Energy World Corporation Ltd · ASX:EWC

Energy World — Investor Presentation (February 2010)

76 slides from Energy World's investor presentation, Feb 15, 2010

  1. Slide 1: Queensland LNG

    ENERGY WORLD Queensland LNG 15 February 2010 AUSTRALIAN GASFIELDS Presentation by Mr. Stewart Elliott Managing Director and CEO, Energy World Corp. Delivering Clean and Green Energy

  2. Slide 2: Disclaimer

    Disclaimer • These materials have been prepared by Energy World Group (the "Company") solely for information use during this presentation. These materials may not be copied, reproduced, passed on or redistributed, directly or indirectly, to any other person (whether within or outside your organizati

  3. Slide 3: Introduction

    Introduction Since our presentation last year the LNG industry has experienced some challenging factors: 1. Tight financing for early developments of gasfields and LNG sites 2. Slump in the gas prices for both the Henry Hub and the Asian markets 3. LNG projects delayed 4. Rising cost of developing C

  4. Slide 4: Introduction (Con't)

    Introduction (Con’t) To service this new market, it must be developed at “both ends”, supply, production and the receiving terminals and distribution for the new LNG. We believe at the moment, insufficient attention is being given to the receiving terminals and distribution for delivering of gas to

  5. Slide 5: Section 1: Plan, Vision and Strategy

    Section 1: Plan, Vision and Strategy

  6. Slide 6: Business Opportunity - LNG

    = BIG BUSINESS OPPORTUNITY. LNG importation off shore gas plant on shore Cranes prot : gas processing plants %

  7. Slide 7: Clean and Green Energy

    Clean and Green Energy • Increasing concern over “global warming” has led to pollution and emission caps, LNG is reduction goals and carbon trading considered to be • Natural gas is a cleaner and more efficient fossil fuel a source of - For an equivalent amount of heat, burning natural gas produces

  8. Slide 8: Our Target

    Our Target To become a leader in modular LNG development and a significant supplier of natural gas to Asian markets Pagbilao Hub Terminal 300MW Power Station Sri Lanka 600MW Power Station Sengkang LNG Hub 2-5MTPA LNG Terminal Manila Papua New Guinea 2-5MTPA LNG Terminal and Deep Water Port Jakarta S

  9. Slide 9: Introduction - Asia's Appetite for Energy

    Introduction - Asia’s Appetite for Energy kWh 0 2000 4000 6000 8000 10000 12000 14000 16000 United States: 13351 Australia: 11193 New Zealand: 8937 Singapore: 8170 Japan: 8072 South Korea: 7391 Germany: 7029 Energy World Group has always United Kingdom: 6206 positioned itself to take advantage of Ho

  10. Slide 10: Section 2: Business

    Section 2: Business LNG Operations

  11. Slide 11: Development of Modular LNG

    Development of Modular LNG Energy World Group Energy World Group developed Australia’s Energy World Group approached liquefaction Energy World Group first domestic LNG plant decided LNG was the equipment makers ordered a FEED Study over 18 years ago (Alice best way to supply asking for their to desi

  12. Slide 12: Teaming Up with Industry Leaders on Modular LNG

    Teaming Up with Industry Leaders on Modular LNG Energy World Group has brought together distinguished global players and strong partners such as Chart and Siemens to develop an efficient, electric drive modular LNG system that can be used in a variety of locations. ENERGY WORLD GROUP qInvestor, Deve

  13. Slide 13: Development of Modular LNG

    Development of Modular LNG E-LNG allows for a simple, elegant Liquefaction setup with a relatively small footprint. Through innovative design, Energy World Group has downsized typical LNG train sizes – we are moving from the grandfather clock to the pocket watch. By using a standard design, more and

  14. Slide 14: Development of Modular LNG

    Development of Modular LNG Cold Box and Compressor Final Gas Clean Up

  15. Slide 15: Benefits of Modular LNG

    Benefits of Modular LNG ü Significantly lower capital cost requirement (easier financing) with faster construction and faster LNG to market (earlier revenue stream during development of gas field) ü Standardized, "off the shelf" design, proven technology, minimal (re)engineering ü Maximized shop fab

  16. Slide 16: The LNG Storage Tank

    The LNG Storage Tank §Energy agencies Energy World Group has secured a License from GTT – Gaztransport & are forecasting Technigaz to use its LNG tank technology for land based membrane tanks significant increases in natural gas demand during the next 20 years. §The largest increments in future gas

  17. Slide 17: LNG Storage Tank Membrane Lining

    LNG Storage Tank Membrane Lining GST® Containment GST® Containment Stainless steel corrugated membrane Primary Barrier Plywood Insulating panel Reinforced polyurethane foam A composite laminated material Secondary Barrier Reinforced polyurethane foam Plywood Mastic Concrete wall covered with a moist

