Emperor Metals, Inc. · CSE:AUOZ

Emperor Metals — Investor Presentation (February 2024)

28 slides from Emperor Metals's investor presentation, Feb 20, 2024

  1. Slide 1: Emperor Metals

    EMPEROR METALS CSE: AUOZ OTCQB: EMAUF FRA: 9NH

  2. Slide 2: Cautionary Statements

    vad CAUTIONARY STATEMENTS EMPEROR METALS DISCLAIMER Emperor Metals Inc. is a Canadian mineral exploration company listed on the Canadian Securities Exchange, or CSE, which is operated by CNSX Markets Inc. Neither the CSE nor its Market Regulator (as that term is defined in the Trading Rules and poli

  3. Slide 3: *Power-Fardy and Breede, 2011. The Mineral Resource Estimate (MRE) constructed in 2011 is considered

    • • • • • • • • *Power-Fardy and Breede, 2011. The Mineral Resource Estimate (MRE) constructed in 2011 is considered historical in nature as it was constructed prior to the most recent Canadian Institute of Mining and Metallurgy (CIM) standards (2014) and guidelines (2019) for mineral resources. In

  4. Slide 4: Management and Directors

    MANAGEMENT AND DIRECTORS Management & Advisory of over JOHN FLOREK M.SC., P.GEOL. 20 Public Mining Companies with President, CEO, and Director extensive experience in the Public Mining Sector & Capital Markets +30 years of technical and senior management experience working for major and junior minin

  5. Slide 5: Warrants and options

    Avg Warrant price .21 cents and 1.6-years remaining life Avg Option price .13 cents and 2.8-years remaining life

  6. Slide 6: 12 Month AUOZ:CSE Stock Chart

    12 MONTH AUOZ:CSE STOCK CHART As of Feb 20th, 2024 CSE: AUOZ OTCQB: EMAUF FRA: 9NH Historic Chart for Cdn:AUOZ by Stockwatch.com 604.687.1500 - (c) 2024 Tue Feb 20 2024 Op=0.135_Hi=0.14 Lo=0.13 Cl=0.14 Vol=50.010 Year hi=0.175_lo=0.055 (Cdn:AUOZ uA in Yai f May, ail 0.1875 0.18 0.1725 0.165 0.1575 0

  7. Slide 7: Duquesne West Gold Project

    ad EMPEROR METALS DUQUESNE WEST GOLD PROJECT EXCELLENT ACCESS TO INFRASTRUCTURE AND POWER RICH HISTORY OF PROLIFIC MINING The Abitibi Region is one of the world’s most prolific gold producing districts with ~200 million ounces of gold produced to date! The Porcupine-Destor fault zone (PDFZ) transect

  8. Slide 8: Tier District: Historic Prolific and Productive Mining

    TIER 1 DISTRICT EMPEROR HISTORIC PROLIFIC AND PRODUCTIVE MINING METALS N @ Producing Mine @ Development Project & Geological Fault Abitibi Greenstone Belt | : I | | | : / p | | | ONTARIO QUEBEC 200 M Oz Au Produced [Newmont Hoyle Pond HighGold Munro-Croesus FP ey memes | DUQUESNE WEST vd Emperor Met

  9. Slide 9: Tier District Infrastructure

    TIER 1 DISTRICT INFRASTRUCTURE yf Newmont HighGold Hoyle Pond Munro-Croesus vad EMPEROR METALS | N @ Producing Mine ) | @ Development Project Townships \ = Highways Railway Power Lines ONTARIO QUEBEC Water * ‘Agnico Eagle Hislop Newmont [Pan American | Agnico Eagle Porcupine/ | Bell Creek } Taylor H

  10. Slide 10: District Ownership, Neighborhood Deposits and Structure

    haat ‘ ad i District Ownership EMPEROR Neighborhood Deposits and Structure 1k ] HEIALS Agnico Eagle Holt Ind: 3,383,000 oz Au Ind: 898,000 oz Au thf! 157,000 07 Auu Inf: 1,310,000 = Ind: 231,200 oz Au Inf: 817,400 oz Au First Mining Duparquet Gold x = suk Ind: 3,432,100 oz A\ : | mt Emperor Metals M

