Slide 1: BW Offshore Q4 2011 presentation
BW Offshore Q4 2011 presentation 14 February 2012

Slide 2: Disclaimer
Disclaimer This Presentation has been produced by BW Offshore Limited ( “BW Offshore”) exclusively for information purposes. This presentation may not be redistributed, in whole or in part, to any other person. This document contains certain forward-looking statements relating to the business, finan

Slide 3: Highlights
Highlights Q4 2011 EBITDA of USD 72.8 million Ningaloo Vision sold to Apache in January 2012 Construction completed on BW Athena and BW Joko Tole − Final phase of commissioning before sail-away EPC project P-63/Papa Terra under completion in China until planned departure end of Q2 2012 Dividend of U

Slide 4: Status
STATUS

Slide 5: Operations
Operations Fleet uptime Production uptime 100.0% − Q4 2011 uptime of 98.9% 98.0% 96.0% − 5 year average uptime is 98.4% 94.0% 92.0% 90.0% Excellent HSSEQ performance 88.0% 86.0% − Lost time injuries (LTI) < 1.0 84.0% 82.0% BW Pioneer on stand-by dayrate 80.0% 2005 2006 2007 2008 2009 2010 2011 Conti

Slide 6: Fleet overview
Fleet overview U nit T yp e C o nt r act 2009 2 0 10 2 0 11 2 0 12 2 0 13 2 0 14 2 0 15 2 0 16 2 0 17 2 0 18 2 0 19 2020 2021 2022 2023 2024 2025 Sendje Berge FPSO Lease Addax/Sinopec, Nigeria: 2005-2013 Berge Helene FPSO Lease Petronas, M auritania: 2006-2013 (2021) Yùum K'ak'Náab FPSO Lease Pemex,

Slide 7: Ningaloo Vision
Ningaloo Vision FPSO Ningaloo Vision sold to Apache* in January 2012 Price of USD 185 million on an “as is where is” basis Extensive offshore repair work during 2011 due to technical problems from the conversion BW Offshore will operate the FPSO for a period of up to 9 months on a cost-plus-basis *

Slide 8: FPSOs under construction – I
FPSOs under construction – I BW Athena at Drydocks World, Dubai − Construction completed − Finalising minor punch list items − Commissioning work ongoing − Preparing for sail-away 14 February 2012 8

Slide 9: FPSOs under construction - II
FPSOs under construction - II BW Joko Tole at Sembawang Shipyard, Singapore − Construction completed − Finalising minor punch list items − Commissioning work ongoing − Preparing for sail-away − Mobilising for final installation campaign − Ready for operation Q2 2012 14 February 2012 9

Slide 10: EPC project
EPC project P-63/Papa Terra at COSCO Dalian Shipyard, China − Progress ~90% at end January − 7 million man hours completed without LTI − Extended yard stay to facilitate integration of QUIP topside modules − Planned sail-away Q2 2012 14 February 2012 10

Slide 11: Finance
FINANCE

Slide 12: Key takeaways
Key takeaways Purchase price allocation (PPA) finalised APL sale finalised Ningaloo Vision sold Impairment of USD 138.5 million (non-cash) 14 February 2012 12

Slide 13: P&L
P&L USD million Q4 11 Q3 11 Q4 10 2011 2010 Operating revenue 208.1 216.1 255.8 846.2 549.3 Operating expenses -135.5 -138.9 -216.9 -534.0 -382.2 Share of profit from associates 0.2 -0.5 0.0 -0.3 -14.8 EBITDA 72.8 76.7 38.9 311.9 152.3 Depreciation -46.8 -46.3 -47.2 -178.6 -86.0 Amortisations -1.6 -

Slide 14: Balance sheet
Balance sheet Equity ratio 32.4 % Net interest bearing debt USD 1,702.4 million USD million 31.12.11 30.09.11 31.12.10 Total non-current assets 3 009.6 3 359.0 3 274.8 Assets of disposal group held for sale 185.0 7.1 7.1 Total current assets 607.0 376.8 393.5 Total assets 3 616.6 3 735.8 3 667.3 Tot

Slide 15: Secure cashflow
Secure cashflow Run rate EBITDA of existing contracts is USD 465 million Long term contracted cash flow with strong counterparties − Order book of USD 7.1 billion in revenue Average contract length is 10 years including options (firm 5 years) Financial resources available for new FPSO/FSO projects t

Slide 16: Funding and dividends
Funding and dividends Available funds under existing facilities for projects and fleet extensions Targeting USD 250-275 million project finance facility for BW Joko Tole Balance growth and quarterly dividend distribution − Dividend policy of 20-25% of EBITDA − Q4 2011 dividend of USD 0.02 per share

Slide 17: Investments in fixed assets
Investments in fixed assets Development of project returns − BW Joko Tole capex in line with plan − BW Athena capex above plan Additional investment supported by positive development in the North Sea Total 2011 investments in assets of ~ USD 400 million − Includes ~ USD 125 million in extraordinary

