    LEGAL DISCLOSURE This document was prepared by Ecopetrol S.A. (the “Company” or “Ecopetrol”) with the purpose of providing the market and interested parties certain financial and other information of the Company. This document may include strategy discussions and forward-looking statements regarding

  3. Slide 3: Best Financial Results of the Last Five Years

    BEST FINANCIAL RESULTS OF THE LAST FIVE YEARS 755 761 718 715 716 728 120 X=99 X=54 X=45 X=55 X=72 X=64 USD/Bl 45.4% 46.1% 100 EBITDA 41.8% Margin 37.1% 37.7% 34.7% 80 66.0 67.8 55.2 52.1 60 47.7 40 30.8 24.5 23.1 18.1 18.0 20 15.9 11.6 5.7 6.6 7.4 1.6 2.7 0 -3.9 2014 2015 2016 2017 2018 Jan-Mar 201

  4. Slide 4: Reserves Balance 2018

    RESERVES BALANCE 2018 CONTINUING ALONG THE GROWTH PATH Technical and Commercial Management Proven Added 260 MBOE Reserves 47 307 MBOE 1,659 239 57 74 1,727 129 The highest Reserve Replacement Ratio of the last 4 years 307 MBOE 129% Increase in the Average Reserve Life 7.2 years Balance 2017 Producti

  5. Slide 5: Solid Operating 1Q19 Results

    SOLID OPERATING 1Q19 RESULTS LEVERAGE OUR GOALS Production Midstream mboed Drilling campaigns 728 Crude volume transported 1Q2019 vs 1Q2018 10.6% Recovery Program 49% Lower number of attacks on oil pipeline infrastructure Commission of Experts submitted recommendations 1Q2019 vs 1Q2018 about unconve

  6. Slide 6: Strategy 2020+

    STRATEGY 2020+ VALUE CREATION AS AN INTEGRATED BUSINESS GROUP Existing fields Reserves and Production Growth Exploration Unconventional in Colombia Competitiveness and Sustainability Strict Capital Cash Protection Discipline and Cost Efficiency International 6

  7. Slide 7: Upstream

    Upstream

  8. Slide 8: 2019 Exploration Plan

    2019 EXPLORATION PLAN GUA OFF-1 SHORT AND MEDIUM TERM RESERVES ADDITION Seismic surveys: MILESTONES JAN-MAY 2019 2D 2,660km2 3D 167,262km2 Near-field Exploration COL-5 Boranda-2 +92,000 Km Jaspe-8 well (Success) near Quifa field Cira 7000 ST-1 Andina vs. 2018 Norte-1 Andina Norte-1 well (Success) ne

  9. Slide 9: Maturing Potential in Colombia 2019-2023

    MATURING POTENTIAL IN COLOMBIA 2019-2023 Jaspe Arrecife Andina Cosecha Lorito ONSHORE Appraisal plan to Oil discovery determine commerciality Near-field Exploration Gas discovery (Under evaluation for (Under evaluation (Under evaluation for commerciality) (1 well 2019 and 2 Fast-track incorporation

  10. Slide 10: Internationalization in High Prospective Basins

    INTERNATIONALIZATION IN HIGH PROSPECTIVE BASINS US Unconventionals • Projects under evaluation Options • Drivers: know how / short cycle access GoM - USA Mexico Brazil • K2, Gunflint and • Blocks 6 and 8 awarded position Current position Current position Current • Pre-salt blocks (Pau Brasil & Satur

  11. Slide 11: Ecopetrol Óleo e Gas do Brasil: Strategic Access to Brazilian Pre-Salt

    ECOPETROL ÓLEO E GAS DO BRASIL STRATEGIC ACCESS TO BRAZILIAN PRE-SALT BRAZIL – 2019-2021 Equatorial Margin: Technical evaluation of CEARÁ FOZ DO prospects and compliance of the AMAZONAS 200 km exploration commitments. 50% 100%  Foz de Amazonas: ECP 70% - JX Nippon* 30% POT- POTIGUAR More diversifie

  12. Slide 12: Production in Line with the Target

    PRODUCTION IN LINE WITH THE TARGET Key Fields Production (mboed) +3.9% +5% +6% +9% mboed 720- 114 121 109 116 720 728 64 70 701 730 LONDON Rubiales Castilla Chichimene 1Q 2018 1Q 2019 1Q 2018 2018 1Q 2019 2019E New field Gas field Recovery  Gas production increased 6.8% in 1Q 2019 versus 1Q pilot f

  13. Slide 13: Recovery Program: Significant Potential to Add Production and Reserves

    RECOVERY PROGRAM SIGNIFICANT POTENTIAL TO ADD PRODUCTION AND RESERVES Cumulative ECP could also take its expected proven reserve Gross potential volume recovery recovery factor to 24%* in 2021 factor 55.3 10.60 11.52 BBOE BBOE 19% 2.01 21% 2.01 23% 39.8 55.3 24% HCIIP** Cumulative production 10.6 19

