Western Copper And Gold Corporation · TSX:WRN

Western Copper And Gold — Investor Presentation (April 2020)

47 slides from Western Copper And Gold's investor presentation, April 2020

  1. Slide 1: Developing Canada's Premier Copper-Gold Mine

    DEVELOPING CANADA’S PREMIER COPPER-GOLD MINE APRIL 2020 TSX : WRN I NYSE AMERICAN : WRN

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS The information provided in this presentation is not intended to be a comprehensive review of all matters and developments concerning Western Copper and Gold Corporation and its subsidiaries (collectively, the “Company”). This document should be read in conjunction with al

  3. Slide 3: The Casino Story Is Taking Off

    THE CASINO STORY IS TAKING OFF SIGNIFICANT COPPER-GOLD DEPOSIT  Feasibility Study indicating strong Project with great economics  Stable jurisdiction with clear path through permitting RECENT EXPLORATION SUCCESS  New gold zone and new copper-gold porphyry discovered  New acquisition of claims to

  4. Slide 4: Significant Copper-Gold Deposit

    SIGNIFICANT COPPER-GOLD DEPOSIT ALASKA YUKON CASINO PROJECT Whitehorse GOLD COPPER Skagway 8.9 M 4.5 B oz Reserves lbs Reserves + + 9.0 M 5.4 B oz Inferred Resources lbs Inferred Resources B.C Vancouver + ….. UPDATED RESOURCE PENDING Note: see Appendix for detailed Casino mineral resource & reserve.

  5. Slide 5: An Attractive Copper or Gold Mine

    AN ATTRACTIVE COPPER OR GOLD MINE Silver Moly 2% 11% Copper 39% Gold 49% *ESTIMATED REVENUE DISTRIBUTION (FIRST 4 YEARS AT SPOT PRICES) Note: US$1,700 Au, US$2.25 Cu, Mo US$11.00, Ag US$15.25, FX: US$:C$ 1:0.72. Source: Casino Feasibility Study. See “Notes” in Appendix. TSX : WRN I NYSE AMERICAN : W

  6. Slide 6: TSX/V Junior Controlled Copper Projects

    TSX/V JUNIOR CONTROLLED COPPER PROJECTS – ONLY 15 UKMP Pebble CASINO Kutcho KSM Morisson Northisle Harper Creek Northmet King King Cascabel Tampakan Canariaco Norte Cotabambas Mina Justa Project Constellation MANY OF THESE PROJECTS: • are too small to have an impact on copper supply Productora • are

  7. Slide 7: Top 10 Largest TSX/V Junior Controlled Gold Projects

    TOP 10 LARGEST TSX/V JUNIOR CONTROLLED GOLD PROJECTS Pebble CASINO KSM Donlin Livengood Rosia Montana New Prosperity Metates Tampakan Freida River Los Helados MANY OF THESE PROJECTS: • are not economic at current prices • are located in unfavorable jurisdictions • have environmental and/or technical

  8. Slide 8: The Casino Project

    & western COPPER AND GOLD 2 THE CASINO PROJECT

  9. Slide 9: Resource & Reserve (2013)

    RESOURCE & RESERVE (2013) RESERVE (P&P) Leached cap: 157 Mt @ 0.29 g/t Au 8.9 million oz Gold Initial 4 years: 172 Mt @ 0.70% CuEq 4.5 billion lbs Copper 22 Year Mine Life: 965 Mt @ 0.50% CuEq >0.25% CuEq <0.25% CuEq INFERRED RESOURCE 0m 250m 500m 9.0 million oz Gold 0.95% CuEq over 689m 1,710 Mt @

  10. Slide 10: Unparalleled IRR and Payback for a Large Project

    UNPARALLELED IRR AND PAYBACK FOR A LARGE PROJECT NPV IRR PAYBACK @8% (C$) (years) $3.1 B 27.1 % 2.2 Project Economics at $2.25 Cu and $1,700 Au (after-tax) Note: US$1,700 Au, US$2.25 Cu, Mo US$11.00, Ag US$15.25, FX: US$:C$ 1:0.72. Source: Casino Feasibility Study. See “Notes” in Appendix. TSX : WRN

