Consumers Energy Company · NYSE:CMS/PB

Consumers Energy — Corporate Update

5 slides from Consumers Energy's corporate update

  1. Slide 1: Calkins Bridge Dam

    Calkins Bridge Dam PUBLICSECTORCONSULTANTS.COM 1

  2. Slide 2: Calkins Bridge Dam

    Calkins Bridge Dam PUBLICSECTORCONSULTANTS.COM 2

  3. Slide 3: Original Survey Drawings for Calkins Bridge (Allegan)

    Original Survey Drawings for Calkins Bridge (Allegan) Approximate location of dam present-day PUBLICSECTORCONSULTANTS.COM

  4. Slide 4: Calkins Bridge Hydro

    Calkins Bridge Hydro • With a generating capacity of 2,550 kilowatts, the hydro was acquired by Consumers Energy in 1969 and produces enough power to meet the needs of 1,500 residential customers. • It was built by the City of Allegan in 1935. • Calkins Bridge (Allegan Hydro) is the only hydroelectr

  5. Slide 5: General Information

    General Information FERC License Expiration Date: March 31, 2040 Dam Height (ft.): 30 Length of Dam (ft.): 1,335 Drainage Area (sq. miles): 1,550 Impoundment Area (acres): 1,600 Age (years): 87 FERC Hazard Classification: Low* Approximate Recreation Use: • Salmon and steelhead fishing • 222 docks *F

Consumers Energy Company — Corporate Update on 6ix