Essar Shipping Limited. · NSE:ESSARSHPNG

Essar Shipping — Essar Oil — Q2 FY2012 Earnings Presentation

42 slides from Essar Shipping's earnings presentation, Nov 1, 2011

  1. Slide 1: Essar Oil Limited Analyst Presentation

    Slide 1: Essar Oil Limited Analyst Presentation

    Essar Oil Limited Analyst Presentation Results for quarter ended 30th Sept,2011

  2. Slide 2: Agenda of Presentation

    Slide 2: Agenda of Presentation

    Agenda of Presentation Performance Snapshot Industry Overview & Market Outlook Operations Projects Financials 1

  3. Slide 3: Performance Snapshot

    Slide 3: Performance Snapshot

    d ESSAR’ OIL & GAS Performance Snapshot

  4. Slide 4: H1 FY2012 Performance Highlights

    Slide 4: H1 FY2012 Performance Highlights

    H1 FY2012 Performance Highlights 1 Strong operating performance of refinery with capacity utilization above 130%, throughput 6.65 mmt 2 Revenue at Rs 30283 crore; up by 24% & EBIDTA at Rs 1172 crore; up by 12% as compared to Sales of Rs 24464 crore & EBIDTA of Rs 1041 crore for H1 FY2010 3 Current P

  5. Slide 5: Industry Overview & Market Outlook

    Slide 5: Industry Overview & Market Outlook

    Industry Overview & Market Outlook 4

  6. Slide 6: Global Oil Demand

    Slide 6: Global Oil Demand

    Global Oil Demand Million barrels per day 92 91 90.70 90 89.28 89 88.23 88 87 86.31 86.06 86 85.17 85 84.75 84 83 82 81 2006 2007 2008 2009 2010 2011 2012 Expected Expected 2010 annual oil demand has grown by 3.06 mops - one of the highest in history 2011 & 2012 oil demand growth is estimated to be

  7. Slide 7: Refinery Capacity Utilization

    Slide 7: Refinery Capacity Utilization

    Refinery Capacity Utilization EURO-16 US Singapore EOL 150% 140% 130% 120% 110% 100% 90% 80% 70% 60% Jan-11 Feb-11 Mar-11 Apr-11 11 May-11 Jun-11 Jul-11 Aug-11 6

  8. Slide 8: Market Dynamics

    Slide 8: Market Dynamics

    Market Dynamics Widening the Gap between Crude Price ($/bbl) Difference between Light &Heavy Crude ($/bbl) WTI Brent Dubai Arab Heavy & Arab Light 125 6.00 123 120 5.65 115 114 114 5.50 5.10 117 113 115 116 110 110 108 108 5.00 4.50 104 109 110 106 105 4.50 4.35 105 110 4.50 101 4.10 4.05 100 97 100

  9. Slide 9: Cracks Outlook

    Slide 9: Cracks Outlook

    Cracks Outlook Gasoil FO Jet Gasoline USD /bbl $25 20.33 20.36 19.68 18.75 19.16 19.66 $20 18.56 14.26 19.43 17.60 $15 12.86 18.40 16.56 16.95 17.29 11.76 16.36 14.64 12.39 13.04 $10 12.45 11.34 11.66 10.48 10.4 9.76 8.69 8.73 7.40 $5 6.71 $0 (3.65) (4.81) (5.56) (4.17) (4.37) (4.99) -$5 (6.69) (8.2

  10. Slide 10: Operations

    Slide 10: Operations

    d ESSAR’ OIL & GAS Operations

  11. Slide 11: Vadinar Refinery

    Slide 11: Vadinar Refinery

    d ny ae . . ESSAR Vadinar Refinery OIL & GAS oe

  12. Slide 12: Operating Performance – Refinery

    Slide 12: Operating Performance – Refinery

    Operating Performance – Refinery Crude Throughput Crude Mix Light Heavy & Ultra heavy 16 14.76 100% 14 90% 30% 25% 80% 36% 35% 35% Million Tonnes 12 70% 10 60% 8 7.37 6.65 50% 6 40% 75% 30% 64% 65% 65% 70% 3.69 4 3.03 20% 2 10% - 0% Q2 FY11 H1 FY11 FY11 H1 FY12 Q2 FY12 Q2 FY11 H1 FY11 FY11 H1 FY12 Q

  13. Slide 13: Operating Performance - Refinery: Product Mix

    Slide 13: Operating Performance - Refinery: Product Mix

    Operating Performance - Refinery Product Mix Light Middle Heavy 100% 26% 28% 27% 29% 29% 80% 60% 47% 46% 46% 44% 43% 40% 20% 27% 26% 27% 27% 28% 0% Q2 FY11 H1 FY11 FY11 H1 FY12 Q2 FY12 Optimised production of middle & light distillates – High margin segment 12