  11. Slide 11: AI Machine Learning at Emperor Metals

    Al MACHINE LEARNING AT EME ROR METALS Advantages of Al Increased Efficiency: Al automates data analysis, expediting exploration workflows and optimizing resource allocation Improved Accuracy and Precision: Machine learning minimizes human bias, ensuring accurate identification of mineralization patt

  12. Slide 12: Example of Potential Stope Grade and Thickness

    vad EXAMPLE OF POTENTIAL STOPE EMPEROR GRADE AND THICKNESS METALS 22.045 5.40 Minable Shape Optimizer (MSO) 16.255 1 15.860 1138 used Gold Cutoff of 3 g/t Au and Gold 15.669 1137 Cpe Bai Av 15.399 14.68 + Minimum dimensions 2.5 m (width) x 14.249 14.75 8 m (length) x 4m (height) 13.991 16.81 13.701

  13. Slide 13: New Targets from AI Modelling

    vad NEW TARGETS FROM AI MODELLING EMPEROR Preliminary Model - Grade x Thickness (Looking North) —- Long Section METALS 320L s- ~ a te ee 240L 734 , ih “ i 4 ae Bic Gold (gt) x Thickness. i) . 3 1 pinoy -999,000 <= fj < 7.500 160L 80L -80L “160 L -240L flee ® Ling, ee 7 S to pe 320L i 5 lo Spay -400.

  14. Slide 14: 2023 Drilling Highlights

    ad 2023 DRILLING HIGHLIGHTS EMPEROR METALS 8,579 m drilling complete + 3,000 m of historical core sent for assays Emperor Metals pioneering Al/Machine Learning 3D and Geological Models aided our Exploration team in successfully hitting resource expansion drill targets that are adding ounces to this

  15. Slide 15: Long Section of DQ23-05 Intercept

    af LONG SECTION OF DQ-23-05 INTERCEPT EMPEROR Long Section of DQ23-05 Intercept __ (Looking North) Potential Stopes Figure showing DQ23-05 intercept-expanding ounces +100 meters along plunge of deposit This intercept adds ounces & stopes along this trend Exciting 2024 follow up drilling on this targ

  16. Slide 16: Footwall Zone Minable Stope Optimizer Polygons

    Footwall Zone Minable Stope Optimizer Polygons Criteria: >2.5 m of >3.0 g/t Au 6.2 m of 16.3 g/t Au 8.7 m of 6.5 g/t N Au 17.2 m of 3.5 g/t Au Inset 3.65 m of 6.25 g/t Au Legend 4.1 m of 6.7 g/t DQ23-02 Intercepts Au Stope Model Thickness (m) & Grade (g/t Au) – Historical Drilling DDH location relat

  17. Slide 17: AI Geological Model

    Al GEOLOGICAL MODEL EMPEROR METALS Cross Section of DQ23-05 (Looking West) +/- 20 m Window First Ever Geological Model on Property (Al Developed) Illuminates' competency contrast for previously unrecognized additional mineralized zones/ targets Benne! 0.50 of . if - Enlightens the controls to minera

  18. Slide 18: Phase I Assays and Core

    PHASE I ASSAYS AND CORE EMPEROR METALS Representation of mineralized & altered core from Representation of mineralized & altered core from DQ23-05 DQ23-01 (11.7 m of 5.63 g/t Au) core depth of 531.3 m (10.8 m of 15.8 g/t Au (includes 3.4 m of 27.24 g/t Au)) — core depth of 563 m 18

  19. Slide 19: Phase I Assays and Core

    PHASE I ASSAYS AND CORE EMPEROR METALS Representation of mineralized and altered porphyry core from DQ23-02 (25.0 m of 1.69 g/t Au); bottom of hole ended in mineralization and this zone is subsequently being extended by additional drilling. — core depth of 814 m Representation of mineralized and alt

