Anglo American Plc · LSE:AAL

Anglo American — H1 2016 Earnings Presentation

45 slides from Anglo American's earnings presentation, Jul 28, 2016

  1. Slide 1: Interim Results, Six Months Ended 30 June 2016

    INTERIM RESULTS SIX MONTHS ENDED 30 JUNE 2016 28th July 2016

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT Disclaimer: This presentation has been prepared by Anglo American plc (“Anglo American”) and comprises the written materials/slides for a presentation concerning Anglo American. By attending this presentation and/or reviewing the slides you agree to be bound by the following con

  3. Slide 3: H1 Results 2016 – Business Performance

    H1 RESULTS – 2016 BUSINESS PERFORMANCE Mark Cutifani

  4. Slide 4: Committed to Delivering the New Anglo American

    COMMITTED TO DELIVERING THE NEW ANGLO AMERICAN Core portfolio of De Beers, PGMs and Copper  Global leadership in diamonds and platinum and a high quality copper business.  World class portfolio of competitively positioned assets. Positive free cash flow expected in 2016 at spot prices and FX  Del

  5. Slide 5: Safety & Environment

    SAFETY & ENVIRONMENT Safety: Loss of life and TRCFR(1) SAFETY 1.1  Regrettably, 6 fatalities in H1 2016. 0.9 15 0.8 0.8  South African businesses focused on “critical controls” and consistent application of safe 5 operating standards. 1 3 6 6 6 1 1 1 2  Total recordable injuries lowest on record

  6. Slide 6: Operating Performance – Group Production

    OPERATING PERFORMANCE – GROUP PRODUCTION BROADLY FLAT Production: H1 2016 versus H1 2015 (% change) 72% Sales volume +29% 2% (2)% (1)% (4)% (5)% (9)% (15)% De Beers(1) Export Iron Ore (3) Copper (4) Met Coal Platinum (5) Nickel Group thermal coal(2) Cu. Equivalent Core Core Core (1) De Beers product

  7. Slide 7: Operating Performance – Unit Costs 19% Lower

    OPERATING PERFORMANCE – UNIT COSTS 19% LOWER(1) DE BEERS (US$/ct) PLATINUM (US$/Pt oz) COPPER (C1 USc/lb) -21% -21% -18% Core 82 1,603 166 65 1,262 136 H1 2015 H1 2016 H1 2015 H1 2016 H1 2015 H1 2016 KUMBA (FOB US$/t) AUSTRALIAN COAL (US$/t) SA COAL EXPORT (US$/t) -18% -21% -14% Non-core 33 58 42 27

  8. Slide 8: Headcount – The Pace of Change Continues

    HEADCOUNT – THE PACE OF CHANGE CONTINUES… Employee and contractor numbers Support Non core -40% Operations Core 162,000 151,000 13,000 128,000 11,500 120,000 10,500 98,000 98,000 9,300 40,800 57,200 ~50,000 2013 2014 2015 H1 2016 H1 2016 H1 2016 Target After announced disposals (1) 8 (1) Reflects Ni

  9. Slide 9: Productivity Drives Cost Reductions

    PRODUCTIVITY DRIVES COST REDUCTIONS Cu Equivalent production, unit cost & productivity 160 140 120 112 100 80 60 40 2012 2013 2014 2015 FY16F Cu Equiv Production Index(1) (1) Calculated using long-term consensus parameters. Excludes domestic/cost-plus production. (2) Unit cost includes only AA’s equ

  10. Slide 10: A More Focused and Higher Margin Portfolio

    A MORE FOCUSED AND HIGHER MARGIN PORTFOLIO Number of mining operations H1 2016 EBITDA Margin (%)(2) -26 70 68 -26 45 42 33% 35 23% 16 0 2013 2015 H1 2016 Core Non-Core Assets Core Assets After announced disposals(1) Coal Copper Nickel Iron Ore Platinum De Beers N&P (1) Reflects Niobium & Phosphates,

  11. Slide 11: H1 2016 – Financials

    H1 2016 – FINANCIALS René Médori

  12. Slide 12: H1 2016 Results

    H1 2016 RESULTS Key financials H1 H1 H1 H1 $bn Change $bn Change 2016 2015 2016 2015 Underlying EBITDA 2.5 3.3 (25)% Capital expenditure(2) 1.2 2.0 (42)% Underlying EBITDA – Core 1.4 1.8 (21)% Attributable free cash flow(3) 1.1 0.2 500% Underlying EBITDA – Non-core 1.1 1.5 (31)% Net debt(4) 11.7 12.

