Coelacanth Energy, Inc. · TSXV:CEI

Coelacanth Energy — Investor Presentation (August 2025)

19 slides from Coelacanth Energy's investor presentation, Aug 6, 2025

  1. Slide 1: Corporate Presentation

    CORPORATE PRESENTATION AUG 6, 2025 TSXV:CEI

  2. Slide 2: Corporate Snapshot

    CORPORATE SNAPSHOT A pure play Montney investment opportunity with a proven management team. Corporate Information Two Rivers region TSXV Trading Symbol CEI of NEBC (over 150 sections of Shares Outstanding Basic 532 million contiguous land in Montney light oil window) Shares Outstanding FD 592 milli

  3. Slide 3: CEI Montney Investment Thesis

    CEI MONTNEY INVESTMENT THESIS PREMIUM ASSET BASE MANAGEMENT • Over 150 contiguous Montney sections • Six successful prior entities • Multiple potential development zones • Added value through diverse economic • Located in light oil window conditions over many years • Accessible surface lands near Fo

  4. Slide 4: Montney Growth & Resource Value Strategy

    MONTNEY GROWTH & RESOURCE VALUE STRATEGY Two-fold strategy will allow shareholders to participate in both short-term increase in cash flow and long-term increase in resource value. Continued Pad Two Rivers East battery Development and pipelines completed. Two Rivers East Pad on Production Two Rivers

  5. Slide 5: Coelacanth - Small Fish?

    COELACANTH - SMALL FISH? At $436 million market cap, CEI is one of the smallest Montney players in the British Columbia pond BUT:  Top 10 in Montney landholdings  #1 landholder in the light oil window Halfway River FN  Building blocks in place to start aggressive growth profile Fort St. John Tayl

  6. Slide 6: Two Rivers Asset Advantage

    TWO RIVERS ASSET ADVANTAGE Status Next Steps Sales Pipeline 10-08 Pad Productivity & Further Upper commerciality 30m Project 16-03 delineation Battery Montney proven Facility Emulsion Future potential, Obtain cores and Middle assess future Line no current wells 130m Montney drilling tested 325m 05-1

  7. Slide 7: Multiple Markets & Takeaway

    MULTIPLE MARKETS & TAKEAWAY • Secured long-term gas takeaway of 100 mmcf/d • Up to 60 mmcf/d of long-term gas processing secured at third party plant Commodity Split Coelacanth Oil & Condensate 33% Natural Gas 67% Chicago (Alliance) Prince George / Edmonton (Trucked to Terminal) AECO / DAWN (NGTL) G

  8. Slide 8: Natural Gas Egress

    NATURAL GAS EGRESS • CEI can flow direct into Westcoast & Alliance • CEI can also connect into NGTL & eventually Coastal Gaslink NRM Gathering Line to McMahon Plant NRM McMahon Plant, STN 1 Alliance Westcoast NGTL STN 2 To AECO and TCPL Mainline Coastal Gaslink to LNG Canada To LNG Canada 8 8

  9. Slide 9: Two Rivers Montney Project – Status Report

    TWO RIVERS MONTNEY PROJECT – STATUS REPORT Where are we now? Completed In Process • Land secured (150 sections acquired) • Geological delineation (initial mapping and coring) • Proof of commerciality o Two Rivers East Pad tested o Two Rivers West Pad tested and on-stream • Infrastructure financing s

  10. Slide 10: Compelling Test Results for 5-19 Pad

    COMPELLING TEST RESULTS FOR 5-19 PAD Lower Montney Upper Montney Notes: (1) 5-19 Montney Pad tested a total of 11,000 boepd @ 60% oil. (See Advisories for “Test Results and Initial Production Rates”.) 10

  11. Slide 11: Management Historical Returns Versus Index

    MANAGEMENT HISTORICAL RETURNS VERSUS INDEX Management has built and sold 6 prior entities. Graph below illustrates $1 dollar invested in Company #1 and the proceeds re-invested sequentially through Company #6*. The STENRS Index that includes Canadian large producers has also been illustrated for com

  12. Slide 12: Accelerated Growth with ESG Advantage

    ACCELERATED GROWTH WITH ESG ADVANTAGE Environment • New pad projects and infrastructure are ‘greenfield’ and built with ESG principles (use of instrument air, no retrofits needed) • Reduced surface footprint through use of multi-well pads • Reduced drilling and completions emissions through use of d

  13. Slide 13: Board of Directors

    BOARD OF DIRECTORS Board Member Principal Occupation President and a Director of GMT Exploration Company LLC ("GMT Exploration”). Prior thereto, Mr. Lancaster held position of Vice President Exploration William Lancaster, P. Geol. and Production at GMT Exploration. Mr. Lancaster is a former presiden

  14. Slide 14: Management Team

    MANAGEMENT TEAM MANAGEMENT TEAM EMPLOYMENT HISTORY Robert J. Zakresky, CA, Former President & CEO of Leucrotta Exploration Inc., Crocotta Energy Inc., Chamaelo Exploration Ltd., Chamaelo Energy Inc., Viracocha Energy Inc., President & CEO & Bellator Exploration Inc. Bret Kimpton, P. Eng., Former Vic

  15. Slide 15: Corporate Information

    CORPORATE INFORMATION Corporate Analyst Contact Info Service Coverage Providers Institution: Analyst Address Auditors • Acumen Capital: • 2110, 530-8th Avenue • KPMG LLP Trevor Reynolds SW Legal Calgary, AB T2P 3S8 • Gowling WLG (Canada) • ATB Capital Markets: Telephone: (403) 705- LLP Amir Arif 452

  16. Slide 16: Advisories

    ADVISORIES Forward Looking Information This document contains forward-looking statements and forward-looking information within the meaning of applicable securities laws. The use of any of the words “expect”, “anticipate”, “continue”, “estimate”, “may”, “will”, “should”, “believe”, “intends”, “forec

  17. Slide 17: Advisories, Cont'd

    ADVISORIES, CONT’D This production growth profile specifically contains expectations and assumptions relating to prevailing commodity prices and exchange rates, applicable royalty rates and tax laws, future well production rates, the success of drilling new wells, the availability of capital to unde

  18. Slide 18: Advisories, Cont'd

    ADVISORIES, CONT’D TEST RESULTS AND INITIAL PRODUCTION RATES, CONT’D The E5-19 Lower Montney well was production tested for 11.4 days and produced at an average rate of 312 bbl/d oil and 890 mcf/d gas (net of load fluid and energizing fluid) over that period which includes the initial cleanup where

  19. Slide 19: Thank you

    ESN Ag Thank you

Coelacanth Energy — Investor Presentation (August 2025) on 6ix