Trilogy Metals Inc. · TSX:TMQ

Trilogy Metals — Investor Presentation (July 2021)

54 slides from Trilogy Metals's investor presentation, July 2021

  1. Slide 1: High Grade, Safe Jurisdiction, Solid Partners

    High Grade Safe Jurisdiction Solid Partners TRUST | RESPECT | INTEGRITY Corporate Presentation | July 2021 TSX, NYSE | TMQ

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS This presentation includes certain "forward-looking information” and "forward-looking statements” (collectively "forward-looking statements”) within the meaning of applicable Canadian and United States securities legislation including the United States Private Securities L

  3. Slide 3: Forward Looking Statements / Non-GAAP Performance Measures

    FORWARD LOOKING STATEMENTS NON-GAAP PERFORMANCE MEASURES Some of the financial measures referenced in this presentation are non-GAAP performance measures. We have not reconciled forward-looking full year non-GAAP performance measures contained in this presentation to their most directly comparable G

  4. Slide 4: Trilogy's Interests in the Ambler Mining District

    TRILOGY’S INTERESTS In the Ambler Mining District COPPER ZINC GOLD SILVER billion pounds billion pounds million ounces million ounces Indicated 3.35 3.36 0.73 55.0 Inferred 5.58 0.21 0.04 3.0 with Zinc and Precious Metals a Safe, Rule of Law Jurisdiction 50/50 Ambler Mining District with JV Focused

  5. Slide 5: Share Capitalization

    SHARE CAPITALIZATION Solid, Supportive Shareholder Base WELL FUNDED BALANCE SHEET Cash ~$8.4 Million 20% Institutional No Debt South32 Ltd JV Cash & Loan Receivable 3% Management and Insiders ~$135 Million (TMQ’s Share ~$68 11% 66% Retail Million) Market Cap ~$352 Million Largely Institutionally Hel

  6. Slide 6: Corporate Highlights – Partnerships

    CORPORATE HIGHLIGHTS – PARTNERSHIPS Forming Strong Partnerships to Advance the Ambler Mining District in Alaska 1. Joint Venture 2. Local Native 3. Infrastructure Partnership Partnership Partnership with with South32 with NANA State of Alaska Agreement/Business AIDEA currently advancing Relationship

  7. Slide 7: Joint Venture Partnership with South32

    JOINT VENTURE PARTNERSHIP with South32 South32 Limited has Exercised its Option to Form a Joint Venture with Trilogy Ambler Metals LLC ~$145 million 50% Upper Kobuk 50% Mineral Projects South32, which has a market capitalization $72.5 million is attributable to each of of over $9 billion, is a globa

  8. Slide 8: Upper Kobuk Mineral Projects JV Area

    UPPER KOBUK MINERAL PROJECTS JV AREA Total Land Package of 172,675 Ha (427,690 Acres) TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 8

  9. Slide 9: Corporate Highlights – Partnerships

    CORPORATE HIGHLIGHTS – PARTNERSHIPS Forming Strong Partnerships to Advance the Ambler Mining District in Alaska 1. Joint Venture 2. Local Native 3. Infrastructure Partnership Partnership Partnership with with South32 with NANA State of Alaska Agreement/Business AIDEA currently advancing Relationship

  10. Slide 10: Ambler Mining District: Strong Local Support for Mining

    AMBLER MINING DISTRICT Strong Local Support for Mining Safe Jurisdiction – Mining District Hosts Deposits Rich in Copper, Zinc, Lead, Gold, Silver & Cobalt Politically Stable Rule of Law Recognized Mineral Potential Resource Extractive Industries are the Largest Contributors to Alaska’s Economy Well

  11. Slide 11: Corporate Highlights – Partnerships

    CORPORATE HIGHLIGHTS – PARTNERSHIPS Forming Strong Partnerships to Advance the Ambler Mining District in Alaska 1. Joint Venture 2. Local Native 3. Infrastructure Partnership Partnership Partnership with with South32 with NANA State of Alaska Agreement/Business Alaska Industrial Development Relation

  12. Slide 12: Truck Transportation Plan

    TRUCK TRANSPORTATION PLAN AIDEA Currently Advancing Road Access to Ambler Mining District Ambler Mining District 211 Miles Truck Transfer to Alaska Railroad 250 Miles Proposed Ambler Access Road 345 Miles TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 12

  13. Slide 13: NEPA Road Permitting Process (EIS)

    NEPA ROAD PERMITTING PROCESS (EIS) Bureau of Land Management is the lead agency for road permitting AIDEA is the proponent Detailed engineering has commenced on the road TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 13

