  1. Slide 1: Presentation to 2015 Annual General Meeting

    ENERGY WORLD CORPORATION LTD. 9A Seaforth Crescent Tel: (61 2) 9247 6888 Seaforth, NSW, 2092 Fax: (61 2) 9247 6100 20 November 2015 For personal use only The Listing Manager Company Announcement Platform ASX Limited Total no. of page(s): 1 + Presentation PRESENTATION TO 2015 ANNUAL GENERAL MEETING A

  2. Slide 2: Delivering Clean Energy

    For personal use only DELIVERING CLEAN ENERGY Presentation to Shareholders of Energy World Corporation Annual General Meeting 20 November 2015 ENERGY WORLD CORPORATION LTD

  3. Slide 3: Disclaimer

    Disclaimer Strictly Confidential & Patents Pending For personal use only These materials have been prepared by Energy World Group (the "Company") solely for information use during this presentation. These materials may not be copied, reproduced, passed on or redistributed, directly or indirectly, to

  4. Slide 4: Financial Highlights 2015

    Strictly Confidential & Patents Pending For personal use only Financial Highlights 2015 Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  5. Slide 5: Financial Highlights – Revenue

    Financial Highlights – Revenue Strictly Confidential & Patents Pending Revenue has significantly increased by 61% over the past five-year For personal use only period from USD110.3 million to USD177.2 million. Revenue 200 180 160 140 USD Millions 120 Australia: Oil & Gas 100 Australia: Power 80 Indo

  6. Slide 6: Financial Highlights – Gross Profit

    Financial Highlights – Gross Profit Strictly Confidential & Patents Pending Gross profit has increased 71% for the past five-year period from For personal use only USD61.9 million to USD105.9 million. Gross Profit 120 100 80 USD Millions 60 40 20 - FY2011 FY2012 FY2013 FY2014 FY2015 Strictly Confide

  7. Slide 7: Financial Highlights – Fixed Assets

    Financial Highlights – Fixed Assets Strictly Confidential & Patents Pending Fixed assets has increased significantly by 158% over the last five For personal use only years from USD517.8 million to USD1,336.6 million. Oil & Gas Assets, PP&E, Assets Under Construction and Exploration & Evaluation Asse

  8. Slide 8: Project Development Requirement

    Project Development Requirement Strictly Confidential & Patents Pending HARDWARE For personal use only • Processing Engineering • Equipment Design • Civil Engineering • Land Acquisition • E.P.C. Contractor SOFTWARE FINANCING • Permits • Equity • Environmental • Debt • Cultural Heritage • Project Fin

  9. Slide 9: Project Funding Plan Update

    Project Funding Plan Update Strictly Confidential & Patents Pending Standard Chartered Bank For personal use only Phase I – Financing USD’m has been appointed as our 1. Convertible Note 50 Financial Adviser to coordinate 2. DBP for Philippine Power Plant 150 the structuring and arranging 3. SCB Bond

  10. Slide 10: LNG and Power – Loan Agreement Signing Ceremony

    Philippines – Pagbilao LNG and Power Strictly Confidential & Patents Pending Omnibus Loan and Security Agreement Signing Ceremony For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  11. Slide 11: LNG and Power – Presentation to Lenders

    Philippines – Pagbilao LNG and Power Strictly Confidential & Patents Pending Presentation to Lenders: DBP Bank, Asia United Bank and Land Bank For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  12. Slide 12: LNG and Power – Site Visit by Lenders

    Philippines – Pagbilao LNG and Power Strictly Confidential & Patents Pending Site Visit by DBP Bank, AUB Bank and Land Bank of the Philippines For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  13. Slide 13: LNG and Power – Site Visit from Lenders

    Philippines – Pagbilao LNG and Power Strictly Confidential & Patents Pending Site Visit from Land Bank, AUB Bank, SCB and other lenders For personal use only 11 Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  14. Slide 14: LNG Hub Terminal – Directors site visit

    Philippines – Pagbilao LNG Hub Terminal Strictly Confidential & Patents Pending Directors site visit For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  15. Slide 15: LNG Hub Terminal – Directors site visit

    Philippines – Pagbilao LNG Hub Terminal Strictly Confidential & Patents Pending Directors site visit For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  16. Slide 16: Indonesia – Sengkang LNG – Mandiri Bank Site Visit

    Indonesia – Sengkang LNG Strictly Confidential & Patents Pending Site Visit by Mandiri Bank & Rinder Energia-Consultant Mandiri Bank For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  17. Slide 17: Indonesia – Sengkang LNG – Mandiri Bank Site Visit

    Indonesia – Sengkang LNG Strictly Confidential & Patents Pending Site Visit by Mandiri Bank & Rinder Energia-Consultant Mandiri Bank For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  18. Slide 18: Indonesia – Sengkang LNG – Bank Site Visit