  11. Slide 11: Economic Throughout the Commodity Cycle

    ECONOMIC THROUGHOUT THE COMMODITY CYCLE 45% Gold Price $7.0 Gold Price $2500/oz $2500/oz $ 5.0B NPV at top 40% $6.0 of last cycle prices $2000/oz $2000/oz 35% $5.0 NPV, Billions (after-tax) $1500/oz $1500/oz IRR (after-tax) 30% $1000/oz $4.0 $1000/oz 25% $3.0 20% $2.0 IRR above 15% through 15% entir

  12. Slide 12: Production

    PRODUCTION Y1 to Y4 22 YRS Grade % CuEq 0.70 0.50 Copper production (M lb/y) 245 171 500 (ktpa) 111 78 450 Copper (million lbs), Gold (thousand ozs) CuEq Production (M lb/y) 516 382 400 Gold Production (k oz/y) 399 266 350 AuEq Production (k oz/y) 1,179 872 300 Strip Ratio 0.49 0.59 250 200 150 100

  13. Slide 13: Comparable Capex

    Unit Capex (US$/t CuEq/y) $0 $5,000 $10,000 $15,000 $20,000 $25,000 $30,000 $35,000 $40,000 Florence Copper ($0.2 B) Los Helados ($1.2 B) Agua Rica ($2.2 B) Carrapateena ($0.7 B) Mantoverde ($0.8 B) Pumpkin Hollow ($1.1 B) Josemaria ($2 B) COMPARABLE CAPEX TSX : WRN I NYSE AMERICAN : WRN Resolution

  14. Slide 14: Social License

    SOCIAL LICENSE Accepting award for Outstanding Environmental stewardship COMMUNITY  Ongoing Engagement with Local Communities  14+ Years of Operating Responsibly in the Yukon SUPPORTING FIRST NATIONS  Selkirk Spirit Dancers  Biennial Moosehide  Significant and Continuing  Tantalus Hot Lunch Pr

  15. Slide 15: Access Road Funding

    ACCESS ROAD FUNDING  $130 million funding committed from Governments for the Casino Access Road Canadian Prime Minister Justin Trudeau and Yukon Premier  Canadian Prime Minister Justin Trudeau and Yukon Premier Sandy Silver Sandy Silver TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Premier C

  16. Slide 16: Exploration Success

    EXPLORATION SUCCESS TSX : WRN I NYSE AMERICAN : WRN

  17. Slide 17: Resource Conversion Opportunity

    RESOURCE CONVERSION OPPORTUNITY  2019 drilling targeting conversion of inferred resource inside pit  New resource expected in early 2020 22 year Pit Inferred Resource TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Premier Copper-Gold Mine 17

  18. Slide 18: High Grade Gold Zone

    HIGH GRADE GOLD ZONE 55.1 g/t Au over 73.6 g/t Au over 2.97 m @ 147.98 m 1.85 m @ 69.16 m 53.5 g/t Au over 2.45 m @ 343.55 m Intercepts > 2 g/t gold Trend of very high gold values High Bismuth Zones Note: See News Release dated December 19, 2019 for details on drilling program. TSX : WRN I NYSE AMER

  19. Slide 19: New Northern Porphyry

    NEW NORTHERN PORPHYRY 0.38% CuEq* over 2019 Northern step-out 107.83 m @ 40 m • 9/10 holes with significant widths of mineralization • 7/10 holes ended in mineralization Note: See News Release dated December 19, 2019 for details on drilling program. *See Appendix for CuEq calculation. TSX : WRN I NY

  20. Slide 20: Western Expansion

    WESTERN EXPANSION Western step-out • All holes intercepted mineralization • 3/6 holes ended in mineralization 3.6 g/t Au over 2.00 m @ 183.4 m Note: See News Release dated December 19, 2019 for details on drilling program. TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Premier Copper-Gold Mine

  21. Slide 21: Western Targets – Canadian Creek Claims

    WESTERN TARGETS – CANADIAN CREEK CLAIMS • Ana– porphyry target • Casino B– gold targets Note: Based on Canadian Creek Summary Report. See “Notes” in Appendix. TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Premier Copper-Gold Mine 21

  22. Slide 22: Deeper Porphyry Targets

    DEEPER PORPHYRY TARGETS Current deposit outline • Additional geophysical targets identified at depth Chargeability @ 67 ms MT @ 66 mS Source: Witherly, Ken, “New Riches from Old Data; a Re-evaluation of Legacy Data from the Casino Deposit, Yukon, AME Roundup, January 25, 2018 TSX : WRN I NYSE AMERIC

