Encounter Resources Limited · ASX:ENR

Encounter Resources — RIU Sydney Resources Round Up 2014

17 slides from Encounter Resources's conference presentation, May 13, 2014

  1. Slide 1: RIU Sydney Resources Round Up

    For personal use only RIU Sydney Resources Round Up 13 May 2014 ASX : ENR

  2. Slide 2: Investment Summary

    INVESTMENT SUMMARY Greenfields Copper Discovery - BM7 For personal use only • Large scale Cu system >14km long and growing Yeneena • $20m farm-in with Antofagasta plc (2 tenements) Project • Key ground position secured (>1800km2) High Grade Zinc Sulphides - BM2 • Zinc/silver in first diamond hole in

  3. Slide 3: Corporate Information

    CORPORATE INFORMATION Board Experienced team - former WMC For personal use only Paul Chapman - Chairman Will Robinson - Managing Director Peter Bewick - Exploration Director Jon Hronsky - Non-Executive Director Kevin Hart / Dan Travers - Company Sec. 132.5m Ordinary Shares Issued Capital 9.7m Employ

  4. Slide 4: Yeneena Project

    YENEENA PROJECT Major land position amongst giant mineral deposits For personal use only 4

  5. Slide 5: Historical Discoveries

    HISTORICAL DISCOVERIES Telfer – 1972 For personal use only Nifty - 1980 Kintyre - 1985 5

  6. Slide 6: Yeneena Project: Under cover exploration

    YENEENA PROJECT For personal use only Under cover exploration– a new search space 6

  7. Slide 7: Why the Paterson?

    WHY THE PATERSON? 25 Sediment Hosted Copper - Giant Orebodies For personal use only Central Africa Copper Deposits Paterson Mt Isa 20 Province Endowment Endowment MT Cu (pre mined resources) 170MT Copper 2.3MT Copper 15 Is Nifty the giant of the Paterson? 10 5 *includes basement hosted deposits 0 7

  8. Slide 8: BM1 - BM7 Prospects

    BM1 - BM7 PROSPECTS Copper mineral system 14km long and growing For personal use only BM1 Coherent zone of near surface Long Section copper oxide mineralisation (next slide) 10m @ 6.8% Cu from 32m 8m @ 3.6% Cu from 18m 20m @ 2.0% Cu from 22m BM7 6 x 3km copper system still growing First joint diamon

  9. Slide 9: Long Section BM1-BM7

    LONG SECTION BM1-BM7 Shallow drilling defines major new Copper-Cobalt mineral system For personal use only Next slide (refer ASX announcement 27 Nov 2013) 9

  10. Slide 10: BM7 Copper Footprint

    BM7 COPPER FOOTPRINT • Tenement granted in August 2012 For personal use only • Attracted quality partner - copper major Antofagasta plc • Shallow drilling outlined 6km x 3km copper system • System remains open to the south and south east 600m Nifty Sulphide Deposit • First joint diamond drilling int

  11. Slide 11: Regional Targets - Anto. JV

    REGIONAL TARGETS – ANTO. JV • Antofagasta earn-in regional targets For personal use only adjacent to BM1-BM7 copper system • Untested parallel target 1.5km west of BM1-BM7 copper trend • Structural targets identified west and north west at BM9 & BM10 • First aircore drill testing scheduled to commen

  12. Slide 12: Fishhook Prospect

    FISHHOOK PROSPECT Electromagnetics - VTEM Untested targets north of BM1-BM7 For personal use only • VTEM survey completed June 2013 2m @ 0.3% Cu from 72m • Significant north-east trending structure that mirrors the BM1-BM7 copper system • Shallow sand cover with minimal previous exploration • 10 hol

  13. Slide 13: BM2 / Millennium - Zinc Prospect

    BM2 / MILLENNIUM – ZINC PROSPECT Major land position amongst giant mineral deposits For personal use only Next slide 13

  14. Slide 14: BM2/Millennium Zinc Prospect

    BM2/MILLENNIUM ZINC PROSPECT Large Scale Zinc Mineral System For personal use only • High grade zinc/silver intersected in the first diamond hole into key geological contact • 0.7m @ 36.5% zinc and 37g/t silver • Zinc regolith anomalism along this target contact extends over 2km • Upcoming drilling

  15. Slide 15: Active Program Ahead

    ACTIVE PROGRAM AHEAD For personal use only 2014 May Jun Jul Aug Sep Oct Nov BM7 Cu (Anto earn-in) Diamond drilling Aircore/RC Fishhook (100% ENR) Aircore RC/Diamond (EIS) Stirling (ENR earn-in) Aircore RC/Diamond (EIS) BM2 / Millennium Zn RC/Diamond drilling 15

  16. Slide 16: Summary

    SUMMARY Yeneena – Australia’s Next Great Mineral District? For personal use only • Large scale Cu system over 14km long and growing • Massive zinc sulphides at 100% owned BM2 • Key ground position secured (>1800km2) • Major mining company funding through Antofagasta farm-in • Well funded & highly ac

  17. Slide 17: Disclaimer & Compliance Statement

    Disclaimer & Compliance Statement For personal use only This presentation has been prepared by Encounter Resources Limited (“Encounter”). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information in this document has been derived fr

Encounter Resources — RIU Sydney Resources Round Up 2014 on 6ix