  18. Slide 18: LNG Tank Construction

    LNG Tank Construction Site Formation Foundation Slipform Assembling Slipform in Progress Air Lift Roof Structure Air Lift Slipform Completed Air Lift of Roof in Progress Installation of GTT Membrane Pipeline / Pumps Installation and Roof Erection / Insulation System and Suspended Ceiling LNG Tank Co

  19. Slide 19: LNG Tank Family

    LNG Tank Family Section of LNG Storage Tanks g]__ il ( al if |__ 35 | | ssi Storage Tank Storage Tank Storage Tank 5,000 Tons 10,000 Tons 20,000 Tons = 75M ou Storage Tank Storage Tank Storage Tank 40,000 Tons 60,000 Tons 80,000 Tons

  20. Slide 20: Australia – Abbot Point LNG Project

    Our LNG Projects Australia – Abbot Point LNG Project Proposed Development of Harbour Port, Power Station, LNG Production and Load Out Facilities at Abbot Point A U S T R A L I A

  21. Slide 21: Australia – Abbot Point LNG Project

    Our LNG Projects Australia – Abbot Point LNG Project Australia Unlocking Queensland Gas Assets Queensland • Port of Abbot Point Location • Existing deep-water coal export terminal Community • An opportunity for many smaller gas exploration companies in Opportunity Queensland to gain access to export

  22. Slide 22: Our Proposed LNG Plant and Power Station

    Our Proposed LNG Plant and Power Station Abbot Point Proposed LNG Plant & Power Station: Proposed §Initial capacity 2 MTPA LNG Jetty Water Depth 13 M+ §Future expansion to 5 MTPA §Gas supply from EWC owned and operated gas fields via the Qld Gas Highway Proposed LNG Plant Proposed Proposed Qld. Gas

  23. Slide 23: Abbot Point – Queensland's Chosen Gas Port

    Abbot Point – Queensland’s Chosen Gas Port Proposed Multi Cargo Facilities

  24. Slide 24: Abbot Point: Queensland's Chosen Gas Port

    Our LNG Projects Australia – Abbot Point: “Queensland’s Chosen Gas Port” One of the stated objectives of the Plan for development of the Port of Abbot Point is to provide export opportunities for Queensland Products, and the following statement, under the heading “Methane Gas”, has been included. “T

  25. Slide 25: Australia – Other Gas and Oil Interests

    Australia – Other Gas and Oil Interests Southern Cooper Project (PEL 96) PEL 96 (Block K) Percentage • 33.3% Interest of EWC Gas / Oil • Gas potential of 8 – 20 TCF Operating • Strike Oil Limited Party EWC portion 2.50 - 6.50 TCF Production • PEL obtained 13 May 2009 Status Future • Being determined

  26. Slide 26: Australia – Gilmore LNG Facility

    Our LNG Projects Australia – Gilmore LNG Facility Proposed Markets • The Gilmore LNG facility will be a major link in our aggressive development program for Australia. primarilary focused on the Eastern States including the Northern Territory and South Australia. • We propose to develop the market i

  27. Slide 27: Taking The Mystery Out of LNG Fueling

    Taking The Mystery Out of LNG Fueling

  28. Slide 28: Permanent LNG/LCNG Station

    Permanent LNG/LCNG Station Quad 15,000 Gallon Vertical Tanks

  29. Slide 29: On-Board LNG Vehicle Tanks

    See <3) On-Board LNG Vehicle Tanks INEXGEN FUELEN 6,

  30. Slide 30: How The Tank Works

    How The Tank Works LNG Dispenser fj Fuel Receptacle ‘== Over Pressure Fuel Gauge Regulator Gaseous Fuel to Engine Vehicle Tank INEXGEN FUIPELEN 6,

  31. Slide 31: LNG Virtual Pipeline

    LNG Virtual Pipeline Australia: “Double- Trailers” with LNG fueled trucks

  32. Slide 32: Intermodal Transport with ISO Containers

    Intermodal Transport with ISO Containers

  33. Slide 33: Rail Transport

    Rail Transport LNG rail car 130 600 liters, 6.2 bar (5.2 allowed by DOT), LNG or Liquid Ethylene (Chart Ind. for USA railway regulations)

  34. Slide 34: Rail Transport

    Rail Transport Left and right side connections are important for railway cars LNG trailer 56 000 liters, 7 bar, non-vent holding time 80 days (Chart Ferox for Naturgassvest, Norway)

  35. Slide 35: LNG Satellite Storage

    LNG Satellite Storage

  36. Slide 36: LNG Buses Fueling Station - China

    LNG Buses Fueling Station - China

  37. Slide 37: Our Indonesian Projects

    Our Indonesian Projects ENERGY WORLD GROUP Indonesian Projects

  38. Slide 38: Indonesia – Sengkang Gasfield

    Our Gas and LNG Projects Indonesia – Sengkang Gasfield Production Sharing Contract (PSC) EWC Indonesia Projects The Sengkang PSC Block is located in the province of South Sulawesi. The PSC is operated by Energy Equity Epic Sengkang (“EEES”) which is 100% owned by EWC. Gas from the PSC is supplied to

