Lode Gold Resources Inc · TSXV:LOD

Lode Gold Resources — Stratabound Minerals — Investor Presentation (October 2019)

22 slides from Lode Gold Resources's investor presentation, Oct 7, 2019

  1. Slide 1: Exploring and Developing a New Yukon Gold Project

    Exploring and Developing a New Yukon Gold Project October 7, 2019 TSX-V :SB November 22, 2017 1

  2. Slide 2: Forward-Looking Information and Statements

    FORWARD-LOOKING INFORMATION AND STATEMENTS WARNING: the Company relies upon litigation protection for “forward looking” statements. The information in this presentation may contain forward-looking information under applicable securities laws. This forward-looking information is subject to known and

  3. Slide 3: Investment Highlights

    Investment Highlights • Attractive portfolio of assets in the Yukon and New Brunswick leveraged across gold, copper, cobalt, silver and zinc • Key focus on a promising new gold project in Yukon - “Golden Culvert” project • Strong technical management team in place 3

  4. Slide 4: Golden Culvert, Yukon Territory – New Project and Focus

    Golden Culvert, Yukon Territory – New Project and Focus • High grade gold in quartz veins within low grade halos • Option to acquire 100%, 24 km of strike length in proven Hyland-Selwyn gold district of eastern Yukon. • Early stage gold exploration with significant historic gold results in a relativ

  5. Slide 5: The Golden Culvert Project: Sediment Hosted Orogenic Gold in the Yukon Central Hyland Group

    The Golden Culvert Project: Sediment Hosted Orogenic Gold in the Yukon Central Hyland Group • Gold bearing quartz veins and phyllite host rock grading up to 2.53 gpt Au/33.1 m including 60.1 gpt Au/0.9m in first drill program ever completed, 2018 • …within 3km x 250m wide >30 ppb Au in soil anomaly.

  6. Slide 6: Geological Setting of Vein-hosted Gold Occurrences in the Eastern Yukon

    Geological Setting of Vein-hosted Gold Occurrences in the Eastern Yukon (from Moynihan & Sack, YGS, AMEBC Conference 2018) Plateau (Goldstrike) Hyland Group of sediments within the Selwyn Basin is host to several significant and evolving new gold projects: Golden Culvert (Stratabound) 3 Aces, Sprogg

  7. Slide 7: 2019 Exploration Summary: Phase 1 Trench Results

    2019 Exploration Summary: Phase 1 Trench Results 23 trenches completed across 1 km of strike building upon 6 trenches and 8 drillholes completed in 2018 across 0.5 km of strike: Phase 1: six close-spaced in-fill trenches between three successful wide spaced trenches completed in 2018. • Gold encount

  8. Slide 8: 2019 Phase 1 Close-spaced Trenching Summary

    2019 Phase 1 Close-spaced Trenching Summary: UTM NAD UTM Interval 2019 Trench 83 NAD 83 Azimuth From (m) To (m) Au (gpt) length Northing Easting TR1901 6868884 531457 218 3.0 7.5 1.50 4.5 TR1902 6868871 531142 213 3.0 12.0 3.63 9.0 Including 10.5 12 19.15 1.5 TR1903 6868863 531158 219 0.0 5.5 1.93 5

  9. Slide 9: 2019 Exploration Summary: Phase 1 Trench Results

    2019 Exploration Summary: Phase 1 Trench Results Golden Culvert Claims – 84 sq. km Area of Fig. 1 9

  10. Slide 10: Golden Culvert 2018 Exploration Drill Hole Summary

    Golden Culvert 2018 Exploration Drill Hole Summary: Interval Diamond UTM NAD UTM NAD From Total Hole Azimuth Dip Structure To (m) Au (gpt) length Comments Drill hole 83 Northing 83 Easting (m) Length (m) GC1801 531305.4 6868814.6 187.6 -44.8 Ended short of target in fault. 19.8 Ended short of target

  11. Slide 11: Golden Culvert 2018 Exploration Trenching Summary

    Golden Culvert 2018 Exploration Trenching Summary: Interval Trench Line (m) Structure From (m) To (m) Au (gpt) Comments: length TR1801_A 00 North Main 9.0 16.0 2.76 7.0 TR1801_B 00 North West1 18.0 29.5 1.36 11.5 ends in mineralization Including 00 North West1 19.5 21.0 6.11 1.5 CH1801 80 North Main