  23. Slide 23: Key Asset in an Emerging New Gold District

    KEY ASSET IN AN EMERGING NEW GOLD DISTRICT  Significant players – Newmont, Agnico- Eagle, Kinross, + others  25 million+ ounces of gold in district* WHITE GOLD  Significant exploration upside  Gov’t commitment to fund access to area  2 Projects in permitting  Community and First Nation support

  24. Slide 24: Clean and Tightly-Held Ownership Structure

    CLEAN AND TIGHTLY-HELD OWNERSHIP STRUCTURE TRADING Toronto Stock Exchange TSX: WRN NYSE American Stock Exchange NYSE American: WRN CASH POSITION Cash & Short Term Investments C$ 3.6 million *includes proceeds from Feb, 2020 Private Placement Dec 31, 2019 (*pro-forma) Short/Long Term Debt $Nil SHARE

  25. Slide 25: The New Casino

    THE NEW CASINO INVESTMENT HIGHLIGHTS:  Casino project already ticks many of the boxes  Significant copper and significant gold project  Feasibility Study indicating robust project with great economics  Strong community and government support  Key Permitting hurdles removed  New gold zone and a

  26. Slide 26: Analyst Coverage

    ANALYST COVERAGE CORMARK SECURITIES ROTH CAPITAL PARTNERS H.C. WAINWRIGHT & CO. Stefan Ioannou Jake Sekelsky Heiko F. Ihle, CFA Tel: (416) 943-4222 Tel: (646) 616-2786 Tel: (212) 356 - 0510 TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Premier Copper-Gold Mine 26

  27. Slide 27: Appendix

    a)\ ie \) Pie = ya COPPER AND GOLD western ee APPENDIX

  28. Slide 28: Key Management Team with Successful Track Record

    KEY MANAGEMENT TEAM WITH SUCCESSFUL TRACK RECORD Dale Corman, B.Sc., P.Eng Paul West-Sells, PhD Cameron Brown, P.Eng Executive Chairman President & CEO VP Engineering Extensive experience in Metallurgical Engineer with Formerly Project Manager for mineral development, significant management and Bech

  29. Slide 29: Board of Directors

    BOARD OF DIRECTORS Dale Corman, 40 years experience as a senior corporate officer of publicly listed companies. B.Sc, P.Eng. Extensive expertise in mineral exploration & development, financing, property Executive Chairman evaluation and acquisition. Formerly Chairman & CEO of Western Silver Corporat

  30. Slide 30: Excellent Cash Costs

    EXCELLENT CASH COSTS COPPER COSTS Spot Cash Cost Net of By-Product ($/lb) (2.45) Co-Product Cash Cost (Cu) US$/lb 1.55 GOLD COSTS Spot Cash Cost Net of By-Product ($/oz) (979) Cash Costs Co-Product Cash Cost (Au) US$/oz 865 Byproduct Revenue Cash Cost (net of Byproducts) NSR Royalty Yukon Royalty &

  31. Slide 31: Advancing Permitting

    ADVANCING PERMITTING Key permitting milestone recently achieved with the completion of Best Available Tailings Technology (BATT) Study. Importantly, First Nation, Territorial and Federal Governments were involved in the study examining every possible scenario for dealing with tailings and mine waste

  32. Slide 32: Following a Proven Path to Create Value

    FOLLOWING A PROVEN PATH TO CREATE VALUE May 2006  • Spin-out from Western Silver Transaction with Glamis (now Goldcorp) Nov 2006  • Acquired Casino Project from Lumina Resources 2008-2012  • Two Pre-Feasibility Studies Completed and Drilling to 100,000 m Jan 2013  • Bankable Feasibility Study Co

  33. Slide 33: The World Needs a Lot More Copper

    THE WORLD NEEDS A LOT MORE COPPER 5 million tonne deficit equivalent to annual production of 65 new casino mines Source: RBC Capital Markets estimates, Wood Mackenzie TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Premier Copper-Gold Mine 33

  34. Slide 34: Canadian Creek Acquisition

    CANADIAN CREEK ACQUISITION • Secures ground adjacent to the Casino, where there is likelihood that the deposit extends • Several new drilling targets • Strategically positioned between the Casino and Newmont’s Coffee Project Coffee - Newmont Ana zone Canadian Creek - New WRN Acquisition WRN Note: Ba

  35. Slide 35: East-West Longitudinal Section 6958400 N

    EAST—WEST LONGITUDINAL SECTION 6958400 N Note: High grade zone dips off section. Based on Casino Feasibility Study. See “Notes” in Appendix. TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Premier Copper-Gold Mine 35

