Slide 1: Queensland LNG
ENERGY WORLD Queensland LNG 15 February 2010 AUSTRALIAN GASFIELDS Presentation by Mr. Stewart Elliott Managing Director and CEO, Energy World Corp. Delivering Clean and Green Energy
Slide 2: Disclaimer
Disclaimer • These materials have been prepared by Energy World Group (the "Company") solely for information use during this presentation. These materials may not be copied, reproduced, passed on or redistributed, directly or indirectly, to any other person (whether within or outside your organizati
Slide 3: Introduction
Introduction Since our presentation last year the LNG industry has experienced some challenging factors: 1. Tight financing for early developments of gasfields and LNG sites 2. Slump in the gas prices for both the Henry Hub and the Asian markets 3. LNG projects delayed 4. Rising cost of developing C
Slide 4: Introduction (Con't)
Introduction (Con’t) To service this new market, it must be developed at “both ends”, supply, production and the receiving terminals and distribution for the new LNG. We believe at the moment, insufficient attention is being given to the receiving terminals and distribution for delivering of gas to
Slide 5: Section 1: Plan, Vision and Strategy
Section 1: Plan, Vision and Strategy
Slide 6: Business Opportunity - LNG
= BIG BUSINESS OPPORTUNITY. LNG importation off shore gas plant on shore Cranes prot : gas processing plants %
Slide 7: Clean and Green Energy
Clean and Green Energy • Increasing concern over “global warming” has led to pollution and emission caps, LNG is reduction goals and carbon trading considered to be • Natural gas is a cleaner and more efficient fossil fuel a source of - For an equivalent amount of heat, burning natural gas produces
Slide 8: Our Target
Our Target To become a leader in modular LNG development and a significant supplier of natural gas to Asian markets Pagbilao Hub Terminal 300MW Power Station Sri Lanka 600MW Power Station Sengkang LNG Hub 2-5MTPA LNG Terminal Manila Papua New Guinea 2-5MTPA LNG Terminal and Deep Water Port Jakarta S
Slide 9: Introduction - Asia's Appetite for Energy
Introduction - Asia’s Appetite for Energy kWh 0 2000 4000 6000 8000 10000 12000 14000 16000 United States: 13351 Australia: 11193 New Zealand: 8937 Singapore: 8170 Japan: 8072 South Korea: 7391 Germany: 7029 Energy World Group has always United Kingdom: 6206 positioned itself to take advantage of Ho
Slide 10: Section 2: Business
Section 2: Business LNG Operations
Slide 11: Development of Modular LNG
Development of Modular LNG Energy World Group Energy World Group developed Australia’s Energy World Group approached liquefaction Energy World Group first domestic LNG plant decided LNG was the equipment makers ordered a FEED Study over 18 years ago (Alice best way to supply asking for their to desi
Slide 12: Teaming Up with Industry Leaders on Modular LNG
Teaming Up with Industry Leaders on Modular LNG Energy World Group has brought together distinguished global players and strong partners such as Chart and Siemens to develop an efficient, electric drive modular LNG system that can be used in a variety of locations. ENERGY WORLD GROUP qInvestor, Deve
Slide 13: Development of Modular LNG
Development of Modular LNG E-LNG allows for a simple, elegant Liquefaction setup with a relatively small footprint. Through innovative design, Energy World Group has downsized typical LNG train sizes – we are moving from the grandfather clock to the pocket watch. By using a standard design, more and
Slide 14: Development of Modular LNG
Development of Modular LNG Cold Box and Compressor Final Gas Clean Up
Slide 15: Benefits of Modular LNG
Benefits of Modular LNG ü Significantly lower capital cost requirement (easier financing) with faster construction and faster LNG to market (earlier revenue stream during development of gas field) ü Standardized, "off the shelf" design, proven technology, minimal (re)engineering ü Maximized shop fab
Slide 16: The LNG Storage Tank
The LNG Storage Tank §Energy agencies Energy World Group has secured a License from GTT – Gaztransport & are forecasting Technigaz to use its LNG tank technology for land based membrane tanks significant increases in natural gas demand during the next 20 years. §The largest increments in future gas
Slide 17: LNG Storage Tank Membrane Lining
