  1. Slide 1: Oyu Tolgoi: Advancing value, creating options

    Investor Presentation August 2017 Oyu Tolgoi: Advancing value, creating options

  2. Slide 2: Forward-looking statements

    Forward-looking statements 2 This presentation includes certain “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the “safe harbour” provisions of the United States Private Securities Litigation Refor

  3. Slide 3: Turquoise Hill's investment thesis

    Turquoise Hill’s investment thesis 3 1. Oyu Tolgoi expected to be world’s third-largest copper mine 2. Significant cash flow expected from underground development 3. Hugo North Lift 1 financing in place1 4. Turquoise Hill should benefit from expected drop in copper supply (~2020) 5. Oyu Tolgoi’s res

  4. Slide 4: Oyu Tolgoi's expected production growth

    Oyu Tolgoi’s expected production growth 4 Copper ('000 tonnes) Gold ('000 ounces) Expected copper production growth 2017 – 2025: +320% 669 +450% 622 612 Expected gold production growth 2017 – 2025: 583 522 521 475 450 397 369 Source: 2016 Oyu Tolgoi Technical Report 256 264 221 175 156 156 149 145 1

  5. Slide 5: Long-term copper fundamentals strong

    Long-term copper fundamentals strong 5 Copper mine supply/demand outlook  Copper market likely to enter a temporary deficit in 2017. Base Highly Probable Primary Demand Average copper price 30 Forecast 4.00  Ongoing attrition at existing mines driven by declining 25 grade Copper mine supply/demand

  6. Slide 6: First quartile producer

    First quartile producer 6 C/lb, 2016$ Normal C1 + Sustaining CAPEX 400 (Oyu Tolgoi’s costs and volumes for 2025 – 2030) Q1 Q2 Q3 Q4 300 Oyu Tolgoi Other Mines 200 100 0 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 Cumulative production (‘000 tonnes) -100 Source: Wood Mackenzie (Q4’16

  7. Slide 7: Underground development

    Underground development Photo: Jumbo working on main access lateral development off of Shaft 1.

  8. Slide 8: 2016 Resources Case: ~3.4 billion tonnes

    2016 Resources Case: ~3.4 billion tonnes 8 Oyut Open Pit ~900Mt (reserve) 0.44% copper; 0.28 g/t gold Hugo South ~300Mt (resource) Heruga 1.07% copper ~700Mt (resource) 0.06 g/t gold 0.42% copper 0.43 g/t gold; >100Mlb moly Hugo North Lift 1, panels 0,1,2 ~500Mt (reserve) 1.66% copper; 0.35 g/t gold

  9. Slide 9: Block cave concept

    Block cave concept 9  Gravity used to exploit deep ore body Block caving  Cave propagation (caveability) depends on in situ stresses and host rock’s ability to fracture  Initial drill, blast and extraction focused on bottom section of ore body via drawpoint to create void  Broken ore removal fro

  10. Slide 10: Alternative production cases

    Alternative production cases 10 Resources 120 Case • ~Year 20, concentrator capacity ~120mtpa • NPV8% $8.8 billion1 • Expansion capex ~$14.9 billion3 Resources 100 Case • ~Year 20, concentrator capacity ~100mtpa • NPV8% $8.9 billion1 • Expansion capex ~$13.5 billion3 Resources 50 Case • Assumes conc

  11. Slide 11: Underground mining sequence

    Underground mining sequence 11 Panel 0 Panel 2 Panel 1 Initial production South North Average grade 2.5% cu  Initial underground production begins with Panel 0  Highest copper grades occur during ramp up exceeding 2.5% in several years  2024-2026: Oyu Tolgoi peak copper production during period e

  12. Slide 12: Underground development status

    Underground development status 12  4.0 equivalent metres completed (January 2016 – end Q2’17)  Increased metres expected in 2H’17 with larger crusher Lateral development  Full utilization of third crew expected in Q3’17  Fourth and fifth crews in training  Approximately 65 vertical metres1 rema

  13. Slide 13: Complete ramp-up expected by 2027

    Complete ramp-up expected by 2027 13 Sustainable underground production Complete convey-to-surface Project First draw Complete concentrator Complete re-start bell firing upgrade ramp-up 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Expansion capital Pre-start Sustaining capital Ex

  14. Slide 14: Sources and uses of development capital

    Sources and uses of development capital 14 Uses of development capital (2016 – 2022) Uses Amount ($B) Note Underground development $5.3 Includes concentrator upgrade Debt service $3.3 Debt repayment, interest and financing fees Total $8.6 Sources of development capital (2016 – 2022) Sources Amount (

  15. Slide 15: Open-pit operations

    Open-pit operations Photo: Oyu Tolgoi’s open-pit mine.