  13. Slide 13: H1 2016 EBIT Variance

    H1 2016 EBIT VARIANCE H1 2016 vs. H1 2015 ($bn) (1.2) De Beers volumes: +$0.2bn Offset by: (0.3) Copper and Kumba: $(0.2)bn Bulks (0.3) 0.3 (0.1) 0.0 (0.9) 0.9 1.9 Base & Precious 1.4 1.2 H1 2015 Price(1) Currency Inflation(2) Pt stock Sales Volume(4) Cash costs H1 2016 adjustment(3) (1) Price varia

  14. Slide 14: Group Capital Expenditure and Net Debt

    GROUP CAPITAL EXPENDITURE AND NET DEBT Net debt ($bn)(1) Capital expenditure ($bn)(2) Opening net debt – 1 January 2016 12.9 6.0 Previously <$3.0bn, Cash flow from operations (2.2) with $0.3bn reclassified from Working capital optimisation (0.5) cost/volume EBIT Capital expenditure(2) 1.2 3.3 improv

  15. Slide 15: Active Working Capital Management

    ACTIVE WORKING CAPITAL MANAGEMENT Working capital ($bn) INVENTORY REDUCTION -0.5  De Beers rough diamond inventory sell-down 3.8  Draw-down on Kumba inventories  Platinum refined recovery 0.7 De Beers sales vs. KIO finished stock Platinum total stock production (100%) (Mt) (koz)(1) 3.3 (Mct) 4.7

  16. Slide 16: Strong Liquidity Position Maintained

    STRONG LIQUIDITY POSITION MAINTAINED Gross debt ($bn) Bond maturity profile ($bn)(1) -12% 19.8 0.9 17.5 0.7 0.2 2.5 1.9 0.9 2015 H1 2016 H2 2016 2017 2018 Gross debt including derivatives Bonds outstanding Bonds bought back(2) Liquidity headroom ($bn) Credit rating (Ba3 positive/BB stable) +6%  Moo

  17. Slide 17: Announced $1.5bn of Our $3-4bn 2016 Disposal Target

    ANNOUNCED $1.5BN OF OUR $3-4BN 2016 DISPOSAL TARGET More advanced Transactions announced Rustenburg Australian Coal (Callide, Dartbrook, Foxleigh) Some combination of these Niobium & Phosphates is expected to contribute to the $3-4bn target for 2016. Moranbah & Grosvenor Nickel SA Coal - Domestic Ce

  18. Slide 18: Commitments versus February 2016 Results Day

    COMMITMENTS VERSUS FEBRUARY 2016 RESULTS DAY Feb 2016 2016 $bn Today results day Net debt (31 Dec 2016) On track <10bn  2016 Group EBITDA On track 4.8  Cost/Volume improvement Of the original $1.9bn, $0.3bn has 1.6 1.9  been reclassified as a capital saving 2016 Capex 2.5 to 2.7 <3.0  Attributab

  19. Slide 19: New Anglo American

    NEW ANGLO AMERICAN

  20. Slide 20: Platinum

    PLATINUM Realised Underlying Production Unit cost Capex ROCE Pt sales Headcount Basket price EBIT H1 2016 1,153 koz $1,632/oz $1,262/oz $134m $125m 6% 1,221 koz 44,314 vs. H1 2015 +2% -24% -21% -51% -30% -1pp +5% -3% Underlying EBIT ($m) PERFORMANCE 272  Portfolio restructuring, headcount reduction

  21. Slide 21: De Beers

    DE BEERS Realised Underlying Sales Average Production(1) Unit cost(2) Capex ROCE price EBIT (Cons.) price index H1 2016 13.3Mct $177/ct $65/ct $585m $240m 7% 17.2Mct 117 vs. H1 -15% -14% -21% +2% -34% -5pp +29% -16% 2015 Underlying EBIT ($m) PERFORMANCE 576 585  Higher rough diamond sales volumes,

  22. Slide 22: Copper

    COPPER Realised Underlying Material Production C1 unit cost Capex ROCE Sales price EBIT mined H1 2016 291kt 215c/lb 136c/lb $113m $238m 6% 138Mt 281kt vs. H1 2015 -18%(1) -15% -18% -35% -23% +1pp -31% -18% Underlying EBIT ($m) PERFORMANCE 174  Volumes lower due to expected lower grades at Los Bronc

  23. Slide 23: Los Bronces Received ~15 Metres of Snow in 12 Months

    LOS BRONCES RECEIVED ~15 METRES OF SNOW IN 12 MONTHS Los Bronces snow fall (metres): 2015 / 2016 versus 30 year average 3.6 Last 5 2.9 30 year years 2015/16 average average 1.9 Snow fall (metres) 14.5 6.8 4.7 1.7 1.6 1.5 1.1 0.2 0.1 0.0 0.0 0.0 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16