LNG Storage Tank Membrane Lining GST® Containment GST® Containment Stainless steel corrugated membrane Primary Barrier Plywood Insulating panel Reinforced polyurethane foam A composite laminated material Secondary Barrier Reinforced polyurethane foam Plywood Mastic Concrete wall covered with a moist
Slide 18: LNG Tank Construction
LNG Tank Construction Site Formation Foundation Slipform Assembling Slipform in Progress Air Lift Roof Structure Air Lift Slipform Completed Air Lift of Roof in Progress Installation of GTT Membrane Pipeline / Pumps Installation and Roof Erection / Insulation System and Suspended Ceiling LNG Tank Co
Slide 19: LNG Tank Family
LNG Tank Family Section of LNG Storage Tanks g]__ il ( al if |__ 35 | | ssi Storage Tank Storage Tank Storage Tank 5,000 Tons 10,000 Tons 20,000 Tons = 75M ou Storage Tank Storage Tank Storage Tank 40,000 Tons 60,000 Tons 80,000 Tons
Slide 20: Australia – Abbot Point LNG Project
Our LNG Projects Australia – Abbot Point LNG Project Proposed Development of Harbour Port, Power Station, LNG Production and Load Out Facilities at Abbot Point A U S T R A L I A
Slide 21: Australia – Abbot Point LNG Project
Our LNG Projects Australia – Abbot Point LNG Project Australia Unlocking Queensland Gas Assets Queensland • Port of Abbot Point Location • Existing deep-water coal export terminal Community • An opportunity for many smaller gas exploration companies in Opportunity Queensland to gain access to export
Slide 22: Our Proposed LNG Plant and Power Station
Our Proposed LNG Plant and Power Station Abbot Point Proposed LNG Plant & Power Station: Proposed §Initial capacity 2 MTPA LNG Jetty Water Depth 13 M+ §Future expansion to 5 MTPA §Gas supply from EWC owned and operated gas fields via the Qld Gas Highway Proposed LNG Plant Proposed Proposed Qld. Gas
Slide 23: Abbot Point – Queensland's Chosen Gas Port
Abbot Point – Queensland’s Chosen Gas Port Proposed Multi Cargo Facilities
Slide 24: Abbot Point: Queensland's Chosen Gas Port
Our LNG Projects Australia – Abbot Point: “Queensland’s Chosen Gas Port” One of the stated objectives of the Plan for development of the Port of Abbot Point is to provide export opportunities for Queensland Products, and the following statement, under the heading “Methane Gas”, has been included. “T
Slide 25: Australia – Other Gas and Oil Interests
Australia – Other Gas and Oil Interests Southern Cooper Project (PEL 96) PEL 96 (Block K) Percentage • 33.3% Interest of EWC Gas / Oil • Gas potential of 8 – 20 TCF Operating • Strike Oil Limited Party EWC portion 2.50 - 6.50 TCF Production • PEL obtained 13 May 2009 Status Future • Being determined
Slide 26: Australia – Gilmore LNG Facility
Our LNG Projects Australia – Gilmore LNG Facility Proposed Markets • The Gilmore LNG facility will be a major link in our aggressive development program for Australia. primarilary focused on the Eastern States including the Northern Territory and South Australia. • We propose to develop the market i
Slide 27: Taking The Mystery Out of LNG Fueling
Taking The Mystery Out of LNG Fueling
Slide 28: Permanent LNG/LCNG Station
Permanent LNG/LCNG Station Quad 15,000 Gallon Vertical Tanks
Slide 29: On-Board LNG Vehicle Tanks
See <3) On-Board LNG Vehicle Tanks INEXGEN FUELEN 6,
Slide 30: How The Tank Works
How The Tank Works LNG Dispenser fj Fuel Receptacle ‘== Over Pressure Fuel Gauge Regulator Gaseous Fuel to Engine Vehicle Tank INEXGEN FUIPELEN 6,
Slide 31: LNG Virtual Pipeline
LNG Virtual Pipeline Australia: “Double- Trailers” with LNG fueled trucks
Slide 32: Intermodal Transport with ISO Containers
Intermodal Transport with ISO Containers
Slide 33: Rail Transport
Rail Transport LNG rail car 130 600 liters, 6.2 bar (5.2 allowed by DOT), LNG or Liquid Ethylene (Chart Ind. for USA railway regulations)
Slide 34: Rail Transport
Rail Transport Left and right side connections are important for railway cars LNG trailer 56 000 liters, 7 bar, non-vent holding time 80 days (Chart Ferox for Naturgassvest, Norway)
Slide 35: LNG Satellite Storage
LNG Satellite Storage
Slide 36: LNG Buses Fueling Station - China
LNG Buses Fueling Station - China
Slide 37: Our Indonesian Projects
Our Indonesian Projects ENERGY WORLD GROUP Indonesian Projects
Slide 38: Indonesia – Sengkang Gasfield
Our Gas and LNG Projects Indonesia – Sengkang Gasfield Production Sharing Contract (PSC) EWC Indonesia Projects The Sengkang PSC Block is located in the province of South Sulawesi. The PSC is operated by Energy Equity Epic Sengkang (“EEES”) which is 100% owned by EWC. Gas from the PSC is supplied to