  14. Slide 14: High-Grade String of Pearls

    HIGH-GRADE STRING OF PEARLS Ambler Mining District Hosts Deposits Rich in Copper, Zinc, Lead, Gold, Silver & Cobalt TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 14

  15. Slide 15: Reserves at the Arctic Project

    RESERVES AT THE ARCTIC PROJECT Probable Mineral Reserves PROBABLE MINERAL RESERVES Arctic 43,400,000 tonnes Resource @ ~4.2% Cu Eq. Outline Average Grades: 2.24% Cu 3.12% Zn 0.54% Pb 0.47 g/t Au 34.69 g/t Ag Additional Inferred Resources of 3.5 Mt, with average grades of 1.71% Cu, 2.72% Zn, 0.60% Pb

  16. Slide 16: Arctic FS – Inputs & Economic Results

    ARCTIC FS – INPUTS & ECONOMIC RESULTS Feasibility Inputs and Economic Results Mine Life 12 Years Mill Capacity 10,000 tpd Strip Ratio (Waste/Ore) 6.87:1 155M lbs Cu 192M lbs Zn Average Annual Production 32M lbs Pb 3.4M oz Ag 32,400 oz Au $3.00/lb Cu $1.10/lb Zn Base Case Metal Prices $1.00/lb Pb $18

  17. Slide 17: Arctic FS – Inputs & Economic Results – Spot Prices

    ARCTIC FS – INPUTS & ECONOMIC RESULTS – SPOT PRICES Feasibility Inputs and Economic Results Mine Life 12 Years Mill Capacity 10,000 tpd Strip Ratio (Waste/Ore) 6.87:1 155M lbs Cu 192M lbs Zn Average Annual Production 32M lbs Pb 3.4M oz Ag 32,400 oz Au $4.31/lb Cu $1.34/lb Zn Spot Metal Prices (July

  18. Slide 18: Arctic Producing Quality Concentrates

    ARCTIC PRODUCING QUALITY CONCENTRATES 3 Separate High-Quality Concentrates COPPER CONCENTRATE ZINC CONCENTRATE • 89.9% recovery • 90.6% recovery • 30.3% concentrate grade • 59.2% concentrate grade • Cu payable 96.5% • Zn payable 85% • Ag 138 g/t (4.44opt); Ag payable 90% • No significant penalty met

  19. Slide 19: Arctic Boasts Robust Economic Metrics

    ARCTIC BOASTS ROBUST ECONOMIC METRICS Profitability Index, After-Tax IRR and After-Tax NPV Benchmarking Source: Wood Mackenzie, RBC database and company disclosure Note: Project metrics shown on 100% basis (1) Profitability index calculated as after-tax NPV divided by sum of initial capex and expans

  20. Slide 20: Arctic Project Development Plan

    ARCTIC PROJECT DEVELOPMENT PLAN Overview of Mine Site – Looking Northeast TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 20

  21. Slide 21: NEPA Mine Permitting Process (EIS)

    NEPA MINE PERMITTING PROCESS (EIS) Start Permitting Process - Submit NOI for Mine Army Corp of Engineers (USACE) is expected to be the lead agency TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 21

  22. Slide 22: No Federal Lands – Easier to Permit

    NO FEDERAL LANDS – EASIER TO PERMIT Requires Federal, State and Borough Approvals ▶ 404 Wetlands Permit from the ▶ All other significant permits issued by the State of Alaska: US Army Corps of Engineers Mine Operating Permit Dam Operating Permit is the only significant Federal Air Quality Permit Wat

  23. Slide 23: District Exploration: Pearls on a String

    DISTRICT EXPLORATION Pearls on a String TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 23

  24. Slide 24: Numerous Electromagnetic Anomalies

    NUMEROUS ELECTROMAGNETIC ANOMALIES TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 24

  25. Slide 25: Numerous Electromagnetic Anomalies

    NUMEROUS ELECTROMAGNETIC ANOMALIES TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 25

  26. Slide 26: Numerous Electromagnetic Anomalies

    NUMEROUS ELECTROMAGNETIC ANOMALIES TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 26

  27. Slide 27: Sunshine Drilling Results 2019

    SUNSHINE DRILLING RESULTS 2019 1.5% CuEq From (m) To (m) Length (m) Cu (%) Zn (%) Pb (%) Au (g/t) Ag (g/t) CuEq (%)* 139.52 144.76 5.24 2.08 3.13 0.63 0.15 41.64 3.93 238.72 245.06 6.34 1.63 1.45 0.09 0.07 13.38 2.38 SC19-018 247.86 255.06 7.20 0.72 2.18 0.21 0.03 6.64 1.69 260.46 261.60 1.14 1.53 0

