  1. Slide 1: ASX cover letter: latest Fortescue presentation

    61 8 9266 OLE + 61% 9266 0186 o wwefinglcam.ae Porteseue Metals Group Ltd ACN: O02 594 872 Fortescue House 50 Kings Park Ruad West Porth Western Australia GO0% PQ Bos 910, West Berth, Western Australia 6872 23 February 2006 The Companies Officer Australian Stock Exchange Ltd. Exchange Plaza 2 The Es

  2. Slide 2: The Pilbara Iron Ore and Infrastructure Project

    The Pilbara Iron Ore and Infrastructure Project Global Iron Ore and Steel Forecast Conference 23 February 2006 The New Force in Iron Ore | Data and amounts stan 10 thls presentation telating « eapltal sists, operating casts and project timelines are internally generated best estimates only. der revi

  3. Slide 3: 2 tonnes of iron ore = 1.2 tonne of steel

    2 tonnes of iron ore = 1.2 tonne of steel

  4. Slide 4: ASX listed — 2.4Bt Resources, 1.1Bt Reserves JORC

    ASX listed — 2.4Bt Resources, 1.1Bt Reserves JORC Developing world class Chichester Iron Ore and Infrastructure Project * Short term target Reserves 1.55 Bt * First Major project underway: >US$1bn EBITDA p.a. * Dominant landholder of the worlds richest iron ore region — The Pilbara * All finance str

  5. Slide 5: Fortescue Ownership

    Fortescue Ownership Institutions dominate register after management (with 30%) + Global Institution * Asian Institution + American Institution + European Institution * Australian Institution + European Institution * American Institution « American Institution * American Institution « American Instit

  6. Slide 6: Significant asset backing

    Significant asset backing * Robust iron ore demand * Optimal location * Huge reserves * Simple construction * Lowest cost producer + Powerful economics - rapid payback

  7. Slide 7: The largest bedrock hosted iron ore discovery in Australia

    The largest bedrock hosted iron ore discovery in Australia Hi reserve Robe rasourca Hiresource: 2500 Robe reserve 2000 + BHPB teserve- FMG resource g 2 1500 4 & : s BHPB resoureo. FMG reserve § Portman (1.07 Bt) = 1000 aH — —_ & La ea ee ee ee ee see) oT 500 5 beet ell boa el ee Ime | bea ron bee be

  8. Slide 8: BHP Billiton

    BHP Billiton (Pilbara contributes ~ 25% of BHPB’s market cap) Location ‘hount Goldsworthy, Town Highway Drainage Rall exsing Raifcomiéor - proposed MG Terements BHP Bilton Iron Ore deposit | Won Ore mine Source: BHPB / Rio Sector Analysis

  9. Slide 9: BHP and Rio Tinto

    BHP and Rio Tinto (Pilbara contributes ~ 50% of Rio’s market cap) LEGEND Town Heoraay Drainage C4 2 clout Geldsweethy Rail- sisting ioe Rai order OO eposed FS Tenements Rio Tato Group BHP Biiton ‘fon Cre weposit ee Fron Ore sine Le suomes.o sone Source: BHPB / Rio Sector Analysis

  10. Slide 10: Pilbara tenement holdings

    Part LEGEND Tours Heghwray eo Brainaee wpe Ral eating Ral comidor- proposed ENG. Tenements FG EMG - Mining Siafe Agreement io Tirto Group HP Bilton Robe ton Ore deposit * on Ore mine Sq km Holdings FMG — >32,500 BHPB - 5,500 Rio — 9,100 >32,500 square kms of tenements - already 2.4 Bt of iron ore fr

  11. Slide 11: Price outlook, 2006

    _ Price outlook, 2006.... * CRU (Citibank market consultant) forecasts global iron ore demand to reach 2 Billion tonnes (Bt) by 2015 and 2.275Bt in 2020 - Anew Fortescue Project needs to be added every year + Continuing demand growth out of Asia demonstrates need for a number of Fortescue’s projects

  12. Slide 12: Australia's iron ore is cheaper than Brazil's

    Australia’s iron ore is cheaper than Brazil’s.