  24. Slide 24: Nickel

    NICKEL Realised C1 unit Underlying Barro Alto ore Production(1) Capex ROCE Sales(1) price cost(2) EBIT feed H1 2016 22.3kt 387c/lb 323c/lb $(12)m $14m (1)% 21.9kt 1.2Mt(3) vs. H1 2015 72% -33% -35% -100% 182% -1pp 36% 103% Barro Alto C1 unit cost (USc/lb) PERFORMANCE -44%  Production and sales up s

  25. Slide 25: Coal

    COAL Export FOB price prod. Unit cost Underlying SA UG – OEE(3) Grasstree met / Capex ROCE met / met / thermal(2) EBIT benchmark LW cutting rate thermal(1) thermal 10.0Mt / H1 2016 $77/t / $50/t $50/t / $33/t $160m $274m 9% 63% 2,370t/hr 15.7Mt vs. H1 2015 -2% / -9% -23% / -17% -14% / -21% -40% -34%

  26. Slide 26: Kumba

    KUMBA Realised Unit cost Underlying Production Capex ROCE Sishen waste Export sales price (FOB) (FOB) EBIT H1 2016 17.8Mt $55/t $27/t $387m $84m 37% 65Mt 18.1Mt vs. H1 2015 (21)% (10)% (18)% (25)% (69)% +5pp (40)% (22)% Underlying EBIT ($m) PERFORMANCE  Sishen reconfigured and restructured to a low

  27. Slide 27: Minas-Rio

    MINAS-RIO Realised price Unit cost Underlying Production Capex ROCE Sales (FOB) (FOB)(1) EBIT H1 2016 6.8Mt (wet) $44/wmt $32/wmt $(10)m $137m (1)% 6.9Mt vs. H1 2015 127% (12)% (63)% 9% (75)% - 165% Product - (Mt - wet) PERFORMANCE 15-17  Ramp up progressing albeit challenges with constrained pit a

  28. Slide 28: Longer-Term Improvement

    LONGER-TERM IMPROVEMENT AREAS OF FOCUS 1. Business Restructuring ...portfolio changes further improve delivery. 2. Operating Model …continuing efficiency improvements. 3. Innovation and Step Changes  Grade concentration – pre-concentrating run of mine ore to improve grade into our concentrators. 

  29. Slide 29: Committed to Delivering the New Anglo American

    COMMITTED TO DELIVERING THE NEW ANGLO AMERICAN  Core portfolio of De Beers, PGMs and Copper  Positive free cash flow in 2016 at spot prices and FX  Non-core portfolio of bulks and minerals managed for cash or disposal  Net debt reduced by $1.2bn, before disposals 29

  30. Slide 30: Appendix

    APPENDIX

  31. Slide 31: 2016 EBIT Improvement Progressing

    2016 EBIT IMPROVEMENT PROGRESSING Incremental EBIT improvement ($bn) - 2016 1.9 Costs ($bn) 2016 0.3 Operating efficiencies 0.6 1.6 Contract negotiations 0.2 Labour 0.2 Costs 1.2 Exploration 0.1 0.9 Other (0.2) Total cost improvement 0.9 Volume and other ($bn) 2016 Volume 0.7 0.7 De Beers, Nickel, N

  32. Slide 32: Negative Free Cash Flow Being Minimised

    NEGATIVE FREE CASH FLOW BEING MINIMISED Assets – operating free cash flow 2016F (1)(2) 16th February 2016 – 8 negative assets $0.2bn(2) PRC Placed on care and maintenance. Drayton Cease mining activities by end of 2016. Closure / C&M Snap Lake Placed on care and maintenance. Twickenham Placed on car

  33. Slide 33: Balanced Portfolio Exposure

    BALANCED PORTFOLIO EXPOSURE Core EBITDA by commodity (pro forma 2016)(1) EBITDA by demand driver (pro-forma 2016) Platinum 27% 15% Diamonds 43% Infrastructure 26% 30% Copper Core revenue by destination (pro forma 2016)(2) Consumer 49% 77% RoW North America 19% 21% Industrial 11% EU 14% Energy 12% 29

  34. Slide 34: De Beers – Best Assets in Attractive Commodity

    DE BEERS – BEST ASSETS IN ATTRACTIVE COMMODITY Diamond mining industry margin curve UPSTREAM LEADERSHIP Ratio of C1 costs plus SIB to revenue  Best-in-class mining assets – large, long-life, 1.2 and scalable. De Beers Assets 1.0  Strong government partnerships – Botswana 0.8 and Namibia. 0.6 0.4 