  28. Slide 28: Bornite Core

    BORNITE CORE TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 28

  29. Slide 29: Bornite: Testing Northern Extension

    BORNITE Testing Northern Extension COPPER COBALT 6 Billion lbs Copper billion pounds 77 Millionmillion lbs Cobalt pounds Indicated 0.91 0 Inferred 5.50 77 US$31 million expended by South32 during 35 drill holes to in-fill and 2017, 2018 & 2019 Drilling Programs expand current resources Proposed Pit

  30. Slide 30: Comparison of the Ambler VMS Belt with Other Known Belts

    COMPARISON OF THE AMBLER VMS BELT WITH OTHER KNOWN BELTS Multi-Billion Pound Copper VMS Districts of the World Dashed lines respresent area of influcence of proximal-scale alteration about each deposit Source: Franklin et al., 2005, Volcanic-associated massive sulphides, Econ.Geol., Data includes al

  31. Slide 31: 2021 Field Exploration Season

    2021 FIELD EXPLORATION SEASON Approx. 14,600 Meters of Diamond Drilling within the 172,636-hectare (426,600-acre) UKMP ARCTIC PROJECT 40 7,600 m holes drilling To further improve confidence of mineral resources, in addition to geotechnical, metallurgical & condemnation drilling NEAR-ARCTIC TARGETS 5

  32. Slide 32: 2021 Field Exploration Season – District-Area Drilling

    2021 FIELD EXPLORATION SEASON District-Area Drilling Focused on Volcanogenic Massive Sulphide (VMS) Prospects with Best Potential for Shallow Open-Pit Mineralization DISTRCT EXPLORATION 10 3,400 m holes drilling Drilling mainly focused on VMS prospects, with 1-2 holes also planned to test potential

  33. Slide 33: Getting Things Done

    GETTING THINGS DONE FEB 2020 Formed Ambler Metals LLC, a 50/50 joint venture with South 32 Ltd. Record of Decision for Ambler Access Project and 404 Permit, JUL 2020 approving the development of the northern route for a 211-mile- long gravel private industrial road access to the Ambler Mining Distri

  34. Slide 34: Upcoming Catalysts

    UPCOMING CATALYSTS News Flow H2 2021 – Optimization of Arctic Feasibility Study by Ambler Metals Fall 2021 – Assay results from 14,600 m Summer Drilling Campaign H2 2021 – Commencement of Permitting of Arctic Project TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 34

  35. Slide 35: Taikuu!

    TAIKUU! TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 35

  36. Slide 36: Copper and Cobalt: Critical for a Green Future

    COPPER AND COBALT Critical for a Green Future TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 36

  37. Slide 37: Is There Enough Supply Out There?

    IS THERE ENOUGH SUPPLY OUT THERE? A Significant Demand/Supply Deficit is Looming Source: Company data, Morgan Stanley Research estimates TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 37

  38. Slide 38: New President and CEO Tony Giardini

    NEW PRESIDENT AND CEO Tony Giardini Mr. Giardini has been a director of the Company since 2012 Was previously President of Ivanhoe Mines Ltd. which is developing its Platreef, Kipushi and Kamoa-Kakula projects Was also previously CFO of Kinross Gold Corp. which operates the Fort Knox gold mine near

  39. Slide 39: Port of Alaska is Near Anchorage

    PORT OF ALASKA IS NEAR ANCHORAGE TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 39

  40. Slide 40: Port of Alaska - Anchorage

    PORT OF ALASKA - ANCHORAGE Concentrates Loaded Directly into Ship Hold Good for the Environment Saves Money Better Green Solution TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 40

  41. Slide 41: Ambler Mining District Industrial Access Project (AMDIAP)

    AMBLER MINING DISTRICT Industrial Access Project (AMDIAP) TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 41

  42. Slide 42: Arctic Deposit: Cross Section

    ARCTIC DEPOSIT: CROSS SECTION Looking North Strip Ratio ~ 6.87:1 2020 FS Legend Aphanitic Meta-Rhyolite (AMR) Meta-Rhyolite Porphyry (MRP) Grey Schist (GS) Sulfide Horizons Quartz-Mica-Schist (QMS) Proposed Open Pit 300 m TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 42

  43. Slide 43: Arctic FS – Arctic Cash Costs

    ARCTIC FS – ARCTIC CASH COSTS Source: RBC Capital Markets, spot price as at July 7, 2021. TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 43