  14. Slide 14: Recovery Program: Significant Potential to Add Reserves

    RECOVERY PROGRAM SIGNIFICANT POTENTIAL TO ADD RESERVES Potential Volume by 58 opportunities Technology Primary (PRIM) 12 Water Flooding (WF) 20 PRIM GAS Enhanced Oil Recovery(CEOR) 16 6% Gas Injection (GAS) 1 2% ICV Steam continuous Injection (ICV) CIS 7 13% 30% Combustion in-situ (CIS) 2 ~ 6,500 we

  15. Slide 15: Hydrocarbons Initially in Place (HCIIP)

    HYDROCARBONS INITIALLY IN PLACE (HCIIP) SYSTEMATIC REVIEW OF POTENTIAL Development in Lorito from the Development in the north of Suria based on understanding of Chichimene and Akacías results from Saurio 2 well  The Lorito area will allow us increase the HCIIP between 1.5 and  Saurio-2 well had o

  16. Slide 16: Primary, Secondary and Tertiary Recovery of Extra-Heavy Crude (Chichimene)

    PRIMARY, SECONDARY AND TERTIARY RECOVERY OF EXTRA-HEAVY CRUDE (CHICHIMENE FIELD) Current Target Recovery 6% 27% Historical Projection ~ 80 mboed Factor 90 of production 80 by 2021 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026+ 70 30K Plan 60 Primary Integral module MBOED recovery 50 40 WF pilot

  17. Slide 17: Recovery Program: Increased Number of Projects Meeting Portfolio Hurdle

    RECOVERY PROGRAM INCREASED NUMBER OF RECOVERY PROJECTS MEETING THE PORTFOLIO HURDLE Lowering break even of recovery project Increasing efficiency of water injection Barrels injected / barrels produced 2016 2017 2018 Break even (USD/bl) TECHNOLOGY PRIMARY WF CEOR CSI ISC WAG 2015 2016 2017 2018 2014

  18. Slide 18: Unconventional Potential

    Gas potential ~4 to 24 TCF UNCONVENTIONAL POTENTIAL Cesar - Ranchería CBM and Shale Gas potential (~10 TCFs Gas) Middle Magdalena Valley Catatumbo Shale Oil/Gas potential (4-7 BBO) Shale Oil potential (~ 4 - 13 TCFs Gas) (~ 0.2 - 1.4 TCFs Gas) Crude Middle Magdalena NGLs Valley Dry gas ~4 to 13 TCF

  19. Slide 19: Unconventional Development

    UNCONVENTIONAL DEVELOPMENT EXPECTED TIMELINE SUBJECT TO GOVERNMENTAL DECISIONS 2019 2020 2021 2022 ONWARDS TIMELINE* PHASE 2 PHASE 1 PHASE 3 Commission CAPEX of Experts 2019 - 2021 CE Protocol of the Social-Environmental (CE)* Report MME on CE baseline Up to US$0.5 B State DEVELOPMENT Council* Relea

  20. Slide 20: Downstream

    mk bert iat Down stream

  21. Slide 21: Downstream: Capturing Value from Current Assets

    23% DOWNSTREAM CAPTURING VALUE FROM CURRENT ASSETS Throughput (MBD) Throughput composition - Cartagena 215 222 215 221 223 229 203 201 196 147 145 153 158 150 155 39% 42% 49% 123 136 136 66% 71% 79% 80% 77% 87% 61% 58% 51% 34% 29% 21% 20% 23% 13% 1Q 17 2Q 17 3Q 17 4Q 17 1Q 18 2Q 18 3Q 18 4Q 18 1Q 19

  22. Slide 22: Strategy to Face MARPOL 2020

    STRATEGY TO FACE MARPOL 2020 OPPORTUNITIES AND CHALLENGES Upstream Downstream Seek market 1 opportunities for high- value products (diesel Refineries Feedstock: Production Portfolio: IPCC* 40% and light crudes). Greater production of light Interconnection in Greater throughput of light crudes Refica

  23. Slide 23: Midstream

    Midstream Transporte Picture: ODL

  24. Slide 24: Midstream: Higher Efficiency and Optimization of Transportation Systems

    MIDSTREAM HIGHER EFFICIENCY AND OPTIMIZATION OF TRANSPORTATION SYSTEMS  Maintain profitability Priorities  CAPEX for growth (support refined products demand) Transported Volume Revenue 2019 - 2021  Transported volumes: 1,100 – 1,250 mbd  EBITDA Margin: 75%-80% +12% MBOD +7% COP Tn 272 260 3.05 2