  16. Slide 16: Production highlights

    Production highlights 16 All Injury Frequency Rate Concentrator throughput (per 200,000 hours worked) ('000 tonnes) 0.47 38,152 34,537 0.33 27,872 0.27 0.22 19,724 2014 2015 2016 1H'17 2014 2015 2016 1H'17 Industry-leading safety performance Throughput target of 40 million tonnes for 2017 Copper in

  17. Slide 17: Financial highlights

    Financial highlights 17 Cash position Operating cash flow ($'000,000) ($'000,000) $1,418 $1,379 $1,344 $719 $651 $863 $399 $140 Cu:$3.10 Cu:$2.49 Cu:$2.21 Cu:$2.61 Au:$1,266 Au:$1,160 Au:$1,251 Au:$1,238 2014 2015 2016 1H'17 2014 2015 2016 1H'17 Strong cash position Consecutive periods of positive o

  18. Slide 18: Production and financial guidance

    Production and financial guidance 18 2016 2017 Copper in concentrates 201,300 tonnes (actual) 130,000 – 160,000 tonnes 175,000 – 195,000 tonnes Gold in concentrates ~300,000 ounces (actual) 100,000 – 140,000 ounces 255,000 – 285,000 ounces Operating cash costs $775 million (actual) $720 million $840

  19. Slide 19: Reserves case concentrator performance

    Reserves case concentrator performance 19 Annual concentrator throughput (million tonnes) Cu % grade Au g/t Copper grade Gold grade 45 2.00 40.0 39.7 40.0 40.1 40.0 40.0 40 39.2 38.2 37.9 37.1 34.5 35.1 35 1.50 30 27.9 25 1.00 20.3 20 15 0.50 10 5 0 0.00 2013a 2014a 2015a 2016a 2017e 2018e 2019e 202

  20. Slide 20: Managing near-term ore grade challenges

    Managing near-term ore grade challenges 20 Open-pit plan view Phase 7  Phases 6 and 4a as well as Phase 6 low-grade stockpile ore processed in 2017 Phase 10 Phase 5 Phase 8  Phase 4 stripping provides access to higher ore grades in 2018 Phase 4A Phase 9 Phase 4B Source: 2016 Oyu Tolgoi Technical R

  21. Slide 21: Oyu Tolgoi – a long-term growth opportunity

    Oyu Tolgoi – a long-term growth opportunity 21  Advancing underground development  Creating long-term development options  Demonstrated productivity and cost improvements  Best copper asset in development

  22. Slide 22: Appendix

    Appendix

  23. Slide 23: Technical report CAPEX profile

    Technical report CAPEX profile 23 $1.3 $1.2 $1.2 $1.0 $0.8 $0.5 $0.5 $0.3 $0.4 $0.4 $0.4 $0.3  Underground expansion capital, VAT and escalation of $5.3 billon  Underground sustaining capital, VAT and escalation of $2.8 billion to full ramp-up expected in 2027

  24. Slide 24: Reserves Case cash flow model

    Reserves Case cash flow model 24 Cash Flow Statement (US$M) Year Total Year Number 1 2 3 4 5 6 7 8 9 10 11 21 31 Year To 20 30 40 Gross Revenue 954 923 1,189 1,402 1,735 1,993 3,380 4,434 4,879 4,622 35,422 13,698 8,175 82,806 Realization Costs 263 237 222 212 246 311 513 664 728 709 5,955 2,502 1,2

  25. Slide 25: Oyu Tolgoi at China's doorstep

    Oyu Tolgoi at China’s doorstep 25

  26. Slide 26: Hugo North Lift 1 production schedule

    Hugo North Lift 1 production schedule 26 Figure: 2016 Oyu Tolgoi Technical Report, OreWin, 2016.

  27. Slide 27: Project finance flow of funds

    Project finance flow of funds 27 Shareholder loan At project finance drawdown Payable to Turquoise Hill* Receivable from Oyu Tolgoi* Proceeds: $4.3 billion2 $4.3 billion3 $4.2 billion Shareholder loan Q1’16: $7.0 billion Shareholder loan Q2’17: $3.4 billion Payable to Turquoise Hill* Receivable from

  28. Slide 28: Underground elements

    Underground elements 28 Ground Support Undercut APEX To Drill Drilling Blasting 28m 28m 17m UNDERCUT 17m EXTRACTION 28m Extraction Ore Handling Drawbell Ore Steel Set Pass Drawpoint Extraction Drift Vent IDZ Raise 10 m Drawbell blast 12 m

  29. Slide 29: turquoisehill.com

    turquoisehill.com Turquoise Hill Resources Ltd. Suite 354 - 200 Granville Street Vancouver, BC, Canada V6C 1S4 TRQ: TSX, NYSE & NASDAQ Turquoise Hill is an international mining company focused on the operation and development of the Oyu Tolgoi copper-gold mine in southern Mongolia.