  13. Slide 13: Pilbara Ore is reliable and the most competitive

    , Pilbara Ore is reliable and the most competitive Australian Ore $US 42.85 South Africa Ore $US 61.01 Brazilian Ore $US 62.35 Indian Ore $US 80.78 “In iron ore, you can’t compete with the Pilbara” - Grant Samuel Source: China Metallurgical Daily - 2004 average landed price

  14. Slide 14: Marketing — International endorsement of Fortescue Iron Ore quality

    Marketing — _ International endorsement of Fortescue Iron Ore quality Successful testwork conducted by: * Major Asian Country — Market Leader * Australia — Market Leader, CSIRO * China — China’s Central South University + Germany — SGA : + Major Asian Country — Market Leader

  15. Slide 15: Sintering and Blast Furnace Performance

    1. Sintering Performance Productivity is superior to close competitors due to: * Ultra fines is relatively low * Consistent size distribution . = Superior throughput * Superior tumble strength * High permeability 2. Blast Furnace Performance Productivity is superior to close competitors due to: + Ke

  16. Slide 16: Iron ore comparison — Fe content of Australian shipping grade

    lron ore comparison — , Fe content of Australian shipping grade e 62.00- 6150. Weighted Average Fine Iron Ores - Fe Grade 61.00- 60.50- 60.00- Fe % 59.50- Rio 59.00- 58.50- 58.00- Data Sources: Robe River — Website, BHPB — Direct from Company, H1— Industry Sources, FMG — Own Tests, AME

  17. Slide 17: 2004 Iron ore comparison — Fe content of Australian shipped ores

    _ 2004 Iron ore comparison — ‘, _/Fe content of Australian shipped ores Rio and BHP sold 84 Mt of ores with Fe less than Fortescue HG Rio and BHP sold 62 Mt of ores with Fe less than Fortescue SV Fortescue’s ore is very attractive to Asian mills with most production under contract Asian steel mills

  18. Slide 18: Metallurgical results conclude

    Metallurgical results conclude: | Fortescue ore is a “have to have” for Asian Steel Mills Fortescue ore performs at the top end of its competitors Analogy: * Brazilian Carajas and premium Australian Brockman (in decline) - BMW Series 7 * Fortescue HG, BHP MAC, RIO HIM and West Angeles ores —- BMW Se

  19. Slide 19: Total cost per tonne US$7.50

    Total cost per tonne US$7.50, comprising: ev * Cash Cost US$4.65 62% eee * Capex component US$1.20 16% HG Stockpile * Contractor’s Profit US$0.80 12% “eee * Contingency US$0.75 10% Oo Oo f,oO_ Mining Feasibility Study Ol TRUNK CONVEYOR O Feeder Hopper Lt 5 i interim Stockpiles. | Truck Cat 777 [L_s#

  20. Slide 20: Fortescue November 2005 — Unparalleled progress

    Fortescue 14 November 2005 — (A, Unparalleled progress as Iron Ore ready to be shipped

  21. Slide 21: Fortescue Trial Pit - November 2005

    Fortescue Trial Pit - 25 November 2005 ready for market

  22. Slide 22: Open Pit Mining, simple, smart

    Open Pit Mining, simple, smart Dump trucks load road trains from windrows a

  23. Slide 23: Open Pit Mining, simple, smart

    Open Pit Mining, simple, smart Road trains for ore, conveyors for waste elena ay mormon

  24. Slide 24: Infrastructure — Large scale open access port at Port Hedland

    Infrastructure — . Large scale open access port at Port Hedland

  25. Slide 25: Infrastructure – at Port Hedland

  26. Slide 26: Government approvals

    Government approvals * Mining and Infrastructure State Agreements executed * Project commenced 8 February 2006 * Strong Aboriginal support — Native Title and Heritage surveys completed * National Competition Council delivers draft declaration in favour of Fortescue

  27. Slide 27: Project construction

    , Project construction * Mine is simple - outsourced * Straightforward rail and port — no processing risk * WorleyParsons Infrastructure capital cost estimate of US$1.46 Billion with accuracy of +/- 10% * 22 month construction period with six month “pre-construction” activities should deliver first