  20. Slide 20: Open Pit Concept

    OPEN PIT CONCEPT Due to multiple zones of mineralization of both high-grade and lower grade bulk tonnage we ad EMPEROR SHOWING BOTH PHASE 1 AND ULTIMATE PIT SCENARIO METALS Ultimate Pit Concept Gold Legend ary ‘ Open Pit Mineralization (>0.4 g/t Au) -999,000 < [/] <= -1.000 Phase 1 Focus (Early expl

  21. Slide 21: Location of DQ23-07 in Model

    (Location of DQ23-07 in Model) 6.5 m of 6.8 g/t Au 5.3 m of 10.3 g/t Au Phase 1 Pit Shells (in grey) 6.7 m of 10.3 g/t Au DQ23-02 7.4 m of 4.5 g/t Au DQ23-07 15.7 m of 0.82 g/t Au 7.2 m of 2.80 g/t Au 13.4 m of 6.1 g/t 21.5 m of 0.40 g/t Au 5.1 m of 22.7 Au Ultimate Pit g/t Au (400 m depth) 2.8 m of

  22. Slide 22: Open Pit Concept

    OPEN PIT CONCEPT EMPEROR METALS It is estimated that up around 70% of historical drill core from surface to 500 meters is unsampled/assayed because they overlooked the open pit potential. We plan to send historic core for assays Legend Drillhole Trace (] Unsampled (sampled Historical Drillholes (DDH

  23. Slide 23: Open Pit with Stopes

    <? Open Pit with Stopes Looking North Legend Ww 1DQ23-X Intercepts (2023 Drilling) Stope Model Thickness (m) and Grade (g/t Au) — Historical Drilling Gold (g/t Au) 0.000 < ff <= 0.300 0.300 < [fj <= 0.500 0.500 < [fj <= 1.000 1.000 < [Jj] <= 1.500 1.500 < [| <= 3.000 3.000 < [/] <= 5.000 : ; 10.000

  24. Slide 24: Company Comparable Analysis

    COMPANY COMPARABLE ANALYSIS 300 ¢ 250 2 s co] iN 200 is a Sa 150 IRS) uot @ x 100 : © = 50 vag PROJECT Duquesne West = West Cache oe ee Emperor Metals Galleon Gold Maple Gold Mines vad EMPEROR METALS 3 Mining Marban Rouyn-Noranda Timmins LOCATION Quebec Ontario STAGE Advanced Advanced Exploration Ex

  25. Slide 25: Option payment schedule

    Work Work Year Due Date Cash Shares Commitment Commitment Date *

  26. Slide 26: Option Agreement Cost/Ounce - CAD

    vad OPTION AGREEMENT COST/OUNCE - CAD EMPEROR METALS $/oz Current Cost L $/oz Short Term Vision — $/oz Long Term Vision — > $20 $18 $16 $14 $12 $10 $8 w 15} z 5 OQ) ~ Q < wi 3) a a $6 $4 $2 $0 CSEAUOZ 26

  27. Slide 27: *Power-Fardy and Breede, 2011. The Mineral Resource Estimate (MRE) constructed in 2011 is considered

    ✔ ✔ ✔ ✔ ✔ ✔ *Power-Fardy and Breede, 2011. The Mineral Resource Estimate (MRE) constructed in 2011 is considered historical in nature as it was constructed prior to the most recent Canadian Institute of Mining and Metallurgy (CIM) standards (2014) and guidelines (2019) for mineral resources. In addi

  28. Slide 28: Contact Us

    Contact Us oem & Alex Horsley Corporate Development & Director ©) Head Office bs alexh@emperormetals.com g 10545 45 Avenue, NW ) 778.323.3058 250 Southridge, Suite 300 Edmonton, Alberta Canada, T6H 4M9 emperormetals.com CSE: AUOZ OTCQB: EMAUF FRA: 9NH Lon ‘

Emperor Metals — Investor Presentation (February 2024) on 6ix