  12. Slide 12: Plan View of 2018 Exploration Program Results

    Plan View of 2018 Exploration Program Results GC1806: 1.14 gpt Au/7.5m including 3.86 gpt Au/1.5m TR1801A – Discovery Main Vein: 2.76 gpt Au/7.0m including 6.67 gpt Au/2.5m quartz vein A’ TR1802A: 0.66 gpt Au/7.5 metres TR1801B: 1.49 gpt Au/10.0m including 6.11 gpt Au/1.5m quartz vein TR1802B: 0.34

  13. Slide 13: Section View A-A' of Drill Hole GC1803

    Section View A-A’ of Drill Hole GC1803: Gold bearing structures controlled along fold hinge axis southwest northeast Trench TR1804: ( off section and projected horizontally from 80m northwest downslope) 2.33 Trench TR1805: (off section and projected gpt Au/3 metres including 5.32 gpt Au/1.0 metre ho

  14. Slide 14: Drill hole GC1803

    Drill hole GC1803: GC1803: -45°, 2.53 gpt Au/33.1m between 111.5-144.6m including 60.10 gpt/0.9m down the hole in altered, folded, foliated phyllite host rock Accessory minerals: aspy-pyr-po-sphalerite 22.8 gpt Au/1m quartz vein 14

  15. Slide 15: Long Section View of 2018 Exploration Program

    Long Section View of 2018 Exploration Program NW TR1801A – Discovery Main Vein: 2.76 gpt Au/7.0 metres including 6.67 gpt TR1805: 1.43 gpt Au/12 metres including 6.45 gpt Au/1.5 metre quartz vein SE Au/2.5metre quartz vein GC1803: 2.53 gpt Au/31.1 metres 4.17 gpt Au TR1801B: 1.49 gpt Au/10.0 metres

  16. Slide 16: New Exploration Model Targets an Extensive +1 km Down Dip Projection

    New Exploration Model Targets an Extensive +1 km Down Dip Projection Golden Culvert sits at a higher stratigraphic position in the Vampire Fm above 3 Aces and Plateau located in the middle Yusezyu Fm…. Plenty of exploration potential to explore in between Approximate location of 3 Aces-Reef in Antic

  17. Slide 17: Plus an extensive strike length yet to explore…

    Plus an extensive strike length yet to explore… Soil Geochem Incomplete over Entire Claim Group Rubus Claim Group Closed Cantung Mine: 3 km gold-in soil On care and maintenance anomaly remains open along strike Golden Culvert on both ends. Claim Group Camp Zone Only 20% of Unsampled gaps: 24km strik

  18. Slide 18: Project Portfolio: leveraged across Gold, Copper, Cobalt, Silver and Zinc

    Project Portfolio: leveraged across Gold, Copper, Cobalt, Silver and Zinc Bathurst Camp - New Brunswick 1. CNE Mining Lease¹ – 100% interest in past producing Lead-Zinc-Silver- Copper project – further exploration potential under soils anomaly 2. Captain Copper-Cobalt Deposit¹ – 100% owned with a NI

  19. Slide 19: Stratabound Minerals Corp. Trading Information

    Stratabound Minerals Corp. Trading Information TSX Venture Exchange – Tier 2 Symbol: SB Shares issued and outstanding: 35.0M Share Price at October 7, 2019: $0.04 52 week high: $0.42 Market Capitalization: $1.4 M Average Daily Volume: 45,000 19

  20. Slide 20: Stratabound Share Structure

    Stratabound Share Structure Stratabound Minerals Corp. Share Structure at Oct. 7, 2019 Outstanding % Warrants Options Fully Diluted % Total 35,037,196 3,009,970 1,122,221 39,169,387 Long-Term Private 14,049,601 40.1% 1,484,192 15,533,793 39.6% Holders Management 5,656,158 16.1% 144,423 1,122,222 6,9

  21. Slide 21: Management and Directors

    Management and Directors Margaret Kent • 40 years of experience in Canadian mining industry Chairman, • Founded and financed multiple gold mining companies Director • leader in the financing and developing of challenging new projects that majors had passed on R. Kim Tyler, • 40 years of progressive

  22. Slide 22: Contact

    Contact: Kim Tyler, President, CEO ktyler@stratabound.com (705) 822-9771 r 22

Stratabound Minerals — Investor Presentation (October 2019) on 6ix