Slide 18: Outlook
OUTLOOK

Slide 19: Selected opportunities next 12 months
Selected opportunities next 12 months Project Name Operator Country Indicated award Western Isles FPSO Dana UK-North Sea Q2 2012 Campos FSO BG Brazil Q2 2012 Fram FPSO Shell UK-North Sea Q3 2012 Kudu FPU Tullow Namibia Q3 2012 T.E.N. FPSO Tullow Ghana Q3 2012 Madura FPSO CNOOC/Husky Indonesia Q4 201

Slide 20: From “cottage industry” to large scale development solutions
From “cottage industry” to large scale development solutions Sendje Berge (2005) BW Pioneer (2011) − Benign water − Hurricanes − Spread moored − Turret moored − Simple topside − Quick disconnect − 140 m water depth − Fluid swivel − 2,500 m water depth Investment x 6 14 February 2012 20

Slide 21: The cost challenge
The cost challenge Upstream Capital Cost Index Upstream Operating Cost Index 250 250 225 225 200 200 175 175 150 150 125 125 100 100 75 75 50 50 Source: IHS CERA / BW Offshore 14 February 2012 21

Slide 22: The long term return solution - I
The long term return solution - I FPSO companies have taken too much risk – and costs − Construction − Operation Strengthen commercial focus in all phases of asset ownership − Business development − Project − Operation − Redeployment Pursue projects with balanced contractual terms − Improve contract

Slide 23: The long term return solution - II
The long term return solution - II Strengthening project execution − Standardise engineering and execution − Improve project control Operational improvement initiatives on all units − Benchmark operational performance − Improve procurement process − Improve contract management Capture administrative

Slide 24: Summary
Summary Completing two major projects and three start-ups in first half 2012 − Growing run rate EBITDA from USD 300 million to USD 465 million High market activity Strengthening project planning and execution capability Continue operational improvement processes on existing fleet and overhead 14 Feb

Slide 25: Q&A
Q&A

Slide 26: 14 February 2012
14 February 2012 26

Slide 27: Appendix
APPENDIX 14 February 2012 27

Slide 28: Units on contract – in operation
Units on contract – in operation Sendje Berge, FPSO Sinopec, Nigeria • 60,000 bpd oil processing • 55 mmscfd gas compression • 2,000,000 bbls storage • Spread mooring Yùum K’ak’Náab, FPSO Pemex, Mexico • 600,000 bpd oil handling • 200,000 bpd oil processing • 2,500,000 bbls storage • Disconnectable

Slide 29: Units on contract – in operation
Units on contract – in operation Belokamenka, FSO Sovkomflot, Russia • 2,400,000 bbls storage • Cargo heating system • Spread mooring BW Pioneer, FPSO Petrobras, US • 80,000 bpd oil processing • 25.6 mmscfd gas export • 600,000 bbls storage • Disconnectable turret mooring BW Cidade de São Vicente, F

Slide 30: Units on contract – in operation
Units on contract – in operation Ningaloo Vision, FPSO Apache, Australia • 63,000 bpd oil processing • Unit is sold • 80 mmscfd gas compression • BW Offshore to operate • 620,000 bbls storage unit for up to 9 months • Disconnectable turret Espoir Ivorien, FPSO CNR, Ivory Coast • 40,000 bpd oil proce

Slide 31: Units on contract – in operation
Units on contract – in operation Umuroa, FPSO AWE, New Zealand • 50,000 bpd oil processing • 25 mmscfd gas compression • 775,000 bbls storage • Turret mooring Abo, FPSO Agip, Nigeria • 44,000 bpd oil processing • 44 mmscfd gas compression • 930,000 bbls storage • Spread mooring Petróleo Nautipa, FPS

Slide 32: Units on contract – in operation
Units on contract – in operation Azurite, FDPSO Murphy, Congo • 40,000 bpd oil processing • 18 mmscfd gas compression • 1,400,000 bbls storage • Spread mooring Cidade de São Mateus, FPSO Petrobras, Brazil • 35,000 bpd oil processing • 353 mmscfd gas compression • 700,000 bbl storage Endeavor, FSO Ab

Slide 33: Units on contract - project
Units on contract - project OSX 1, FPSO - completed OSX, Brazil • 42,000 bpd liquid processing • 40,000 bpd oil processing • 60,000 pbd w ater injection • 53 mmscfd gas compression • 950,000 bbls storage • Turret mooring BW Joko Tole (TSB), FPSO Kangean Energy, Indonesia • 7,000 bpd fluids processin

Slide 34: Units on contract - project
Units on contract - project P-63/Papa Terra, FPSO Petrobras, Brazil • 2,200,000 bbls storage capacity • Ex BW Nisa (ULCC) 14 February 2012 34

Slide 35: Further information and IR contact
Further information: www.bwoffshore.com IR contact: Kristian Flaten, Vice President IR and Corporate Finance kristian.flaten[a]bwoffshore.com 14 February 2012 35
Source: Internet Archive copy of bwoffshore.com
More decks from BW Offshore Limited
Q2 2026 Earnings Presentation26 slides · Aug 24, 2026
Q1 2026 Earnings Presentation27 slides · May 18, 2026
Q4 2025 Earnings Presentation29 slides · Feb 27, 2026
Q4 2019 Earnings Presentation36 slides · Feb 27, 2026
Q2 2025 Earnings Presentation34 slides · Aug 28, 2025
Q1 2025 Earnings Presentation27 slides · Jun 2, 2025