31 slides from Hydrogenics's earnings presentation, Mar 7, 2014

  1. Slide 1: Q4 2013 Investor Presentation

  2. Slide 2: Safe Harbor Statement

    Safe Harbor Statement Certain statements in the Business Update and Order Backlog sections contain forward-looking statements within the meaning of the “safe harbor’ provisions of the U.S. Private Securities Litigation Reform Act of 1995, and under applicable Canadian securities laws. These statemen

  3. Slide 3: 2013 Highlights — Delivering as Promised

    2013 Highlights — Delivering as Promised * Growth in revenue, margins & backlog — 2013 revenue up 34% at $42.4M — Gross margin of 28.4% for the year, versus 16.6% in 2012 - Backlog at $57 million as of December 31, 2013 — Major orders closed in 2013 are the result of management's strategic focus on

  4. Slide 4: OnSite Generation

    OnSite Generation Water Electrolyzers 2013 Revenue $24.1M; Mkt Size $100M 2013 $18.3M; Mkt Size $2B = = Industrial hydrogen jy Hydrogen fueling Energy Storage ad Control, Smart Grid and Remote Commu Mkt Size $10B+

  5. Slide 5: OnSite Generation: Industrial Electrolysis

    OnSite Generation: Industrial Electrolysis 65 years of technology leadership Application spectrum praia Steel Solar Silicone Power Plant Positioning +500 Megawatt Scale Top Performance Reference Sites 5 HYDROGE€)NICS SHIFT POWER | ENERGIZE YOUR WORLO

  6. Slide 6: Toyota, Honda, Daimler and Hyundai

    Toyota, Honda, Daimler and Hyundai launch mass production fuel cell vehicles 2015 — 2017 Hydrogenics has built 45 fueling stations 4 wins thus far in 2014 Stuttgart, Germany HYDROG@)NICS

  7. Slide 7: Power Systems: Backup Power

    Power Systems: Backup Power Cell Tower & Date Center Applications + Market estimated at $2B — viewed as largest fuel cell end market (>1% penetration of USA Market from all suppliers) + Developed five products across 2.4kW to 16kW power + Partner CommScope — $3B telecom company — First commercial or

  8. Slide 8: Power Systems: Propulsion

    Power Systems: Propulsion $90M Order Awarded September 2012 8 year history with confidential customer First prototype delivered in 2012 Customer has elected to commercialize Gen 2.0 of product $10M for exclusivity over 8 years $30M firm order commitment $90M total potential value over 10 years $10M

  9. Slide 9: Energy Storage

    Energy Storage * Saw opening of E.ON 2 MW Falkenhagen facility in 2013 — Serves as showcase for HYGS Power-to-Gas technology + First PEM 1 MW facility, also with E.ON, to open by mid-year 2014 in Hamburg, Germany * Largest PEM electrolysis installation producing hydrogen worldwide * Enbridge project

  10. Slide 10: Energy Storage Commercial Support Moves Ahead

    Energy Storage Commercial Support Moves Ahead Germany Annual Demand: 550 TWh 2012 RE Generation: 24% Renewable Target: 50% by 2030 Integration Challenge: + 33% curtailment of wind today + Major transmission constraints Energy Storage: +18 Power-to-Gas Demo Projects Building H2 Fueling Infrastructure

  11. Slide 11: Massive Seasonal Storage Capacity Already Exists

    Massive Seasonal Storage Capacity Already Exists Germany California Ontario + 35 Natural Gas Storage Sites +7.3 billion m3 capacity + 48 Natural Gas Storage Sites +12 Natural Gas Storage Sites 10% H2 = +20.4 billion m3 capacity +7. billion m3 capacity 8,100 GWh 10% H2 = 10% H2 = 22,500 GWh 8,300 GWh

  12. Slide 12: What if We Used the Entire Energy System to Address Challenges?

    What if We Used the Entire Energy System to Address Challenges? Energy Silos i ide Crt Transport Fuels — Natural Gas Source data: National Energy Board secondary energy demand forecast, Rethinking Enerey Conservation in Ontario, May 2010 report 12 HYDROG@)NICS

  13. Slide 13: Renewable Hydrogen Displaces Conventional Sources

    Renewable Hydrogen Displaces Conventional Sources A Solution With Meaningful Scale 40MW Power-to-Gas Plant Renewable Gas Options al foil a Clean Fuel Dispatchable Power Low Carbon Heating Industrial H2 Displaces 13 HYDROGE@)NICS SHIFT POWER | ENERGIZE YOUR WORLD

  14. Slide 14: Progress Being Made to Monetize Benefits

    Progress Being Made to Monetize Benefits P2G Benefit ISO Balancing Service Germany + No mechanism yet Market Californi + Yes. FERC 755 implemented Ontario + IESO’s initial 10 MW procurement will set stage Direct Injection and Seasonal Storage + Yes. Initial threshold is 2% Hydrogen + No rules in pla

  15. Slide 15: Scaling Revenue — Controlling Cost

    Scaling Revenue — Controlling Cost 50 40 30 20 | 10 “10 20 30% CAGR top ne —— profitability 1 mmmCash Operating Costs (excl R&D) mNNR&D mmm Adjusted EBITDA ==-Revenue * See slides 24 & 26 respectively for defintions of “Cash Operating Costs” and “EBITDA HYDROGE)NICS SHIFT POWER | ENERGIZE

  16. Slide 16: Firm & Contracted Backlog

    Firm & Contracted Backlog 140 5 124 120 - 17 100 + ae Remaining balance on S90M order 80 + (not yet firm) $M 64 60 mFX 60 ~ 36.9 42.4 40 5 lm OnSite Generation - Firm 20 4 o4 Opening Orders Orders Opening Backlog 2013 Received Delivered Backlog 2014 ‘s HYDROGE SHIFT POWER | ENERGIZE