  39. Slide 39: Indonesia – Sengkang Power Plant Expansion

    Our Power Plant Project Indonesia – Sengkang Power Plant Expansion 195MW capacity is currently operational after the first 60MW expansion unit was commissioned in November 2008. Additional 60MW gas turbine and 60MW steam turbine are expected to become operational by December 2010 and December 2011 r

  40. Slide 40: Indonesia – Sengkang Drilling Rig on site

    Our Gas and LNG Projects Indonesia – Sengkang Drilling Rig on site Well Workovers and Production Gas Well Drilling, August 2009

  41. Slide 41: Indonesia – Sengkang Gasfield

    Our Gas and LNG Projects Indonesia – Sengkang Gasfield Production Sharing Contract (PSC) Assessment of Potential Resources from Prospects and Leads Hydrocarbon Resource Estimates Not Risk Adjusted An assessment, from prospects and leads, of the potential Hydrocarbon resources in the Sengkang field i

  42. Slide 42: Sengkang Gasfield Development Strategy

    Our Gas and LNG Projects Indonesia – Sengkang Gasfield Production Sharing Contract (PSC) Development Strategy: To fully develop the potential of the Sengkang PSC, three phases of expansion, drilling and exploration. Phase I will fully develop the potential for the Kampung Baru Field – providing a se

  43. Slide 43: Indonesia – Plan of Development (POD)

    Our Gas and LNG Projects Indonesia – Plan of Development (POD) PLAN OF DEVELOPMENT (POD) BPMigas has requested the additional information which is now being prepared for submission

  44. Slide 44: Indonesia – Sengkang LNG Project

    Our LNG Projects Indonesia – Sengkang LNG Project Sengkang 2-5MTPA LNG Terminal CPP LNG Loading Kampung Baru Terminal LNG Plant Site Bongo 01 Walanga 02 Power Plant SENGKANG Power Station For LNG Plants

  45. Slide 45: Indonesia – Sengkang LNG Project

    Our LNG Projects Indonesia – Sengkang LNG Project South Sulawesi LNG: § Site acquired § Major equipment being shipped

  46. Slide 46: Sengkang LNG Project – Final Gas Clean Up

    Our LNG Projects Indonesia – Sengkang LNG Project – Final Gas Clean Up

  47. Slide 47: Sengkang LNG Project – MRC Compression

    Our LNG Projects Indonesia – Sengkang LNG Project – MRC Compression Electric Motor Drive Gear Box Compressor

  48. Slide 48: Sengkang LNG Project – Liquefier Cold Box Module

    Our LNG Projects Indonesia – Sengkang LNG Project – Liquefier Cold Box Module

  49. Slide 49: Sengkang LNG Project – Air Cooled Heat Exchangers

    Our LNG Projects Indonesia – Sengkang LNG Project – Air Cooled Heat Exchangers

  50. Slide 50: Sengkang LNG Project – Vacuum Insulated Pipe

    Our LNG Projects Indonesia – Sengkang LNG Project – Vacuum Insulated Pipe

  51. Slide 51: Sengkang LNG Project – LNG Marine Loading Arms

    Our LNG Projects Indonesia – Sengkang LNG Project – LNG Marine Loading Arms

  52. Slide 52: Sengkang LNG Project – Control & Instrumentation

    Our LNG Projects Indonesia – Sengkang LNG Project – Control & Instrumentation Siemens – Factory Acceptance Test (FAT) for Sengkang LNG Direct Control System (DCS)

  53. Slide 53: Sengkang LNG Project – Site Formation Works

    Our LNG Projects Indonesia – Sengkang LNG Project – Site Formation Works

  54. Slide 54: Papua New Guinea – Development Projects in Gulf Province

    Our LNG Projects Papua New Guinea – Development Projects in Gulf Province Proposed Developments of LNG Terminal, Petroleum Refinery, Deep Water Port, Cement Plant, Housing and Industrial Estates Gulf Province

  55. Slide 55: Papua New Guinea – Proposed Pipeline

    Our LNG Projects Papua New Guinea – Development Projects in Gulf Province Proposed Pipeline EWC - Proposal LNG Terminal Land A : 80 Km B : 105 Km Total : 185 Km Sea C : 95 Km EWI - Deep Water Port D : 55 Km B Total : 150 Km A Gross Pipeline : 335 Km EWI - Petroleum Refinery Papua New Guinea C D EWI

  56. Slide 56: Papua New Guinea – Gulf Province LNG Project

    Our LNG Projects Papua New Guinea – Gulf Province LNG Project – Signing Agreement In Conjunction with Energy World International Limited Gulf Province Developments: • Natural gas supply pipeline • 2 - 5 MTPA LNG production facility • LNG Terminal will be developed in conjunction with a deep water po

  57. Slide 57: Papua New Guinea – Western Province LNG Project

    Our LNG Projects Papua New Guinea – Western Province LNG Project Parama Island LNG: • Initial capacity 2 MTPA • Future expansion to 5 MTPA • LNG Terminal will be developed in conjunction with a deep water port and power station.

