  1. Slide 1: 2012 Annual Results Presentation

    2012 Annual Results Presentation 11th March 2013

  2. Slide 2: Preface

    Preface This presentation, which is confidential and is being supplied in the United Kingdom only to persons with professional experience in matters relating to investments for the purposes of the Financial Services and Markets Act 2000, does not constitute or form part of any offer or invitation to

  3. Slide 3: 2012 Operational Highlights

    2012 Operational Highlights Consolidated the Group’s interests in South East Asia portfolio with the $95m acquisition of the outstanding 20% interest in SOCO Vietnam Ltd Record Group net entitlement production volumes of ~15,500 BOEPD (2011: 6,730 BOEPD), a rise of 130% Additional production brought

  4. Slide 4: 2012 Financial Highlights (from continuing operations)

    2012 Financial Highlights (from continuing operations) Record revenue of $621.6m (2011: $234.1m), a rise of 166% 134% increase in after tax profits from continuing operations to $207.0m (2011: $88.6m) 271% increase in operating cash flow to $334.8m (2011: $90.2m) Cash, cash equivalents and liquid in

  5. Slide 5: 2012 Financial Summary (audited)

    2012 Financial Summary (audited) (from continuing operations, US$ million, unless otherwise indicated) 2012 2011 Sales revenue 621.6 234.1  Net Entitlement Production 15,500 boepd vs 6,700 boepd Cash, Equivalents & Liquid Invest 307.6  Realisations $118/bbl vs $113/bbl Operating profit 448.2 156.9

  6. Slide 6: Operations

    Operations 6

  7. Slide 7: Central Vietnam Offshore Basins and Licences Awards

    Central Vietnam Offshore Basins and Licences Awards ENI BL 114 EXXON BL 117 EXXON BL 118 EXXON BL 119 ENI MURPHY BL 120 BL 144 ORIGIN MURPHY BL 121 BL 145 SANTOS BL 123 PVEP BL 148 PVEP BL 149 MITRA BL 127 ONGC BL 128 7

  8. Slide 8: Vietnam—Cuu Long Basin Blocks

    Vietnam—Cuu Long Basin Blocks Acquired 20% non- controlling interest in SOCO Vietnam for $95 million TGT is largest development project in Company’s history; H4-WHP brought on- stream one month early, but one year TGT 30.5% WI ahead of original FDP CNV 25% WI Production averaged above 52,000 BOPD si

  9. Slide 9: CNV Field

    CNV Field Fractured granitic Basement field Producing at steady ca. 8,000 boepd Finalising calibration of additional separation and metering facilities Additional production well planned for 2013 – expected to add ca. 3- 5,000 boepd 9

  10. Slide 10: Te Giac Trang Field Layout

    Te Giac Trang Field Layout FPSO‐TGT 1 H1‐WHP FPSO Storage Capacity: 4 x 10” Multiphase Pipelines 620,000 BBLS 10” Water Injection Pipeline Processing Capacities: 8” Gas‐lift Pipeline Crude oil rate 55,000 BOPD Produced water rate 75,000 BWPD 1.8 km PLEM MWJ SSIV ~ 7 km 1 x 8” Gas‐export Pipeline H4‐

  11. Slide 11: TGT 2013 Well Locations

    TGT 2013 Well Locations TGT-17P H1 WI/Appraisal H3 Appraisal H2 South Appraisal H5 Appraisal 11

  12. Slide 12: Preparation for 2014 Well Campaign

    Preparation for 2014 Well Campaign 2014 initial well locations: • WI in H.1.1/H1.2 Block • WI in H4 Block • TGT-H2S App or H2 2nd Dev 12

  13. Slide 13: Independent Confirmation of TGT Resources

    Independent Confirmation of TGT Resources Range (low to high case) STOIIP (mmstb) 470 960 1 Recoverable Gas (mmboe) 15 30 Future activities will significantly de-risk high case Additional 10 infield and step out wells (e.g. H5 (50-150 mmstb)) planned in 2013-14 Continued drilling beyond 2014 Gas con