  36. Slide 36: Good Grade

    GOOD GRADE MINERAL RESERVE GRADES IN LINE WITH PEERS: Casino Life of Mine (965 Mt) CASINO Casino Y1-Y4 (172 Mt) Copper Mountain - CMMC (2012) Highland Valley - TCK (2012) Gibraltar - TKO (790 Mt) Mt. Milligan - CG (482 Mt) PEERS Red Chris - NCM (301 Mt) Cobre Panama - FM (3058 Mt) 0.00 0.10 0.20 0.3

  37. Slide 37: Project Economics

    PROJECT ECONOMICS ECONOMICS Base Case Spot Copper (US$/lb) 3.00 2.25 Gold (US$/oz) 1,400 1,700 Molybdenum (US$/lb) 14.00 11.00 Silver (US$/oz) 25.00 15.25 Foreign Exchange (US$:C$) 0.95 0.72 NPV @ 8% (C$ M) 2,820 4,570 Pre-Tax IRR (100% equity) (%) 24.0 32.3 NPV @ 8% (C$ M) 1,830 3,060 After Tax IRR

  38. Slide 38: Operating Costs

    OPERATING COSTS ($/tonne) MILLING Milling $5.13 OPERATION Mining $3.05 General & Administrative $0.34 Total $8.52 ($/tonne) HEAP LEACH Heap Leach Operation $1.31 OPERATION ADR/SART $2.73 Total $4.04 Note: Based on Casino Feasibility Study, see “Notes” in Appendix. TSX : WRN I NYSE AMERICAN : WRN Dev

  39. Slide 39: Feasibility Study – January 2013

    FEASIBILITY STUDY – JANUARY 2013 PROJECTED MINE COSTS $ Millions CAPITAL COSTS Mining Equipment & Mine Development 454 Concentrator (incl. related facilities) 904 Heap Leach Operation 139 Camp 70 Subtotal Mine Direct Costs 1,566 Indirect Costs 295 Subtotal Mine Direct & Indirect Costs 1,861 INFRASTR

  40. Slide 40: Processing

    PROCESSING MILLING • Throughput: average LOM 124,000 tonnes per day • Grinding Circuit: 40 ft SAG Mill (29 MW) + 2 x 28 ft Ball Mills (22 MW each) • Medium – soft ore: BWi – 14.1 kWh/t, 200 µm primary grind FLOTATION • Conventional copper/moly circuit • Recoveries: Copper 86%, Gold 67%, Moly 71%, Si

  41. Slide 41: Excellent Concentrate Quality

    EXCELLENT CONCENTRATE QUALITY COPPER CONCENTRATE MOLYBDENUM CONCENTRATE Element Avg Value Unit Element Avg Value Unit Copper 28 % Molybdenum 57.4 % Gold 25 g/t Copper 0.39 % Silver 120 g/t Rhenium 133.5 g/t Iron 0.8 % Molybdenum 0.05 % Sulphur 37.9 % Iron 26 % Arsenic 1659 g/t Sulphur 36 % Antimony

  42. Slide 42: TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Premier Copper-Gold Mine

    TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Premier Copper-Gold Mine 42

  43. Slide 43: Yukon Map

    YUKON MAP TSX : WRN I NYSE AMERICAN : WRN Appendix 43

  44. Slide 44: Yukon Map – Southern Half

    YUKON MAP – SOUTHERN HALF TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Premier Copper-Gold Mine 44

  45. Slide 45: Casino - Mineral Reserve & Resource Estimates

    CASINO - MINERAL RESERVE & RESOURCE ESTIMATES RESERVE RESOURCE AT 0.25% CuEq CUT-OFF Note: based on 2013 Feasibility Study. See “Notes” in Appendix. TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Premier Copper-Gold Mine 45

  46. Slide 46: Notes

    NOTES “Casino Feasibility Study”: • Technical report entitled "Casino Project, Form 43-101 Technical Report Feasibility Study, Yukon, Canada – Revision 1" dated January 25, 2013, a copy of which is available on the Company's website at www.westerncopperandgold.com. • Prepared by Conrad E. Huss, P. E

  47. Slide 47: www.westerncopperandgold.com

    WWW.WESTERNCOPPERANDGOLD.COM INFO@WESTERNCOPPERANDGOLD.COM 604 684 9497

Western Copper and Gold — Investor Presentation (April 2020) on 6ix