  17. Slide 17: Growth Catalysts Continue

    Growth Catalysts Continue « Launch of NA energy storage project (Enbridge) * Increase in number and size of EU storage projects * Back-up power for data centre and cell tower sites ¢ Larger scale fuel cell power generation projects « New technology intensive integration programs ¢ Actual launch of f

  18. Slide 18: Prospects for 2014 & Beyond

    Prospects for 2014 & Beyond * Tracking to revenue, margin & EBITDA targets with a trajectory toward profitability * Strong bookings and backlog with more to come ¢ Market leadership position in Power-to- Gas now well recognized ¢ Balance sheet remains strong ¢ Technology platform for significant sca

  19. Slide 19: Q4 Revenue

    Q4 Revenue Three months ended December 31, 2013 Revenue Power Systems Donsite Generation 2012 2013 $M Revenue by Business Unit 7206.9 Onsite Generation 41 2012 m2012 Power Systems Revenues increased 12%, to $11.0 million, reflecting increased revenues in the Power Systems business unit driven by the

  20. Slide 20: 2013 Revenue

    2013 Revenue Twelve months ended December 31, 2013 Revenue Revenue by Business Unit 30 m=Powersystems 2012 2013 onsite 3 Generation 2012 2013 COnSiteGeneration Power Systems Revenues increased $10.7 million, or 34%, to $42.4 million reflecting increased revenues in the Power Systems business unit in

  21. Slide 21: Q4 Gross Profit

    Q4 Gross Profit Three months ended December 31, 2013 Gross Profit Gross Profit By Business Unit 45 44.6 40 36.5 ‘=Power Systems 25 20 17.6 = 20122013 ‘BDonsite Generation 2012 2013 OnSite Generation PowerSytems Gross profit was $2.7 million, or 24.6% of revenues, an increase of 11.1 percentage point

  22. Slide 22: 2013 Gross Profit

    2013 Gross Profit Twelve months ended December 31, 2013 Gross Profit Gross Profit By Business Unit % 30.0 xz 28.4 208 16.6 mPower Systems 10.0 'BOnsite Generation OnSite Generation Power Systems 00 2012 2013 Gross profit was $12.1 million of 28.4 of revenue, an increase of 11.8 percentage points pri

  23. Slide 23: Q4 Cash Operating Costs

    Q4 Cash Operating Costs Three months ended December 31, 2013 = RaD 2012 2013 Cash Operating Costs! were $2.9 million for the quarter, a decrease of 20% compared to the fourth quarter of 2012, primarily resulting from a $0.7 million decline in net research and development expenditures due to increase

  24. Slide 24: 2013 Cash Operating Costs

    2013 Cash Operating Costs Twelve months ended December 31, 2013 sm 153. we 135 15.0 ————» 10.0 REDE SGEA 50 108 109 0.0 2012 2013 Cash operating costs were $13.5 million a decrease of 12% with costs as a percent of revenue falling 16%. The year-over-year change primarily reflects an increase in R&D

  25. Slide 25: Q4 Results (in $ Millions)

    Q4 Results (in $ Millions) Three months ended December 31 Change 2013 2012 $ % Revenues $ 11.0 $ 9.8 1.2 12 Gross Profit 2.7 1.3 1.4 104 Percentage of revenues 24.6 13.5 Operating Expenses Selling, general and administrative (excluding stock-based compensation, amortization and depreciation) ad ar -

  26. Slide 26: 2013 Results (in $ Millions)

    2013 Results (in $ Millions) Twelve months ended December 31 Change 2013 2012 $ % Revenues $ 424° $ 31.7 10.7 34 Gross Profit 12.1 5.2 6.9 130 Percentage of revenues 28.4 16.6 Operating Expenses Selling, general and administrative (excluding stock-based compensation, amortization and depreciation) 1

  27. Slide 27: Order Backlog

    Order Backlog As at December 31, 2013 ($m) Sept. 30/13 Orders Orders Dec. 31/13 Backlog Received FX Delivered Backlog OnSite Generation $17.1 $ 12.2 $ 01 $ (6.9) $22.5 Power Systems 35.6 21 0.9 (4.1) 34.5 Total $ 52.7 $ 14.3 $ 1.0 $ (11.0) $57.0 27

  28. Slide 28: Consolidated Balance Sheet Highlights

    Consolidated Balance Sheet Highlights (sm) Cash and cash equivalents and restricted cash Trade, other and grants receivable Inventories Trade and other payables Warrants’ 1 Note: All outstanding warrants were exercised in January 2014 Dec. 30, Dec. 31, Change 2013 2012 $ % 13.8 16.8 (3.0) (18) 5.4 5

  29. Slide 29: Reconciliation of Non-IFRS Measures

    Reconciliation of Non-IFRS Measures Cash Operating Costs (sm) Three months ended Twelve months ended December 31, 2013 December 31, 2013 Cash operating costs $ 29 $ 13.5 Less: Gross profit (2.7) (12.1) Add: Stock based compensation 0.1 0.6 Add: Deferred compensation plans 2.0 4.2 indexed to share pr

  30. Slide 30: Reconciliation of Non-IFRS Measures

    Reconciliation of Non-IFRS Measures Adjusted EBITDA (sm) Three months ended December 31, 2013 Twelve months ended December 31, 2013 Adjusted EBITDA loss $ 0.2 $ 1.2 Add: Stock-based compensation 241 48 (cash settled and share settled) Add: Amortization and depreciation 0.2 08 Add: Finance (income) l

  31. Slide 31: FEADY

    FEADY HYDROGE)NICS ENERGIZE YOUR WORLD