  44. Slide 44: Arctic Project Development Plan – Overview of Valley

    ARCTIC PROJECT DEVELOPMENT PLAN Overview of Valley – Looking Northeast TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 44

  45. Slide 45: Resource Scale vs. Resource Grade

    Resource Scale vs. Resource Grade RESOURCES(1) (BN LB CU EQ.) VS. RESOURCE GRADE(1) (% CU EQ.) 4.0% Low Geopolitical Risk Medium Geopolitical Risk High Geopolitical Risk 79.1 Ivanhoe 3.5% Market Capitalization US$100 mm 3.0% Arizona Mining (2) Higher Resource Grade 2.5% Resource Grade (% Cu Eq.) Tri

  46. Slide 46: Reserve Estimate for Arctic Project

    RESERVE ESTIMATE FOR ARCTIC PROJECT Tonnage Average Grade: Category Cu Zn Pb Au Ag t x 1000 (%) (%) (%) (g/t) (g/t) Proven Mineral Reserves - - - - - - Probable Mineral Reserves 43,442 2.24 3.12 0.54 0.47 34.69 Proven & Probable Mineral Reserves 43,442 2.24 3.12 0.54 0.47 34.69 Waste within Designed

  47. Slide 47: Naturally Diversified

    NATURALLY DIVERSIFIED COPPER ZINC GOLD SILVER billion pounds billion pounds million ounces million ounces Indicated 3.35 3.36 0.73 55.0 Inferred 5.58 0.21 0.04 3.0 Resource Category Tonnes Millions Grade (%) Contained Metal (Mlbs) COPPER Indicated 36.0 3.07 2,441 Arctic Inferred 3.5 1.71 131 Indicat

  48. Slide 48: Mineral Resources for the Arctic & Bornite Projects

    MINERAL RESOURCES for the Arctic & Bornite Projects 4 Tonnes Cu Cu Eq Tonnes Tonnes Deposit Cut-off Cu% Zn% Pb% Ag g/t Au g/t 4 (M) (Mlbs) (Mlbs) Cu Cu Eq INDICATED Arctic1 0.5% Cu 36.0 3.07 4.23 0.73 47.6 0.63 2,441 4,376 1,107,200 1,984,900 Bornite (In-Pit)2 0.5% Cu 40.5 1.02 913 913 413,000 413,0

  49. Slide 49: NI 43-101 Compliant Resources

    NI 43-101 COMPLIANT RESOURCES CAUTIONARY NOTE CONCERNING RESOURCE ESTIMATES This summary table may use the term "resources", "measured resources", "indicated resources" and "inferred resources". United States investors are advised that, while such terms are recognized and required by Canadian securi

  50. Slide 50: Mineral Resources – Definitions & Notes

    MINERAL RESOURCES for the Arctic & Bornite Projects DEFINITIONS & NOTES Mineral Resources: “measured”, “indicated” and “inferred” mineral resources are estimated in accordance with the definitions of these terms adopted by the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) in Novembe

  51. Slide 51: Disclosure Regarding Scientific and Technical Information

    DISCLOSURE Regarding Scientific and Technical Information Unless otherwise indicated, all reserve and resource estimates included in this presentation have been prepared in accordance with Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian

  52. Slide 52: Funding Requirements vs. Valuation

    Funding Requirements vs. Valuation P / NAV (RATIO) VS. INITIAL CAPEX / MARKET CAPITALIZATION (%) 3,000% Low Geopolitical Risk Medium Geopolitical Risk High Geopolitical Risk 2,500% Resources (1) 20.0 bn lb Cu Eq. Lower Funding Requirement Initial Capex / Market Capitalization (%) 2,000% Northern Dyn

  53. Slide 53: Capital Requirements

    Capital Requirements CAPITAL INTENSITY (US$/LB CU EQ. PRODUCTION) VS. INITIAL CAPEX (US$ MM) Low Geopolitical Risk Medium Geopolitical Risk High Geopolitical Risk $6,000 LOM Avg. Production 100 mm lb Cu Eq. Northern $5,000 Dynasty Lower Capital Requirements $4,000 Initial Capex (US$ mm) Josemaria $3

  54. Slide 54: Corporate Office – NYSE American, TSX: TMQ

    TRUST | RESPECT | INTEGRITY Corporate Office Suite 1150 – 609 Granville Street Vancouver, British Columbia, V7Y 1G5 Canada Toll Free 1.855.638.8088 NYSE American, TSX: TMQ www.trilogymetals.com TRUST | RESPECT | INTEGRITY TSX, NYSE | TMQ 54

Trilogy Metals — Investor Presentation (July 2021) on 6ix