  14. Slide 14: Operating Performance - Refinery: Sales Mix

    Slide 14: Operating Performance - Refinery: Sales Mix

    Operating Performance - Refinery Sales Mix Bulk PSUs Exports Retail 70% 6% 7% 5% 2% 60% 4% 6% 6% 5% 3% 58% 59% 57% 56% 4% 50% 51% 40% 30% 20% 42% 37% 31% 29% 32% 10% 0% Q2 FY12 Q2 FY11 H1 FY11 FY11 H1 FY12 Continue to focus on domestic market due to better price realization of petro products; around

  15. Slide 15: Retail

    Slide 15: Retail

    Retail Deregulation of Gasoline, resulted into ramp up retail sales volumes. Retail sales increased by more than 125%, 125 mainly Gasoline, due to revision of prices inline with international prices. Network expansion will be pursued in a controlled manner until such time that a sustainable pricing

  16. Slide 16: Projects

    Slide 16: Projects

    d ESSAR’ OIL & GAS Projects 15

  17. Slide 17: Refining Expansion - Phase I

    Slide 17: Refining Expansion - Phase I

    Refining Expansion - Phase I Expansion to 18 MMTPA Complexity to improve to 11.8 from 6.1 Most of Units & Facilities under Expansion Project achieved mechanical completion. Mechanical completion of DCU, VGOHT, SRU expected in next 6-8 weeks by end of Dec, 2011 Revamp of CDU to 18 mmtpa, FCCU to 3.9

  18. Slide 18: Accomplishment of Planned Shut Down

    Slide 18: Accomplishment of Planned Shut Down

    Accomplishment of Planned Shut Down 35 days planned Shut down successfully completed on 23rd Oct, 2011. Tie - ins of Train - I new units & facilities with existing refinery : ISOM, HMU, DHDT, ARU, VGO- HT, SRU , DCU, SWS, Sulphur blocks & all OSBL/offsite tankages facilities Revamp of exising units

  19. Slide 19: Refinery Expansion Project: Units Mech. Completed

    Slide 19: Refinery Expansion Project: Units Mech. Completed

    Refinery Expansion Project : Units Mech. Completed ISOM Unit (Isomerization Unit) 18

  20. Slide 20: Diesel Hydrotreater

    Slide 20: Diesel Hydrotreater

    Refinery Expansion Project : Units Mech. Completed (DHDT) Diesel Hydrotreater 19

  21. Slide 21: Hydrogen Manufacturing Unit

    Slide 21: Hydrogen Manufacturing Unit

    Refinery Expansion Project : Units Mech. Completed Hydrogen Manufacturing Unit 20

  22. Slide 22: Refinery Expansion Project: Units Mech. Completed

    Slide 22: Refinery Expansion Project: Units Mech. Completed

    Refinery Expansion Project : Units Mech. Completed Amine Regenerations Units (ARU) 21

  23. Slide 23: Revamp of Units

    Slide 23: Revamp of Units

    Revamp of Units CDU Crude Column VDU Vacuum column 22

  24. Slide 24: Refinery Expansion Project: Facilities Mech. Completed

    Slide 24: Refinery Expansion Project: Facilities Mech. Completed

    Refinery Expansion Project : Facilities Mech. Completed Flare Drum Area Flare Racks Cooling Tower – I Cooling Tower - II 23

  25. Slide 25: Demineralisation Plant

    Slide 25: Demineralisation Plant

    Refinery Expansion Project : Facilities Mech. Completed Demineralisation Plant Caustic System Pumps & Tanks 24

  26. Slide 26: Raw Water Treatment Plant Air Generation Unit

    Slide 26: Raw Water Treatment Plant Air Generation Unit

    Refinery Expansion Project : Facilities Mech. Completed Air Generation Unit Raw Water Treatment Plant 25

  27. Slide 27: Refinery Expansion Project: Facilities Mech. Completed

    Slide 27: Refinery Expansion Project: Facilities Mech. Completed

    Refinery Expansion Project : Facilities Mech. Completed Sour Water Stripper OSBL Pipe Rack Natural Gas Station Desalination Plant Natural Gas Station 26

  28. Slide 28: Refining Optimization Project

    Slide 28: Refining Optimization Project

    Refining Optimization Project Expansion to 20 MMTPA Delayed Coker Unit – Six Coker Drums (Project Cost : Rs 1700 crore) Overall progress : 63.73% Engineering : 94.42% Procurement : 71.47% Construction : 44.4% Optimization Project is on schedule & expected to complete by Sept, 2012 New Units/ Facilit

  29. Slide 29: Exploration & Production

    Slide 29: Exploration & Production

    d ESSAR’ OIL & GAS Exploration & Production 28

  30. Slide 30: Project Progress at Raniganj

    Slide 30: Project Progress at Raniganj

    Project Progress at Raniganj Supply of Gas to end customers through pipeline started. Current Production @ 22000 scmd. Received Environmental Clearance for Phase – I of Raniganj Project . Field Development Plan for drilling of 500 wells approved by DGH. Gas Sales Price of $ 5.25/mmbtu + $1.00/mmbtu