  28. Slide 28: Slide 28

  29. Slide 29: oo ay

    ly oo ay | yy | | L ao ay an i iy oe Ly |

  30. Slide 30: Slide 30

  31. Slide 31: Project underway — Locos

    », Project underway — Locos I RAIL 4, CMG OF GOMER E00 LEAFED

  32. Slide 32: Project underway — Rail Steel

    Project underway — Rail Steel

  33. Slide 33: Project underway — Sleepers

    ., Project underway — Sleepers

  34. Slide 34: Project underway — Dredging

  35. Slide 35: Project underway — Ore Cars

  36. Slide 36: Project underway — EPCM

    ©, Project underway — EPCM WorleyParsons resources & energy

  37. Slide 37: Barclay Mowlem

    BARCLAY VIOWLEM Pereannionce Gunlt ca truat

  38. Slide 38: Project underway — Mining

    », Project underway — Mining LEIGHTON ’ q , * Ai Roche MIMING

  39. Slide 39: Project underway

    , Project underway AREA SUPPLIER CURRENT STATUS Preferred Li lected Dredging referred supplier selecte Award contract Jan 06 Wharfs Final selection & contract close Jan 06 Ore Cars y 4 a5 EDI sunrepconinaN aaa Detailed design and/or E Qresr construction of prototype ek PSE —_—————— = EDI Engineering

  40. Slide 40: Project underway

    , Project underway AREA SUPPLIER CURRENT STATUS Competitive tendering completed Selection of preferred supplier & final negotiations Port Bulk Material Handling Equipment Competitive tendering Mine Material Handling Final negotiations WorleyParsons resources 2 energy, EPCM FEED Contract signed Compe

  41. Slide 41: Project underway

    Project underway AREA SUPPLIER CURRENT STATUS Competitive tendering completed Selection of preferred supplier & final negotiations Port Bulk Material Handling Equipment Competitive tendering Mine Material Handling Final negotiations EPCM WorleyParsons FEED Contract signed raseunces & eneriy Earthwor

  42. Slide 42: Project schedule and milestones

    Activity Description Sep] Oct [Nov] Dac | Jan] Feb] wu [Aug] Sep] Oct] Nov] Dec| Jan Way] Jun 49[ 20 [a [a 23 | 24 | 25 Project Mitestones FEED ]Ore Handing Enginoaring Design Procurement & Contracts Construction Port Facilities Engineering Design Procurement & Contracts {Construction Rail Services

  43. Slide 43: Winters Dorsey and Co. appointed by Citigroup

    Winters Dorsey and Co. appointed by Citigroup * Draft report close to finalisation * Key comments include “Geologic work done by Fortescue is of very high quality and provides a sound basis for the resource modeling and estimation done by Snowdens” “WDC is in agreement with the capital cost estimate

  44. Slide 44: To conclude, the risks have been managed out

    , To conclude, the risks have been managed out Risk Mitigant Market v¥ |30 Mtpa contracts Ore Body v | Huge, 2.4 Bt Resource, 1.1 Bt Reserve Approvals ¥ |All pre-requisites in place Construction v * Infrastructure DFS complete + EPCM underway * Critical contracts ready to be awarded Operations v Exp

  45. Slide 45: Letter from BHPB Iron Ore to Andrew Forrest

    Garbon Steet Materiate President - ron Gre ne wil ‘estes \ ‘vou ora sot | Soca cab As Berets gb to Sah Nir, Andrew Forrest Shief Executive Officer Fortescua Meiafs Group Ltd Ground Floor, Fortescue House 80 Kings Park Rowd West Perth, Western Australia 6! SS Septernber 2008. Dest Andrew, ‘Thank you

  46. Slide 46: Catch — Sufficiently Advanced?

    OQ, Catch 22 — Sufficiently Advanced? e “,.. When your plans for Mindy Mindy are sufficiently well advanced to make this practicable.” “In light of the above, | believe that there would be little point to a meeting at this time. Yours sincerely Graeme P Hunt President BHPB Iron Ore”

  47. Slide 47: Catch — It makes no commercial sense

    » Catch 22 — It makes no commercial sense e Three Judges of the Full Court of the Supreme Court of WA “It makes no commercial sense to require a prospective mine operator to undertake the huge expense of establishing a mining operation without having the slightest idea how much he will have to pay t

  48. Slide 48: Fortescue Metals Group Ltd

    Fortescue Metals Group Ltd The New Force in Iron Ore Fortescue House 50 Kings Park Road West Perth Western Australia veww. fring! com au

Fortescue Metals Group — 9th Annual Global Iron Ore & Steel Forecast Conference 2006 on 6ix