Emp Metals Corp · CSE:EMPS
Emp Metals — Investor Presentation (September 2024)
19 slides from Emp Metals's investor presentation, September 2024
Slide 1: Primed to become a leading lithium producer in Saskatchewen
empmetals.com Primed to become a leading lithium CSE: EMPS | OTCQB: EMPPF producer in Saskatchewen
Slide 2: Forward-looking Statement
empmetals.com Forward-looking Statement This presentation contains “forward looking statements” within which may cause results to differ from those contained in the meaning of applicable Canadian securities legislation. forward-looking statements is included in filings by the Statements in this news
Slide 3: EMP Advantage
empmetals.com EMP Advantage 100% project ownership World-class technical team, Subsurface exploration and development experts Highest grade Lithium in Brine sample (259 mg/L) in Canada. Uniquely clean, DLE-amenable brines Saskatchewan 1st in Canada*, 3rd most attractive jurisdiction worldwide*. Stro
Slide 4: Strategic Relationships
empmetals.com Strategic Relationships Working with leading industry contributors and partners with expertise in DLE, brinefield extraction and refining. Private equity specialty fund 17.5% equity interest Worldwide leaders in the CExperts in water treatment Highly experienced resource 30-year track
Slide 5: The Saskatchewan Advantage
empmetals.com The Saskatchewan Advantage Duperow vs Leduc - Ideal Geology Regionally extensive reservoir with highly concentrated lithium brine. Significantly higher grades of lithium in Duperow vs. Leduc No H2S or residual oil Shallow drilling depth (1,800m) Lower CAPEX and OPEX CSE: EMPS | OTCQB:
Slide 6: EMP Lithium Brine Projects in Saskatchewan
empmetals.com EMP Lithium Brine Projects in Saskatchewan Initial NI-43 101 total project resource 1.2 MM tonnes at 143 mg/L 3 key project areas totaling 81,000ha (~200,000 acres) 90% Crown land, 10% freehold, actively growing landholdings via acquisition & auction Established infrastructure and comm
Slide 7: Viewfield Historical Oil and Gas Development
empmetals.com Viewfield Historical Oil and Gas Development CSE: EMPS | OTCQB: EMPPF
Slide 8: Mansur Project
empmetals.com Mansur Project 1-2 and 14-36 (Mansur #1 and #2) Well Results NI 43-101 Resource Assessment Swab-tested: 53 – 148 mg/L (6/7 zones) Inferred Resource: 399,364 t LCE Flow tested: 528 m3/d Weighted average [C] Li: 143.4 mg/L Net Pay: 79m Net hectares: 14,116 (54.5 sections) Effective Poros
Slide 9: Viewfield Project
empmetals.com Viewfield Project NI 43-101 Resource Assessment 2-22 and 4-23 (Viewfield #1 and #2) Well Results Inferred Resource: 747,526 t LCE Swab-tested: 56 – 259 mg/L (8/8 zones) Weighted average [C] Li: 143.4 mg/L Flow-tested: 600 m3/d @ 200 mg/L Li Net hectares: 11,072 (42.75 sections) Net Pay
Slide 10: Viewfield PEA - Development Plan
empmetals.com Viewfield PEA - Development Plan 5 Direct Lithium Extraction Hubs producing 62,000 m3/d (12,400 m3/d each) 2 Concentrate, Refining, and Conversion facilities connected via pipe to DLE hubs 36 multi-leg horizontal production wells (1,720 m3/d each) 30 vertical water disposal wells Years
Slide 11: Viewfield PEA Economic Highlights
empmetals.com Description Values Average Production LCE 12,175 tonnes/year Project Life 23.2 years Viewfield PEA Years 1-7 Total Capital Cost (incl. contingency) US$571 million Economic Average Annual Operating Costs US$40 million Production 18,860 tonnes/year Highlights Average Selling Price (LCE)
Slide 12: Viewfield PEA - Sensitivity Analysis
empmetals.com Viewfield PEA - Sensitivity Analysis After-Tax NPV (8) IRR (%) CSE: EMPS | OTCQB: EMPPF
Slide 13: Project Status and Workplan
empmetals.com Project Status and Workplan Timeline Projects Energy Source Minerals (ESM) DLE Pilot Programs Q4, 2023 Saltworks Concentrate, Refine, Convert Pilot 1 Program – 99.95% pure battery grade Li2CO3 Viewfield Preliminary Economic Assessment Q1, 2024 Koch DLE Pilot Plant in Saskatchewan (Comp
Slide 14: Project Status and Workplan
empmetals.com Project Status and Workplan Timeline Projects Survey, license, & submission of well permits and Stage 1 Commercial Plant Application (Complete) Q3, 2024 Summer Drilling Program (Complete) Saltworks Concentrate, Refine, Conversion Pilot 10 Program (In Progress) Complete Stage 1 Detailed
Slide 15: Stage One Commercial Plant
empmetals.com Stage One Commercial Plant Modular approach to expand across Saskatchewan US$160M – estimate to be defined lease holdings through Front End Engineering & Design 3,000 tonne/year battery grade Li2CO3 Refinery CSE: EMPS | OTCQB: EMPPF
Slide 16: EMP Metals Capital Structure
empmetals.com EMP Metals Capital Structure ROK 17% Issued & Outstanding 114,865,251 Founders & Insiders 38% Warrants* 23,660,200 Options 7,258,332 Tembo Capital 19.9% Fully Diluted 145,783,783 Retail Cash 3 million 8% Brokers 17% CSE: EMPS | OTCQB: EMPPF
Slide 17: Management & Directors
empmetals.com Management & Directors Karl Kottmeier - B.A, CEO, Director Over 25 years experience financing and administering companies listed on the TSX, TSX Venture and CSE Exchanges.Raised in excess of $200,000,000. Former CEO of Rockgate Capital, Rockridge Capital and American Lithium. Rob Gamle
Slide 18: Project Management Advisory Board
empmetals.com Project Management Cam Taylor - B.Sc, Chairman & CEO Rok Resources Co-founder of ROK Resources Inc., former President and CEO of Villanova 4 Oil Corp., Villanova Oil Corp. & Villanova Resources Inc. Geoscientist with over 30 years of experience in oil & gas exploration and development.
Slide 19: Address Telephone
empmetals.com Address 208A – 980 West 1st Street North Vancouver, BC V7P 3N4 Telephone +1 604-961-9212 Website www.empmetals.com CSE: EMPS | OTCQB: EMPPF