  25. Slide 25: Financial Results

    Financial Results Resultados Excepcionales

  26. Slide 26: Financial Results

    FINANCIAL RESULTS FOCUSED ON PROFITABLE GROWTH 26 *Ebitda calculated for the last twelve months **Normalized TRM; ***ROACE = Operating income after taxes / Capital employed (Figure in pesos)

  27. Slide 27: 2019 Investment Progress

    2019 INVESTMENT PROGRESS IMPROVED EXECUTION LEVEL AND MAINTAINING CAPITAL DISCIPLINE CHANGE IN INVESTMENT TREND SUPPORTED ON HIGHER ACTIVITY 2019 Target # RIGS DEVELOPMENT MUSD $3.5 - $4.0 WELLS 700 USD Bn +35% 38 579 500 2019 28 Target # Wells 647 6 33 151 262 85 +59% 29 2016 2017 2018 Jan-May 2019

  28. Slide 28: Efficiencies: Leveraging Sustainable Growth

    EFFICIENCIES LEVERAGING SUSTAINABLE GROWTH LIFTING COST DILUTION COST (USD/Bl) 20.0% (USD/Bl) Benchmark* 9.7 Dilution 6.7 14.8% 14.8% 14.6% 14.8% 1Q 19 8.72 14.2% Factor 4Q 18 9.22 5.3 4.9 4.6 3Q 18 8.74 3.7 2Q 18 8.47 3.9 1Q 18 8.09 2014 11.2 2014 1Q 18 2Q 18 3Q 18 4Q 18 1Q 19 FINDING & DEVELOPMENT

  29. Slide 29: New Savings Target of US$2.6 Billion Between 2019-2023

    THE GROUP HAS SET A NEW SAVINGS TARGET OF US$ 2.6 BETWEEN 2019 -2023 Cumulative Efficiencies of the Group Continuing with the Transformation 2015-2023 BUSD Structural savings focused on improving revenues, costs and investments 5.9 Ensure the operation prioritizing care for our workers, the 1.9 envi

  30. Slide 30: Continuing with the Transformation: Strategic Priorities

    CONTINUING WITH THE TRANSFORMATION STRATEGIC PRIORITIES Exploration Corporate & Digital Agenda • Regional competitive practices • Projects procurement • Greater synergies between • Digital Transformation- First Group’s subsidiaries Phase (10 projects) Enhancing our Midstream • Operative Model 5% cap

  31. Slide 31: Digital and Technological Transformation Could Generate Up to US$1.0 B EBITDA

    DIGITAL AND TECHNOLOGICAL TRANSFORMATION COULD GENERATE UP TO US$1.0 B EBITDA PER YEAR … with investments of ~US$120 M … with potential generation of More than 40 initiatives… in the first wave EBITDA up to US$1.0 B per year Upstream Upstream ~0.65 – 0.75 Midstream Midstream ~0.15 – 0.2 Downstream D

  32. Slide 32: ESG Ensures the Group's Sustainability

    ESG* ENSURES THE GROUP´S SUSTAINABILITY Stakeholders ENVIRONMENTAL MANAGEMENT SOCIAL-ENVIRONMENTAL INVESTMENT Education, Integral water management ~US$ 0.7 B(1) health and sports Environmental Investment management Rural inclusive Biodiversity development Climate change Entrepreneurship Social- Envi

  33. Slide 33: Energy Transition

    ENERGY TRANSITION FOCUSED ON EFFICIENT CONSUMPTION AND INCORPORATION OF RENEWABLE SOURCES INTO THE ENERGY MATRIX ENERGY EFFICIENCY SELF-GENERATION RENEWABLE ENERGIES Energy cost savings Group (1) Additional self-generation capacity Incorporation of renewable energies US$ M MW MW 2019-2021 PLAN -17%

  34. Slide 34: Self-Funded Capex Plan Under Strict Capital Discipline Criteria

    SELF-FUNDED CAPEX PLAN UNDER STRICT CAPITAL DISCIPLINE CRITERIA 1% Other 2% Corporate CAPEX plan 2019 – 2021 (US$ B) Downstream 7% Sustainability and Value Capture 100% Midstream Organic 12 -15 US$ B Investment Profitable growth Upstream 34

  35. Slide 35: 2019-2021 Targets

    2019-2021 TARGETS SUSTAINABILITY, GROWTH AND INTEGRATED PRODUCTION 2021 VALUE CREATION 750 – 770 mboed CAPEX ROACE** US$12 – 15 B Above 11% TRANSPORTED VOLUME 1,100 – 1,250 mbd Cumulative Free Cash Flow Gross debt/EBITDA US$12 B 1.0 – 1.5 X REFINING THROUGHPUT 370 – 400 RRR* (excluding price effect)

  36. Slide 36: Energy for the Future

    octterrou ENERGY FOR THE FUTURE Ecopetrol S.A. All rights reserved. The re production of this presentation is forbidden without the written authorization of Ecopetrol S.A.