Slide 39: Indonesia – Sengkang Power Plant Expansion
Our Power Plant Project Indonesia – Sengkang Power Plant Expansion 195MW capacity is currently operational after the first 60MW expansion unit was commissioned in November 2008. Additional 60MW gas turbine and 60MW steam turbine are expected to become operational by December 2010 and December 2011 r
Slide 40: Indonesia – Sengkang Drilling Rig on site
Our Gas and LNG Projects Indonesia – Sengkang Drilling Rig on site Well Workovers and Production Gas Well Drilling, August 2009
Slide 41: Indonesia – Sengkang Gasfield
Our Gas and LNG Projects Indonesia – Sengkang Gasfield Production Sharing Contract (PSC) Assessment of Potential Resources from Prospects and Leads Hydrocarbon Resource Estimates Not Risk Adjusted An assessment, from prospects and leads, of the potential Hydrocarbon resources in the Sengkang field i
Slide 42: Sengkang Gasfield Development Strategy
Our Gas and LNG Projects Indonesia – Sengkang Gasfield Production Sharing Contract (PSC) Development Strategy: To fully develop the potential of the Sengkang PSC, three phases of expansion, drilling and exploration. Phase I will fully develop the potential for the Kampung Baru Field – providing a se
Slide 43: Indonesia – Plan of Development (POD)
Our Gas and LNG Projects Indonesia – Plan of Development (POD) PLAN OF DEVELOPMENT (POD) BPMigas has requested the additional information which is now being prepared for submission
Slide 44: Indonesia – Sengkang LNG Project
Our LNG Projects Indonesia – Sengkang LNG Project Sengkang 2-5MTPA LNG Terminal CPP LNG Loading Kampung Baru Terminal LNG Plant Site Bongo 01 Walanga 02 Power Plant SENGKANG Power Station For LNG Plants
Slide 45: Indonesia – Sengkang LNG Project
Our LNG Projects Indonesia – Sengkang LNG Project South Sulawesi LNG: § Site acquired § Major equipment being shipped
Slide 46: Sengkang LNG Project – Final Gas Clean Up
Our LNG Projects Indonesia – Sengkang LNG Project – Final Gas Clean Up
Slide 47: Sengkang LNG Project – MRC Compression
Our LNG Projects Indonesia – Sengkang LNG Project – MRC Compression Electric Motor Drive Gear Box Compressor
Slide 48: Sengkang LNG Project – Liquefier Cold Box Module
Our LNG Projects Indonesia – Sengkang LNG Project – Liquefier Cold Box Module
Slide 49: Sengkang LNG Project – Air Cooled Heat Exchangers
Our LNG Projects Indonesia – Sengkang LNG Project – Air Cooled Heat Exchangers
Slide 50: Sengkang LNG Project – Vacuum Insulated Pipe
Our LNG Projects Indonesia – Sengkang LNG Project – Vacuum Insulated Pipe
Slide 51: Sengkang LNG Project – LNG Marine Loading Arms
Our LNG Projects Indonesia – Sengkang LNG Project – LNG Marine Loading Arms
Slide 52: Sengkang LNG Project – Control & Instrumentation
Our LNG Projects Indonesia – Sengkang LNG Project – Control & Instrumentation Siemens – Factory Acceptance Test (FAT) for Sengkang LNG Direct Control System (DCS)
Slide 53: Sengkang LNG Project – Site Formation Works
Our LNG Projects Indonesia – Sengkang LNG Project – Site Formation Works
Slide 54: Papua New Guinea – Development Projects in Gulf Province
Our LNG Projects Papua New Guinea – Development Projects in Gulf Province Proposed Developments of LNG Terminal, Petroleum Refinery, Deep Water Port, Cement Plant, Housing and Industrial Estates Gulf Province
Slide 55: Papua New Guinea – Proposed Pipeline
Our LNG Projects Papua New Guinea – Development Projects in Gulf Province Proposed Pipeline EWC - Proposal LNG Terminal Land A : 80 Km B : 105 Km Total : 185 Km Sea C : 95 Km EWI - Deep Water Port D : 55 Km B Total : 150 Km A Gross Pipeline : 335 Km EWI - Petroleum Refinery Papua New Guinea C D EWI
Slide 56: Papua New Guinea – Gulf Province LNG Project
Our LNG Projects Papua New Guinea – Gulf Province LNG Project – Signing Agreement In Conjunction with Energy World International Limited Gulf Province Developments: • Natural gas supply pipeline • 2 - 5 MTPA LNG production facility • LNG Terminal will be developed in conjunction with a deep water po
Slide 57: Papua New Guinea – Western Province LNG Project
Our LNG Projects Papua New Guinea – Western Province LNG Project Parama Island LNG: • Initial capacity 2 MTPA • Future expansion to 5 MTPA • LNG Terminal will be developed in conjunction with a deep water port and power station.
