Slide 1: Pushing the Boundaries of Uranium Exploration in North America
PUSHING THE BOUNDARIES OF URANIUM EXPLORATION IN NORTH AMERICA. C O R P O R AT E P R E S E N T AT I O N 2 0 2 6 CSE : COMT | OTC : CLLMF | FSE : TO1
Slide 2: Disclaimer
Disclaimer This material includes “forward-looking” statements or information within the meaning of Canadian securities legislation and the United States Private Securities Litigation Reform Act of 1995. Forward-looking statements relate to future events or the anticipated performance of Collective
Slide 3: About Us
About Us Collective Metals Inc. (CSE: COMT | OTC: CLLMF | FSE: TO1) is a resource exploration company specializing in critical and precious metals exploration in North America. The Company’s Rocas project comprises 4,002 hectares, located 75 kilometers southwest of the Key Lake Mine and Mill facilit
Slide 4: Investment Highlights
Year Round, Drill Ready Uranium Targets: Results from a high-resolution ground gravity survey completed in 2024 and a 2025 Prospecting Program highlight potential alteration halos and high-priority, drill-ready exploration targets along well-defined structural corridors, accessible year-round by exc
Slide 5: Uranium Market
Uranium Market The Investment Thesis for Uranium: § Structural supply deficits persist through 2030 even under aggressive supply expansion scenarios. § Policy-driven demand visibility has strengthened through legislative support for nuclear energy, reactor life extensions, and small modular reactor
Slide 6: Uranium Market: Supply Constraints and Security-of-Supply Premium
Uranium Market SUPPLY CONSTRAINTS, GEOGRAPHIC CONCENTRATION & THE SECURITY-OF-SUPPLY PREMIUM. Canada’s Strategic Importance: The uranium supply complex faces structural constraints that extend § Canada was the world's largest uranium producer for many years, accounting beyond simple production volum
Slide 7: Rocas Project Introduction
INTRODUCTION Rocas Project Introduction The Rocas project comprises 4,002 hectares, located 75 kilometers southwest of the Key Lake Mine and Mill facilities along Highway 914, and approximately 72 kilometers south of the present-day margin of the Athabasca Basin. The project was acquired via staking
Slide 8: Previous Work & Exploration Plans
ROCAS PROJECT Previous Work & Exploration Plans Previous Work Historical airborne EM work in 2017 defined conductive trends on the Project west of and sub-parallel to the Key Lake Road shear zone, corresponding with favorable metasedimentary basement lithologies. Multiple parallel conductors, offset
Slide 9: Strong Radioactivity On Surface
ROCAS PROJECT Strong Radioactivity On Surface The 2025 Prospecting Program at Rocas Identified Multiple Zones of Strong Radioactivity, unveiling: § Strong Radioactivity at Surface: Verification of strong radioactivity at multiple historical uranium showings, with several handheld scintillometer meas
Slide 10: Management & Board of Directors
Management & Board of Directors Christopher Huggins Devienne Mok Paul Chung Nick Standish CEO AND DIRECTOR CFO DIRECTOR DIRECTOR Christopher Huggins, B.Sc. (Honours Geology), is a Ms. Mok is a seasoned accounting and Mr. Paul Chung holds a Bachelor of Science Mr. Standish is a seasoned entrepreneur
Slide 11: Thank you.
Email: Thank you. info@collectivemetalsinc.com Location: Suite 409 –22 Leader Lane, Toronto, ON M5E 0B2, Canada. CSE : COMT | OTC : CLLMF | FSE : TO1 Collectivemetalsinc.com 11