  58. Slide 58: Our Philippines Projects

    Our Philippines Projects Kanan B1 Hydro Electric Project Phase I – 145MW Kanan 200MW Wind Farm Project Phase II – 70MW

  59. Slide 59: Business Opportunity in the Philippines

    Business Opportunity in the Philippines

  60. Slide 60: The Philippines – LNG Hub Terminal and Power Station

    Our LNG Projects The Philippines – LNG Hub Terminal and Power Station

  61. Slide 61: The Philippines – LNG Hub Terminal and Power Station

    Our LNG Projects The Philippines – LNG Hub Terminal and Power Station Pagbilao LNG Terminal: Pagbilao Hub Terminal § Terminal will act as a hub for onward distribution of LNG throughout the Philippines PHILIPPINES § Energy World Group will develop a CCGT power station at this site First LNG Terminal

  62. Slide 62: Quezon Province Developments

    QUEZON PROVINCE DEVELOPMENTS HON. RAFFY P. NANTES GOVERNOR QUEZON PROVINCE DELIVERING CLEAN HOTEL AND RESORT ENERGY FOR QUEZON LNG CARRIER VESSEL 300MW 300MW GAS FIRED FERRY PASSENGER POWER STATION TERMINAL ENERGY WORLD GROUP

  63. Slide 63: The Philippines - LNG Hub Terminal and Power Station

    Our LNG Projects The Philippines - LNG Hub Terminal and Power Station From left to right: Former Gov. Eduardo Rodriguez, Gov. Rafael P. Nantes, Secretary of DOE, Provincial Government of Quezon – Mr. Angelo T. Reyes, MD of EW Group – Mr. Stewart Elliott

  64. Slide 64: Ground Breaking Ceremony 28 August 2009

    Our LNG Projects The Philippines - LNG Hub Terminal and Power Station Ground Breaking Ceremony 28 August 2009

  65. Slide 65: LNG Hub Terminal Site Preparation

    Our LNG Projects The Philippines - LNG Hub Terminal Site Preparation

  66. Slide 66: LNG transport — sea shore navigation

    Oe) LNG transport — sea shore navigation

  67. Slide 67: Other Projects in the Philippines

    Other Projects in the Philippines Kanan B1 Hydro Electric Project

  68. Slide 68: Other Projects in the Philippines

    Other Projects in the Philippines Kanan Wind Farm Project F D E WINDFARM LOCATION (Phase 1) B C A

  69. Slide 69: Sri Lanka – Hambantota or Kerawalapitiya LNG Hub Terminal

    Our LNG Projects Sri Lanka – Hambantota or Kerawalapitiya LNG Hub Terminal 600MW Combined Cycle Gas Turbine Power Station (2 x 300MW) Power Station

  70. Slide 70: Sri Lanka – Hambantota or Kerawalapitiya LNG Hub Terminal

    Our LNG Projects Sri Lanka – Hambantota or Kerawalapitiya LNG Hub Terminal Hambantota or Kerawalapitiya LNG Hub Terminal: • This terminal will act as a hub for onward distribution of LNG throughout Sri Lanka • Energy World Group will develop a CCGT power station at this site • Substantial developmen

  71. Slide 71: Sri Lanka – Hambantota or Kerawalapitiya LNG Hub Terminal

    Our LNG Projects Sri Lanka – Hambantota or Kerawalapitiya LNG Hub Terminal

  72. Slide 72: Development of Floating Modular LNG

    Development of Floating Modular LNG LNG Storage Ship

  73. Slide 73: 3 Ship Solution for Floating LNG

    3 Ship Solution for Floating LNG Based on the standard Energy World Group LNG ship – Energy World Group developed 3 ship solution for Floating LNG. LNG Support Ship - Gas pretreatment and power generation is located on the first ship. LNG Liquefaction Ship - Liquefaction (2 x 500,000 TPA) trains the

  74. Slide 74: Development of Floating Modular LNG

    Development of Floating Modular LNG Gas Cleanup and Power Generation Ship ENERGY WORLD GROUP

  75. Slide 75: Development of Floating Modular LNG

    Development of Floating Modular LNG LNG Liquefaction Ship 2 x 500,000 TPA ENERGY WORLD GROUP

  76. Slide 76: Thank You!

    Thank You! 15 Feb 2010