Slide 58: Our Philippines Projects
Our Philippines Projects Kanan B1 Hydro Electric Project Phase I – 145MW Kanan 200MW Wind Farm Project Phase II – 70MW
Slide 59: Business Opportunity in the Philippines
Business Opportunity in the Philippines
Slide 60: The Philippines – LNG Hub Terminal and Power Station
Our LNG Projects The Philippines – LNG Hub Terminal and Power Station
Slide 61: The Philippines – LNG Hub Terminal and Power Station
Our LNG Projects The Philippines – LNG Hub Terminal and Power Station Pagbilao LNG Terminal: Pagbilao Hub Terminal § Terminal will act as a hub for onward distribution of LNG throughout the Philippines PHILIPPINES § Energy World Group will develop a CCGT power station at this site First LNG Terminal
Slide 62: Quezon Province Developments
QUEZON PROVINCE DEVELOPMENTS HON. RAFFY P. NANTES GOVERNOR QUEZON PROVINCE DELIVERING CLEAN HOTEL AND RESORT ENERGY FOR QUEZON LNG CARRIER VESSEL 300MW 300MW GAS FIRED FERRY PASSENGER POWER STATION TERMINAL ENERGY WORLD GROUP
Slide 63: The Philippines - LNG Hub Terminal and Power Station
Our LNG Projects The Philippines - LNG Hub Terminal and Power Station From left to right: Former Gov. Eduardo Rodriguez, Gov. Rafael P. Nantes, Secretary of DOE, Provincial Government of Quezon – Mr. Angelo T. Reyes, MD of EW Group – Mr. Stewart Elliott
Slide 64: Ground Breaking Ceremony 28 August 2009
Our LNG Projects The Philippines - LNG Hub Terminal and Power Station Ground Breaking Ceremony 28 August 2009
Slide 65: LNG Hub Terminal Site Preparation
Our LNG Projects The Philippines - LNG Hub Terminal Site Preparation
Slide 66: LNG transport — sea shore navigation
Oe) LNG transport — sea shore navigation
Slide 67: Other Projects in the Philippines
Other Projects in the Philippines Kanan B1 Hydro Electric Project
Slide 68: Other Projects in the Philippines
Other Projects in the Philippines Kanan Wind Farm Project F D E WINDFARM LOCATION (Phase 1) B C A
Slide 69: Sri Lanka – Hambantota or Kerawalapitiya LNG Hub Terminal
Our LNG Projects Sri Lanka – Hambantota or Kerawalapitiya LNG Hub Terminal 600MW Combined Cycle Gas Turbine Power Station (2 x 300MW) Power Station
Slide 70: Sri Lanka – Hambantota or Kerawalapitiya LNG Hub Terminal
Our LNG Projects Sri Lanka – Hambantota or Kerawalapitiya LNG Hub Terminal Hambantota or Kerawalapitiya LNG Hub Terminal: • This terminal will act as a hub for onward distribution of LNG throughout Sri Lanka • Energy World Group will develop a CCGT power station at this site • Substantial developmen
Slide 71: Sri Lanka – Hambantota or Kerawalapitiya LNG Hub Terminal
Our LNG Projects Sri Lanka – Hambantota or Kerawalapitiya LNG Hub Terminal
Slide 72: Development of Floating Modular LNG
Development of Floating Modular LNG LNG Storage Ship
Slide 73: 3 Ship Solution for Floating LNG
3 Ship Solution for Floating LNG Based on the standard Energy World Group LNG ship – Energy World Group developed 3 ship solution for Floating LNG. LNG Support Ship - Gas pretreatment and power generation is located on the first ship. LNG Liquefaction Ship - Liquefaction (2 x 500,000 TPA) trains the
Slide 74: Development of Floating Modular LNG
Development of Floating Modular LNG Gas Cleanup and Power Generation Ship ENERGY WORLD GROUP
Slide 75: Development of Floating Modular LNG
Development of Floating Modular LNG LNG Liquefaction Ship 2 x 500,000 TPA ENERGY WORLD GROUP
Slide 76: Thank You!
Thank You! 15 Feb 2010