  31. Slide 31: Leading CBM Gas Player in India

    Slide 31: Leading CBM Gas Player in India

    Leading CBM Gas Player in India Best estimate Unrisked in- 2P/ 2C prospective place Total Details of CBM Block Place Ownership Acreage resources Remarks resources resource Bcf Bcf Bcf Bcf Raniganj (CBM) West Bengal 100% 500 Sq km 201 792 - 993 CPR by NSAI (2010) Rajmahal (CBM) Jharkhand 100% 1128 sq

  32. Slide 32: Financials

    Slide 32: Financials

    d ESSAR’ OIL & GAS Financials 31

  33. Slide 33: Financial Highlights - H1 FY12

    Slide 33: Financial Highlights - H1 FY12

    Financial Highlights - H1 FY12 ( Rs in Crore) Net Worth excludes FCCBs of $ 262 million issued to EEPLC; (Rs 1282 crore for H1FY12 & Rs. 1177 crore for H1 FY11) 32

  34. Slide 34: Financial Results

    Slide 34: Financial Results

    Financial Results Rs in Crore 33

  35. Slide 35: Summary

    Slide 35: Summary

    Summary Vadinar Refinery to become one of the most complex refinery in the global market. Expansion to create flexibility in Refinery to process any variety of sour / tough / acidic crude available in global market thus reduce the overall cost of crude. Expansion to produce EURO IV &V grade of Gasoi

  36. Slide 36: Thank You

    Slide 36: Thank You

    d ESSAR’ OIL & GAS Thank Yow

  37. Slide 37: Major Units and Licensors

    Slide 37: Major Units and Licensors

    Major Units and Licensors CAPACITY CAPACITY LICENCER / DETAILED UNIT / FACILITY (MMTPA) Post OPTIMISATION TECHNOLOGY ENGG 10.5 (CDU) 18 (CDU) CDU / VDU 7.2 (VDU) 10.9 (VDU) VISBREAKER (VBU) 1.9 2.0 (CDU) NAPHTHA HYDROTREATER (NHT) 1.6 1.8 CONTINUOUS CATALYTIC REFORMER UNIT 0.9 1.1 (CCR) FLUID CATALY

  38. Slide 38: Product yield

    Slide 38: Product yield

    Expansion to provide crude as well as product flexibility 14 MMTPA 18 MMTPA 20 MMTPA Light Light Ultra- Light 11% 13% heavy 20% 28% Crude mix Heavy 25% Ultra- Heavy Ultra- Heavy 64% Heavy 52% 87% 14MT 18MT 20MT (current) (expected post phase 1 expansion) (expected post optimisation) Fuel loss Fuel l

  39. Slide 39: Yield to shift to higher grade products optimal for export markets

    Slide 39: Yield to shift to higher grade products optimal for export markets

    Yield to shift to higher grade products optimal for export markets Conversion of entire negative margin fuel oil into high value added products and pet coke Building higher flexibility between light and middle distillates Flexibility to produce petrochemical feed stock Euro IV & V grade at 55% in Ga

  40. Slide 40: Essar Oil – Refining

    Slide 40: Essar Oil – Refining

    Essar Oil – Refining Increasing capacity and complexity Key highlights Low cost, safe and efficient operations – refinery operating Capacity (MMTPA) 1 cost US$1-2 per barrel lower than global peers 38 20 2 Strategically located on the west coast of India 18 14 Increasing complexity from 6.1 to 11.8

  41. Slide 41: Details of Major E&P blocks with reserves and resource estimates

    Slide 41: Details of Major E&P blocks with reserves and resource estimates

    Details of Major E&P blocks with reserves and resource estimates Best estimate prospective Peak 2P/ 2C resources Opex Comments resources Prodn. Assets Ownership Oil Gas Total Oil Gas Total (US$ mn) mmbbl Bcf mmboe mmbbl Bcf mmboe $0.43/ Test production commenced. Raniganj (CBM) 100% 201 33 - 792 132

  42. Slide 42: Essar Global: one of India's largest industrial houses

    Slide 42: Essar Global: one of India's largest industrial houses

    Essar Global: one of India’s largest industrial houses Essar Group Energy Infrastructure Steel Shipping Services Oil & Gas Power Ports Projects Upstream Raw Material Raw Material Shipping BPO Operational Essar Projects India 2,132 MMBOE 450 MT coal 2 billion tonnes of 24 ships. 12 new 50,000+ employ

Source: Internet Archive copy of essar.com

More decks from Essar Shipping Limited.

All 48 Essar Shipping decks