Slide 1: Building Mines, Building Value
BARRICK GOLD CORPORATION Merrill Lynch – Global Metals, Mining and Steel Conference Boston – May 11-13, 2004 Building Mines, Building Value FORWARD LOOKING STATEMENT Certain statements included herein, including those regarding production, costs, development schedules and other statements that expre
Slide 2: Gold Price Performance
BARRICK GOLD CORPORATION Merrill Lynch – Global Metals, Mining and Steel Conference Boston – May 11-13, 2004 Gold Price Performance 425 “Sustainable gold rally” 400 375 350 325 300 275 2002 2003 2004 Leverage to Gold Reserves: 86 M oz (proven & probable) Resources: 25 M oz (measured & indicated)
Slide 3: Silver Exposure / Asset Base – Mines and Projects
BARRICK GOLD CORPORATION Merrill Lynch – Global Metals, Mining and Steel Conference Boston – May 11-13, 2004 Silver Exposure Tremendous leverage to silver prices Will produce about 17 M oz of silver in 2004 835 million ounces of contained silver in gold reserves One of the world’s largest si
Slide 4: Growth Profile – Target Production 2004-2007
BARRICK GOLD CORPORATION Merrill Lynch – Global Metals, Mining and Steel Conference Boston – May 11-13, 2004 NORTH AMERICA Eskay Creek Geopolitical Hemlo Holt-McDermott Diversity Meikle Betze-Post 2004E 2003 Round Mt. PRODUCTION RESERVES 28% 60% 44% 15% SOUTH AMERICA EAST AFRICA 13% 20% 13% 7% Tulaw
Slide 5: Building Mines – Veladero, Argentina
BARRICK GOLD CORPORATION Merrill Lynch – Global Metals, Mining and Steel Conference Boston – May 11-13, 2004 Building Mines – Veladero, Argentina POTENTIAL Gold reserves: 11.1 M oz Production E: 525–550,000/yr Average cash cost est: $155–165/oz (subject to exchange rate fluctuations and applic
Slide 6: Veladero Project – Camp and Administration
BARRICK GOLD CORPORATION Merrill Lynch – Global Metals, Mining and Steel Conference Boston – May 11-13, 2004 Veladero Project – Camp and Administration Building Mines Building Value Veladero Project – Truck Shop Building Mines Building Value 6
Slide 7: Veladero Project – Fleet Assembled, Stripping Commenced
BARRICK GOLD CORPORATION Merrill Lynch – Global Metals, Mining and Steel Conference Boston – May 11-13, 2004 Veladero Project – Fleet Assembled, Stripping Commenced Building Mines Building Value Waste Veladero / Pascua-Lama Pascua-Lama Pit Waste Pit CHILE ARGENTINA Waste Filo Federico Pit Amable Pit
Slide 8: Building Mines – Lagunas Norte, Peru
BARRICK GOLD CORPORATION Merrill Lynch – Global Metals, Mining and Steel Conference Boston – May 11-13, 2004 Building Mines – Lagunas Norte, Peru Alto Chicama District POTENTIAL Gold reserves: 7.2 M oz Production est: 535–560,000/yr Average cash cost est: $135–145/oz PLAN Open pit - crushing
Slide 9: Building Mines – Cowal, Australia / Tulawaka, Tanzania
BARRICK GOLD CORPORATION Merrill Lynch – Global Metals, Mining and Steel Conference Boston – May 11-13, 2004 Building Mines – Cowal, Australia POTENTIAL Gold reserves: 2.5 M oz Gold resources: 1.6 M oz Production est: 220–230,000/yr Average cash cost est: $230–245/oz PLAN Open pit - CIL
Slide 10: Reserve Development and Replacement
BARRICK GOLD CORPORATION Merrill Lynch – Global Metals, Mining and Steel Conference Boston – May 11-13, 2004 Reserve Development and Replacement Virtually replaced 2003 reserves Mined below average reserve grade in 2003 Focusing on replacing and growing in 2004 – Create long-term value – Provi
Slide 11: Resources to Execute Strategy
BARRICK GOLD CORPORATION Merrill Lynch – Global Metals, Mining and Steel Conference Boston – May 11-13, 2004 Resources to Execute Strategy Financial Strength “A” rated balance sheet Capable of self-financing our development program without equity dilution Adopted a no-hedge policy 17% of res
Slide 12: Industry Dynamics – Low Growth Rates
BARRICK GOLD CORPORATION Merrill Lynch – Global Metals, Mining and Steel Conference Boston – May 11-13, 2004 Industry Dynamics – Low Growth Rates Growth Rate at the 4 Other Majors: ’04 – ’07F millions of ounces 25 2% CAGR PDG 20 GF 15 ANG 10 5 NEM 0 04F 05F 06F 07F Source: Average of Research and co
Slide 13: Beyond 2007 – Pascua-Lama
BARRICK GOLD CORPORATION Merrill Lynch – Global Metals, Mining and Steel Conference Boston – May 11-13, 2004 Beyond 2007 Pascua-Lama – world-class long life asset – part of a new mining camp with Veladero – updated feasibility study expected mid year Consistent investment in exploration Opport
Slide 14: Beyond 2007 – Exploration Strategy
BARRICK GOLD CORPORATION Merrill Lynch – Global Metals, Mining and Steel Conference Boston – May 11-13, 2004 Beyond 2007 – Exploration Strategy More than 95 projects in 9 countries > 2 million ounce greenfield gold deposits; reserve additions in proximity of existing assets 6 high priority cou
Slide 15: Robust and Balanced Pipeline
BARRICK GOLD CORPORATION Merrill Lynch – Global Metals, Mining and Steel Conference Boston – May 11-13, 2004 Robust and Balanced Pipeline STAGE BUDGET Dee, Rossi, Reserve Development Goldstrike, 26% E. Arch, Chocolate Reef Goldstrike S. Pit, Advanced Drilling Ruby Hill, Ren 19% +4 other projects La
Slide 16: The Case for Barrick
BARRICK GOLD CORPORATION Merrill Lynch – Global Metals, Mining and Steel Conference Boston – May 11-13, 2004 The Case for Barrick Construction of all four new mines has begun Unrivaled growth and projected lowest cash costs among top five producers through 2007 Focus on continued growth beyond