  35. Slide 35: Platinum – Best Platinum Portfolio

    PLATINUM – BEST PLATINUM PORTFOLIO Platinum net cash cost curve – 2015(1) PLATINUM LEADERSHIP  The Tier 1 portfolio of assets. Net cash cost (US$/Pt oz) AAP Mines/JVs for exit Unki Modikwa  Mogalakwena lowest-cost primary producer. By-product Mototolo  Scalable production base with long life. Ama

  36. Slide 36: Copper – Highly Competitive Position with Growth

    COPPER – HIGHLY COMPETITIVE POSITION WITH GROWTH Top 10 Producing Mines (2015 Cu kt) WORLD CLASS ASSETS Escondida Morenci  Attractive combination of scale, life and Collahuasi cost positions. Chuquicamata El Teniente  Extensive high-quality resources underpin organic Los Bronces Los Pelambres grow

  37. Slide 37: Attractive Outlook for Diamonds, PGMs and Copper

    ATTRACTIVE OUTLOOK FOR DIAMONDS, PGMS AND COPPER Diamonds PGMs Copper  Growth in demand is linked to  Demand Pt flat at ~8Moz, Pd  Demand (+2.2% p.a.) to ~27Mt economic growth and consumer grows (~3% pa) to 11.7Moz by by 2025. desire for diamond jewellery. 2025 - deficits in near term. • Broad ra

  38. Slide 38: Production Outlook

    PRODUCTION OUTLOOK(1) 2015 2016F 2017F 2018F Copper (2) 709kt 570-600kt 570-600kt 630-680kt Previously 600-630kt Previously 590-620kt Nickel 30kt 45-47kt 42-45kt 45-47kt Iron ore (Kumba)(3) 45Mt ~39Mt ~40Mt ~40Mt Iron ore (Minas-Rio) 9Mt 15-17Mt 19-21Mt 22-24Mt Previously 15-18Mt Metallurgical coal

  39. Slide 39: Towards Dry Tailings

    TOWARDS DRY TAILINGS Reducing water consumption and creating dry disposal – eliminating wet tailings  Water efficiency is a step-change opportunity: • efficiency enables increased throughput • facilitates stakeholder license to expand and develop new mines in water-stressed areas • reduces safety a

  40. Slide 40: Concentrating the Mine

    CONCENTRATING THE MINE Driving throughput, reducing waste, increasing metal output  Reduce processing of waste ore: • frees up plant capacity • reduces energy and other consumable costs  Technology approaches: • increase plant throughput through improved ore fragmentation • increase head grade • r

  41. Slide 41: Transforming Hard Rock Mining

    TRANSFORMING HARD ROCK MINING Continuous underground mining: improving safety and productivity  Continuous mining provides opportunity to increase safety, stability and reduce variability • less damage to hanging wall, therefore less risk of fall of ground • removing people from danger • faster shi

  42. Slide 42: Sishen Mine – Improved Run Rates Expected H2 2016

    SISHEN MINE - IMPROVED RUN RATES EXPECTED H2 2016 Sishen mine – tonnes mine per day  New mine plan implemented  Substantial workforce restructuring completed largely through voluntary separation  Significant improvement in productivity post restructuring as achieved in June  Run rates in 2H16 ex

  43. Slide 43: Debt Maturity Profile at 30 June 2016

    DEBT MATURITY PROFILE AT 30 JUNE 2016 Debt repayments ($bn) at 30 June 2016 3.5 2.9 2.3 2.1 1.9 1.8 2.0 1.0 H2 2016 2017 2018 2019 2020 2021 2022 2023+ BNDES Subsidiary Euro Bonds US$ Bonds Other Bonds De Beers Financing Financing % of portfolio 49% 28% 8% 11% 3% 1% Capital markets 85% Bank 15% US b

  44. Slide 44: Earnings Sensitivities for H1 2016

    EARNINGS SENSITIVITIES FOR H1 2016(1) Sensitivities Analysis Impact of change ($m) Commodity / Currency Change in price / exchange Achieved EBIT Iron Ore $10/t 52 249 Hard Coking Coal(2) $10/t 79 59 Thermal Coal (RSA) $10/t 50 90 Thermal Coal (Australia) $10/t 47 21 Copper(3) 10c/lb 215 61 Nickel(4)

  45. Slide 45: Spot Pricing and Foreign Exchange Assumptions

    SPOT PRICING AND FOREIGN EXCHANGE ASSUMPTIONS Sensitivities Analysis Commodity / Currency Spot at 19th July 2016 Iron Ore ($/t) 56 Hard Coking Coal ($/t) 93 Thermal Coal (RSA) ($/t) 62 Thermal Coal (Australia) ($/t) 61 Copper (c/lb) 224 Nickel (c/lb) 479 Platinum ($/oz) 1,086 Palladium ($/oz) 648 Rh

Anglo American — H1 2016 Earnings Presentation on 6ix