Challenger Limited · ASX:CGF

Challenger — Inexus — Non-Deal Roadshow (February 2006)

17 slides from Challenger's roadshow presentation, February 2006

  1. Slide 1: Visit to Australia February/March 2006

    Visit to Australia February/March 2006

  2. Slide 2: Philip Gibb, Chief Executive

    aS 2 Philip Gibb Chief Executive ) ~INEXUS

  3. Slide 3: Agenda

    Agenda • Prospects • Business Performance • Markets & Competition • Regulation • Operations • Summary

  4. Slide 4: Considerable growth prospects

    Considerable growth prospects Competitive advantages •1 Market Leader •2 Economies of scale •3 Strong brand and relationships •4 One step ahead of competition •5 Electricity – next step change in competitive position

  5. Slide 5: Business performance

    Business performance Consistently strong performance Sales of connections up by 21% CAGR (000s) 100 75 20 10 Elec tric 50 Gas 66 66 25 52 56 36 42 0 2001A 2002A 2003A 2004A 2005A 2006B Built connections up by 22% CAGR (000s) 450 4 1 300 Electric 386 Gas 338 150 290 242 188 152 0 2001A 2002A 2003A 20

  6. Slide 6: Business performance

    Business performance Consistently strong performance Revenue increase of 19% (£m) 35 30.0 30 26.4 25 22.9 19.2 20 15.6 15 12.7 10 5 0 2001A 2002A 2003A 2004A 2005A 2006B EBITDA increase of 20% (£m) 25 20.7 20 17.7 Note: EBITDA margin increased from 63% 14.9 15 13.5 in 2001 to 69% in 2006 9.8 10 8.0

  7. Slide 7: Revenue

    Revenue Stable, secure long term revenues • Stable, long term, low risk Revenues (£m) BUT high growth: 50 • Order book build out 40 • Legacy Settlement 30 41 30 • 96% current revenues 20 26.4 22.9 19.2 • 85% total order book 10 12.7 15.6 0 2001A 2002A 2003A 2004A 2005A 2006B Build Out

  8. Slide 8: UK new housing market

    UK new housing market Current build rate close to historic low Dwellings completed in Great Britain (000s) 200 150 Build rate of c.169,000 implies 100 average house life of 50 c.150 years 0 1990/91 1992/93 1994/95 1996/97 1998/99 2000/01 2002/03 Completed 5 year average

  9. Slide 9: Move into electricity networks

    Move into electricity networks Natural evolution • Rapid market entry • Significant customer demand • Larger market • Suitable regulatory environment • Significantly lower net capital cost

  10. Slide 10: Declining number of competitors

    Declining number of competitors 2005 BGCL - Assets sold UGI - Business sold 2004 Scottish Power - Business sold Mowlem - Business sold 2003 East Midlands - Business sold United Utilities - Business sold

  11. Slide 11: Remaining gas transporters

    Remaining gas transporters Sales p.a .(1) • Inexus >60k 2006 Budget • Transco (2) c.20-30k • GTC c.30-35k Organic growth • SSE <10k Limited geography • East Surrey Pipelines Infill only (1) Source: Management estimates (2) Now fragmented into NGT and other DN owners

  12. Slide 12: Regulation

    Regulation • Agreement with OFGEM (UK regulator) • Pre 2004 projects – legacy settlement • Post 2004 relative price control (RPC) • Industry wide • Common principles

  13. Slide 13: Legacy settlement

    Legacy settlement Inexus’ strong Legacy Settlement • Covers 96% of current revenues • Contracted prior to 2004 • Flat real revenues • Uplifted for RPI • Long control period • End 2018; migration into RPC thereafter

  14. Slide 14: RPC

    RPC Favourable framework for Inexus Example of RPC floor and ceiling (£ in real terms) 40 35 30 25 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 Ceiling Floor Transco equivalent price IGT charge • Contracted on or after 1 January 2004 • Stability via narrow floor/ ceiling over 20 years • Lo

  15. Slide 15: Asset operating costs

    Asset operating costs Declining unit costs • Falling opex per Asset opex/ connection (£)1 connection 15 • Economies of scale/ efficient systems 10 • Low repairs and 5 maintenance • Electricity = further 0 2001A 2002A 2003A 2004A 2005A 2006B improvement to marginal OPEX Note: 1. Internal overheads an

  16. Slide 16: Construction costs

    Construction costs Significant efficiencies • Low build net cost • Build out of existing order book <£200 per connection • New networks <£350 per connection • Unique build cost model • Direct contracting teams • Outsourced supply chain • Low inventory cost • High volume cost savings • Electricity bu

  17. Slide 17: Summary - a unique platform

    Summary - a unique platform Low utility-type risk but strong growth •1 Leading market position • 491,000 connections, of which c.339,000 installed •2 Strong prospects for growth • Gas/ electricity, potential for other utilities •3 Stable secure long term revenues • Certainty re prices; RPI-indexed •

Inexus — Non-Deal Roadshow (February 2006) on 6ix