Aruma Resources Limited · ASX:AAJ

Aruma Resources — Future Facing Commodities Conference 2023

13 slides from Aruma Resources's conference presentation, Apr 6, 2023

  1. Slide 1: A Diversified Exploration Company Focused on Driving Shareholder Value

    A DIVERSIFIED EXPLORATION COMPANY FOCUSED ON DRIVING SHAREHOLDER VALUE 6 April 2023 ARUMA RESOURCES | ASX : AAJ www.arumaresources.com

  2. Slide 2: Disclaimer

    DISCLAIMER These estimates and assumptions while considered reasonable by the Company are subject to The information contained in this presentation is for informational purposes only and does not known and unknown risks, uncertainties and other factors which may cause the actual results, constitute

  3. Slide 3: Corporate Snapshot

    CORPORATE SNAPSHOT TRADING INFORMATION 0.10 Share price (4/04/2023) A0.072 A$0.051 - 52 week low/high A$0.195 0.08 157m Shares on Issue (29m options ) Market Cap A$11.3m 0.06 Cash (28/02/2023) A$2.7m Enterprise Value A$8.6m 0.04 MAJOR SHAREHOLDERS Directors – 3% Oct 22 Nov 22 Dec 22 Jan 23 Feb 23 Ma

  4. Slide 4: Aruma's Projects

    ARUMA’S PROJECTS Mt Deans Lithium bearing pegmatite Multiple pegmatites with consistent mineralisation Li plus Rb, Cs, Sn, K, Ta Saltwater New REE targets in greenfields province – high grade samples Targeting for Au, REE, Cu, Pb. Melrose Strike extensions of Paulsens mine Salmon Gums Drilling defin

  5. Slide 5: What Sets Us Apart

    WHAT SETS US APART Aruma has targeted available ground that fits our mineralisation model while specifically looking for prospective terrain that has for various reasons been previously overlooked. Mt Deans – Tantalum rich pegmatite outcrop which had not previously been sampled for Lithium. Saltwate

  6. Slide 6: Mt Deans Lithium Project

    MT DEANS LITHIUM PROJECT • 200km from deep sea port in “Lithium Corridor” • Pegmatite in basalts • Drill hits up to 2% Li2O and 1.5% Rb2O o 8m @ 1.1% Li2O from 26m o 5m @ 1.0% Li2O from 55m o 5m @ 1.2% Li2O from 4m • High Cs, Nb, Ta, Sn and K o 10m at 0.2% Cs from 33m o 6m at 0.2% Cs from 13m o 7m a

  7. Slide 7: Mt Deans Lithium Project

    MT DEANS LITHIUM PROJECT Drill Programs Initial metallurgical Identified up to 15m thick pegmatites test work is underway. Seeking to capture Stage 1 - 8 RC holes Lithium and other 1,156m completed – results confirm Li- potentially valuable Rb rich pegmatite accessory minerals. Stage 2 - 21 RC holes

  8. Slide 8: Salmon Gums Gold Project

    SALMON GUMS GOLD PROJECT Location – Norseman Belt Structure – Major NE faults Area –222km2 granted Els • 1 new 138km2 lease just applied for. Heritage – All on farmland Peer explorers in the district: Scotia Mining Centre Multiple zones of mineralisation Green Lantern Intersections: • 28m at 8.41g/t

  9. Slide 9: Salmon Gums – Drilling Gold

    SALMON GUMS – DRILLING GOLD Aruma drilling to date; 6,243m in 72 holes Bonanza grade Gold Intersected; • 4m @ 4.26g/t Au from 105m • Incl 1m @ 13.25g/t Au from 108m • 5m @ 50.2g/t Au from 42m • Incl 3m @ 83g/t Au from 42m (AAJ ASX announcement 21 March 2022) Core drilling expands area of interest at

  10. Slide 10: Pilbara Projects

    PILBARA PROJECTS ATTRACTIONS • Open ground with easy access • World class discoveries • Fertile rock types • 450km Nanjilgardy Fault target • >5M oz Corridor • >1,000km2 Lease areas • Potential for greenfields Camp discovery • Rare Earth possibilities ARUMA RESOURCES | ASX : AAJ www.arumaresources.c

  11. Slide 11: Saltwater Project Description

    SALTWATER PROJECT DESCRIPTION Basement Fault splays into Domes Sirius 398km2 granted tenure Levanto 80km of strike of the favorable Wyloo- Bresnehan major unconformity Gold Indicators Nuggets-Alteration Historic REE targets being investigated along with Uranium and base metal mineralization DRE • Le

  12. Slide 12: Aruma Highlights

    ARUMA HIGHLIGHTS Generating Shareholder value by Drilling Gold and Lithium-Rubidium for near term results Company Metrics give Actively Drilling Results strong upside for real news flow with Well Funded Drilling successful Market Cap ~$11.1M results for Li and Au in For exploration programs - Mt Dea

  13. Slide 13: Contact Details

    CONTACT DETAILS Glenn Grayson, Managing Director James Moses, Media and Investor Relations Aruma Resources Limited Mandate Corporate Telephone: +61 8 9321 0177 M: +61 420 991 574 M: +61 417 946 370 E:james@mandatecorporate.com.au E: info@arumaresources.com ARUMA RESOURCES | ASX : AAJ www.arumaresour

Aruma Resources — Future Facing Commodities Conference 2023 on 6ix