Hindustan Construction Co. Ltd. · NSE:HCC

Hindustan Construction — Q2 FY26 Earnings Presentation

16 slides from Hindustan Construction's earnings presentation, Nov 6, 2025

  1. Slide 1: Exchange filing cover letter: Analyst/Institutional Investor Meeting Presentation

    HCC/SEC/AM/2025 November 6, 2025 BSE Limited National Stock Exchange of India Ltd. The Corporate Relationship Dept, Exchange Plaza, Phiroze Jeejeebhoy Towers, Bandra-Kurla Complex, Dalal Street, Sandra (East), Mumbai-400 001 Mumbai-400 051 Scrip Code : 500185 Symbol: HCC Dear Sir I Madam, Sub: Analy

  2. Slide 2: Investor/Analyst Presentation Q2 FY26

    Hindustan Construction Co Ltd Investor/Analyst Presentation Q2 FY26 1 November 6, 2025 Analyst Presentation – Q2 FY26 Results

  3. Slide 3: Nation building since 1926

    H 1:1:: Nation building since 1926 60o/o of India's installed 26o/o of India's installed nuclear power hydro power capacity capacity 2 November 6, 2025 Analyst Presentation – Q2 FY26 Results

  4. Slide 4: Diversified & robust orderbook

    Diversified & robust orderbook Order Backlog: ₹13,152 Cr Order Book Position (Business Line Wise) Order Book Position (Geographical) 2% 4% 12% 3% 9% 16% 6% 9% 19% 22% 63% 8% 27% Uttarakhand Bihar Transport Hydro Nuclear & Buildings Water Maharashtra Gujarat Manipur Tamil Nadu Madhya Pradesh Rajastha

  5. Slide 5: Key performance highlights: Q2 FY26

    Key performance highlights: Q2 FY26 • Standalone Turnover of ₹957.8 Cr in Q2 FY26 versus ₹1,203 Cr in Q2 FY25 • Standalone Net Profit of ₹36.7 Cr in Q2 FY26 versus ₹50.2 Cr in Q2 FY25 • Standalone EBITDA margins at 16.1% in Q2 FY26 compared to 17.8% in Q2 FY25 • Secured three orders, two packages of

  6. Slide 6: Key performance highlights: Q2 FY26 (contd.)

    Key performance highlights: Q2 FY26 (contd.) Operations update: – Mumbai Metro Line 3 (Pkg UGC02) inaugurated by PM Shri Narendra Modi on Oct 8, 2025 – Tehri PSP: Unit 7 synchronisation with Grid completed – Vishnugad Pipalkoti HEP: 7.5 km of TBM mining completed out of the 12.1 km – The Indore Metr

  7. Slide 7: Operations Update: Mumbai Metro Line 3

    Operations Update: Mumbai Metro Line 3 Inaugurated by Honourable Prime Minister Shri Narendra Modi on October 8, 2025 CST Station 6 November 6, 2025 Analyst Presentation – Q2 FY26 Results

  8. Slide 8: Operations Update: Mumbai Metro Line 3

    Operations Update: Mumbai Metro Line 3 Kalbadevi Station Girgaon Station Grant Road Station 7 November 6, 2025 Analyst Presentation – Q2 FY26 Results

  9. Slide 9: Operations Update: Tehri PSP (4x250 MW)

    Operations Update: Tehri PSP (4x250 MW) Powerhouse Overview Unit 7 Synchronization with Grid 8 November 6, 2025 Analyst Presentation – Q2 FY26 Results

  10. Slide 10: Operations Update: Vishnugad Pipalkoti HEP

    Operations Update: Vishnugad Pipalkoti HEP HRT by TBM Machine Hall Unit 1 Spiral Casing HRT by TBM: TBM mining 7.5 KM of Tunneling completed out of 12.1 KM by TBM 9 November 6, 2025 Analyst Presentation – Q2 FY26 Results

  11. Slide 11: Operations Update: Indore Metro

    Operations Update: Indore Metro Airport Station Rajwada Station Piling works are in progress at Airport, BSF Kalani Nagar and Rajwada stations. 10 November 6, 2025 Analyst Presentation – Q2 FY26 Results

  12. Slide 12: Operations Update: Bhivpuri PSP

    Operations Update: Bhivpuri PSP Upper Reservoir Intake Excavation Powerhouse Excavation Excavation works in Upper Reservoir, Lower Reservoir, Powerhouse and Penstock Fabrication works are in progress. 11 November 6, 2025 Analyst Presentation – Q2 FY26 Results

  13. Slide 13: Standalone Financials: Q2 FY26

    Standalone Financials: Q2 FY26 Results are in accordance with the Indian Accounting Standards (Ind AS) notified by the Ministry of Corporate Affairs Q2 FY26 Q2 FY25 y-o-y Q1 FY26 Particular ₹ Cr ₹ Cr % ₹ Cr Income from Operations 957.8 1,203.0 -20.4% 1,069.0 Other Income 17.7 23.0 -22.9% 20.7 Total

  14. Slide 14: Consolidated Financials: Q2 FY26

    Consolidated Financials: Q2 FY26 Results are in accordance with the Indian Accounting Standards (Ind AS) notified by the Ministry of Corporate Affairs Q2 FY26 Q2 FY25 y-o-y Q1 FY26 Particular ₹ Cr ₹ Cr % ₹ Cr Income from Operations 960.7 1,406.9 -31.7% 1,091.3 Other Income 22.5 25.6 -12.0% 27.3 Tota

  15. Slide 15: HCC

    HCC 14 November 6, 2025 Analyst Presentation – Q2 FY26 Results

  16. Slide 16: Disclaimer

    Disclaimer This presentation contains certain forward looking statements concerning future business prospects and profitability of HCC, which are subject to a number of risks and uncertainties and actual results could materially differ from those in such forward looking statements, important develop

Hindustan Construction Company — Q2 FY26 Earnings Presentation on 6ix