  14. Slide 14: Supporting Higher TGT Recovery Factors

    Supporting Higher TGT Recovery Factors Range (low to high case) Independent Estimate 28% 35% SOCO Estimate 32% 50% Reservoir quality and reservoir geometry in TGT’s individual sands supports SOCO recovery factor estimates: Relatively thin but continuous sands, less risk of water bypass and therefore

  15. Slide 15: West to East Cross Section

    West to East Cross Section TGT‐3P TGT‐16P TGT‐2X TGT‐7P TGT‐1P TGT‐15P TGT‐5P TGT‐2P West East Water Cut 60% 30% 0% 35% 5.2 Upper Aquifer Support 5.2 Lower Olig-C TGT‐H1‐5P TGT‐H1‐1P TGT‐H1‐2P TGT‐H1‐16P TGT‐H1‐3P TGT‐H1‐15P TGT‐2X TGT‐H1‐7P H1 Platform Aquifer Support TGT‐1X TGT‐H1‐6P TGT‐H1‐4P TGT

  16. Slide 16: TGT Activities to deliver Performance Reserves

    TGT Activities to deliver Performance Complete FPSO sustained capacity test (beyond 55,000 bopd) Calibrate process simulation model for early debottlenecking Enhance production management techniques Focus on individual sand perforation plans and timing Reserves Upgrade full field simulation for high

  17. Slide 17: Central African Portfolio

    Central African Portfolio 17

  18. Slide 18: North Congo Basin—Current Portfolio

    North Congo Basin—Current Portfolio 100% WI Added Nanga II A block and commencing seismic reprocessing 40.39% WI Preparing to drill Lideka East on Marine XI in 2H13 Have a non- refundable deposit 17% WI to sell Cabinda to minority partner 65% WI Completing seismic reprocessing for drill or drop deci

  19. Slide 19: Cabinda North

    Cabinda North Selling entire equity in two stage disposal deal Initial non-refundable deposit received Expect completion by end March 19

  20. Slide 20: Marine XI—Lideka East + Prospects and Discoveries

    Marine XI—Lideka East + Prospects and Discoveries Estimated mean predrill recoverable resources c. 70 mmbbl in primary target Sendji formation COS 40% Estimated mean upside recoverable resources c. 60 mmbbl in secondary formations Preparing for expected drilling 2H13 20

  21. Slide 21: Nganzi Block

    Nganzi Block Ongoing seismic depth reprocessing of two vintages of 2D “time” seismic to validate existing Leads and Prospects Obtained 6 month PSC extension Drill or Drop decision to be made by September 2013. If drill, then need to relinquish 50% of block 21

  22. Slide 22: Block V Activity

    Block V Activity Completed detailed environmental study together with relevant DRC authorities Activity suspended during M23 insurgency With Peace Accord signature, targeted to resume Aeromag acquisition in May-June Block V 85% WI 2013 Target decision on Block V 85% WI seismic acquisition in Septemb

  23. Slide 23: Drilling Schedule & Potential Reserve Implication

    Drilling Schedule & Potential Reserve Implication 2013 Potential March April May June July August Sept Oct Nov Dec Reserves Vietnam 40 ‐ 80 4 Infield wells +TGT‐H5 Congo (Brazzaville) 60 ‐ 130 Lideka East Marine DR Congo Contingent Well 1 Contingent Well 2 23

  24. Slide 24: Conclusion & Outlook

    Conclusion & Outlook 24

  25. Slide 25: Outlook

    Outlook Continued strong cash generation from the Vietnam assets Development drilling on TGT and CNV Appraisal well on the previously undrilled TGT H5 block Sustained capacity test on TGT FPSO pending Exploration drilling on Lideka Marine East Well 1 (Republic of Congo) in 2H13 2013 return of capita

  26. Slide 26: Going Forward into 2013 and Beyond

    Going Forward into 2013 and Beyond Very strong financially and will be generating more cash with stable production of ca. 16,000 boepd. Offers more options in enhancing shareholder value through development of the current portfolio adding new ventures consistent with our current and historical focus

  27. Slide 27: SOCO International plc