Slide 2: Action List
Action List ITEM RESPONSIBILITY PROGRESS UPDATE Tree Screen at New England Hwy – Optic fibre has been DS Ripping completed and tree planting has located and the area needs to be archeologically cleared to commenced allow for the tree screens to commence. 2 20 December 2024 2
Slide 3: Ashton Statistics
Ashton Statistics Ashton Coal Statistics 2015 Budget (YTD) 2015 Actual ROM (t) 2,365,145 2,483,455 Product Coal (t) 1,112,931 1,126,891 Total Coal Sales (t) 1,062,000 1,071,467 Lost Time Injury (LTIFR) 7.95 19.9 Total Recordable Injuries (TRIFR) 33.31 44.9 Total Employees (FTE) 222 201 3 20 December
Slide 4: Community Support Program
Community Support Program ▪ Community Support Applications • Singleton Heights Public School – sensory garden. • Singleton Archery Society – development range and equipment for juniors • Singleton Beef and LMA – portable amplifier system • Singleton Heights Pre-school – outdoor classroom • Singleton
Slide 5: Community Support Program
Community Support Program Organisation Purpose Amount ($) Singleton Mayoral Scholarship Academic Scholarship 2015 $5,500 Naidoc celebration week NAIDOC celebrations coordinated by the Singleton council $2,000 The Pancar Foundation and the High tea - Fundraiser for pancreatic cancer $300 Calcary Mate
Slide 6: SEOC Project
SEOC Project 6 20 December 2024 6
Slide 7: Current Operations
Current Operations • ACOL is approximately one third of the way through LW104 in the Upper Liddell Seam. • South East Open Cut – no further movement • Upper Lower Liddell Drifts (ULLD) have been completed and pit bottom drivage is continuing in readiness for mining in the ULLD seam. 7 20 December 20
Slide 8: Exploration Activities
Exploration Activities No exploration was conducted in EL5860 or EL4918. 8 20 December 2024 8
Slide 9: Approvals Update
Approvals Update As mining at ACOL progresses additional approvals are required to continue operations. Recent Approval determinations include: • First workings for ULLD 201-204 mains and gate roads Approvals lodged include: • Extraction Plan (EP) for LW 105-107 in the Upper Liddell Seam. Lodged 6 A
Slide 10: Environment Monitoring Data
Environment Monitoring Data ▪ The following slides present environmental monitoring data for the reporting period ▪ Meteorological • Rainfall ▪ Air Quality • Depositional Dust Gauges – Total suspended dust • PM10 – Tapered Element Oscillating Microbalance (TEOM) ▪ Surface Water – Glennies Ck, Bowman
Slide 11: Rainfall
Rainfall YTD Rainfall: 789mm 11 20 December 2024 11
Slide 12: Air Quality & Noise Monitoring Locations
Air Quality & Noise Monitoring Locations 12 20 December 2024 12
Slide 13: Depositional Dust
Depositional Dust On-site Dust Gauges 13 20 December 2024 13
Slide 14: Total Suspended Dust
Total Suspended Dust 14 20 December 2024 14
Slide 15: Total Suspended Dust
Total Suspended Dust 15 20 December 2024 15
Slide 16: PM10 Dust – Site 1
PM10 Dust – Site 1 16 20 December 2024 16
Slide 17: PM10 Dust – Site 2
PM10 Dust – Site 2 17 20 December 2024 17
Slide 18: PM10 Dust – Site 3
PM10 Dust – Site 3 18 20 December 2024 18
Slide 19: PM10 Dust – Site 8
PM10 Dust – Site 8 19 20 December 2024 19
Slide 20: Surface Water Sampling Locations
Surface Water Sampling Locations 20 20 December 2024 20
Slide 21: Surface Water Quality – pH
Surface Water Quality – pH 21 20 December 2024 21
Slide 22: Surface Water Quality – EC
Surface Water Quality – EC 22 20 December 2024 22
Slide 23: Surface Water Quality – pH
Surface Water Quality – pH 23 20 December 2024 23
Slide 24: Surface Water Quality – EC
Surface Water Quality – EC 24 20 December 2024 24
Slide 25: Surface Water Quality – pH
Surface Water Quality – pH 25 20 December 2024 25
Slide 26: Surface Water Quality – EC
Surface Water Quality – EC 26 20 December 2024 26
Slide 27: Groundwater Sampling Locations
Groundwater Sampling Locations 27 20 December 2024 27
Slide 28: Groundwater – Standing Depth
Groundwater – Standing Depth 28 20 December 2024 28
Slide 29: Groundwater – EC
Groundwater – EC 29 20 December 2024 29
Slide 30: Noise Monitoring
Noise Monitoring Attended noise monitoring is conducted Monthly. There were no exceedances during the reporting period 30 20 December 2024 30
Slide 31: What else is going on?
What else is going on? ▪ Rehabilitation maintenance ▪ Purchase of RMS Properties in Camberwell ▪ Wonnarua Mine Rehabilitation Services – 1 Alpha Street ▪ Interseam staple shaft construction ▪ New England Tree Screen 31 20 December 2024 31
Slide 32: Interseam Staple Shafts
Interseam Staple Shafts • Interseam staple shaft construction have been completed via raised bore drilling methods between the ULD and the ULLD seam. • The shafts are approximately 30m long and 4-4.5m in diameter. • The drilling has now been completed and only shot-creting of the shafts remains 32 2
Slide 33: Any Questions?