchboard sections for: • Generator paralleling • Utility and generator main breakers • Transfer breaker pairs • Molded case and insulated case feeder breakers . • Preconfigured Digit
Slide 38: Digital Master Control
Digital Master Control Provides added functionality beyond what is available from engine/genset and ATS controls Examples of when a digital master control may be necessary: • Load addition and load shedding sequence. • Monitoring the plant’s power flow. • Perform load transfer between multiple u
Slide 39: Concept Check
Concept Check Specifying predesigned, preconfigured switchgear/ATS solutions can lead to the following benefits: A. Reduce Lead Time B. Reduce Engineering Work C. Increase Overall Cost D. Answers A & B 39
Slide 40: Concept Check
Concept Check Specifying predesigned, preconfigured switchgear/ATS solutions can lead to the following benefits: A. Reduce Lead Time B. Reduce Engineering Work C. Increase Overall Cost D. Answers A & B 40
Slide 41: Design Considerations (Monitoring)
Design Considerations (Monitoring) • Remote monitoring can provide valuable benefits to the power system. Monitoring the system will enable the operator to check the health and functionality of the system. This can provide a significant benefit for operators such as service response time and reducin
Slide 42: Design Considerations (Service)
Design Considerations (Service) Confirm that the selected generator, ATS, and switchgear supplier can provide necessary service support. This includes: • Service capability and distance from the service location to the equipment. • Number of factory-trained technicians. • Local, on-hand, parts inven
Slide 43: Installation Examples
Installation Examples 43
Slide 44: Example: Water Treatment Plant, Oklahoma, USA
Example: Water Treatment Plant, Oklahoma, USA The Broken Arrow Water Treatment Plant has a rated capacity of 20 million gallons to support most of the population of Broken Arrow, a major Tulsa suburb. The backup power system includes three 2 MW medium- voltage generator sets along with a DMC paralle
Slide 45: Example: Sewage Lift Station, Washington, USA
Example: Sewage Lift Station, Washington, USA 45
Slide 46: Course Summary
Course Summary Important Spec Notes: Course Objectives: • Motor starting capability should be carefully considered when selecting • Understanding the criticality of a generator supplier. providing reliable backup power • A Standby rating should be specified if a generator set is only utilized for em
Slide 47: Q&A
Q&A Please type your questions, comments and feedback in the Zoom Q&A window. After the PowerHour, a complete list of questions and answers will be published on powersuite.cummins.com. Cummins Facilitator: Cummins Panelist: Cummins Panelist: John Chen Brian Pumphrey Earnest Glaser Technical Marketin
Slide 48: Closing
Closing Please complete the brief survey before exiting the webinar! Watch out for a follow-up email including: Upcoming PowerHour Webinars: A link to the webinar recording and copy of the presentation February: Specifying Gaseous Generator A certificate issuing one professional development hour