    Indonesia – Sengkang LNG Strictly Confidential & Patents Pending Site Visit by Bank Mandiri, Bank BRI, ICBC and Indonesia Infrastructure Finance For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  19. Slide 19: Indonesia – Sengkang LNG – Bank Site Visit

    Indonesia – Sengkang LNG Strictly Confidential & Patents Pending Site Visit by Bank Mandiri, Bank BRI, ICBC and Indonesia Infrastructure Finance For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  20. Slide 20: Indonesia – Sengkang LNG – Mitsui Site Visit

    Indonesia – Sengkang LNG Strictly Confidential & Patents Pending Site Visit by Mitsui & Co., Ltd. Tokyo For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  21. Slide 21: Indonesia – Sengkang LNG – Mitsui Site Visit

    Indonesia – Sengkang LNG Strictly Confidential & Patents Pending Site Visit by Mitsui & Co., Ltd. Tokyo For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  22. Slide 22: Indonesia – Sengkang LNG – Mitsui Site Visit

    Indonesia – Sengkang LNG Strictly Confidential & Patents Pending Site Visit by Mitsui & Co., Ltd. Tokyo For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  23. Slide 23: Indonesia – Sengkang LNG – Investor Site Visit

    Indonesia – Sengkang LNG Strictly Confidential & Patents Pending Site Visit from management and Investor (Capital Group & Heyokha Brothers) For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  24. Slide 24: Business Opportunity - LNG

    Business Opportunity - LNG Strictly Strictly Confidential For personal use only Confidential & Patents & Patents Pendin Pending g StrictlyConfidential Strictly Confidential&&Patents PatentsPending Pending ENERGY WORLD GROUP

  25. Slide 25: Teaming up with industry leaders on Modular LNG

    Teaming up with industry leaders on Modular LNG Strictly Confidential & Patents Pending For personal use only ENERGY WORLD Investor, Developer & Operator LNG process provider Electrical and rotating Cold boxes equipment Gas treatment (By TDE) Slipform Engineering – civil works, Electrical BOP Liquef

  26. Slide 26: Sengkang Production Sharing Contract (PSC)

    Strictly Confidential & Patents Pending For personal use only Sengkang Production Sharing Contract (PSC) Indonesia Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  27. Slide 27: Indonesia – Sengkang Gas

    Indonesia – Sengkang Gas Strictly Confidential & Patents Pending For personal use only Sengkang PSC The Sengkang PSC Block is located in the province of South Sulawesi. The PSC is operated by Energy Equity Epic Sengkang (“EEES”) which is 100% owned by EWC. Gas from the PSC is supplied to the Sengkan

  28. Slide 28: Indonesia – Sengkang Gas

    Indonesia – Sengkang Gas Strictly Confidential & Patents Pending Gas Processing Plant in Sengkang Indonesia with expansion For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  29. Slide 29: Sengkang Power Station

    Strictly Confidential & Patents Pending For personal use only Sengkang Power Station Indonesia Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  30. Slide 30: Indonesia – Sengkang Power

    Indonesia – Sengkang Power Strictly Confidential & Patents Pending Sengkang Power Station Block 1 and Block 2 For personal use only Block 2 Aerial view of Sengkang Power Plant Block 1 Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  31. Slide 31: Sengkang LNG Plant

    Strictly Confidential & Patents Pending For personal use only Sengkang LNG Plant Indonesia Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  32. Slide 32: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  33. Slide 33: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG View of LNG Plant Site Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  34. Slide 34: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG LNG Tank and Cold Box Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  35. Slide 35: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Progress of Main Processing Plant Area Strictly Confidential & Patents Pending For personal use only Main Processing Plant Area in July 2014 Main Processing Plant Area in November 2015 Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  36. Slide 36: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Main Processing Plant Area Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  37. Slide 37: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Main Processing Plant Area Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  38. Slide 38: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG LNG Tank and Pre-treatment Train 1 & 2 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  39. Slide 39: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Main Processing Plant Area Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  40. Slide 40: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Main Processing Plant Area Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  41. Slide 41: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Main Processing Plant Area Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  42. Slide 42: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Main Processing Plant Area Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  43. Slide 43: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Main Processing Plant Area Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  44. Slide 44: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Fabrication & Installation of ICP Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  45. Slide 45: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Fabrication & Installation of ICP Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  46. Slide 46: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Fabrication & Installation of ICP Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  47. Slide 47: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Main Processing Plant Area Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  48. Slide 48: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Construction of Marine Jetty Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  49. Slide 49: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Strictly Confidential & Patents Pending Assembling Cutter Suction Dredger & Working Boat in Progress For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  50. Slide 50: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Strictly Confidential & Patents Pending Fender Photos - Front Panel, Face Pad For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  51. Slide 51: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Strictly Confidential & Patents Pending Quick Release Hooks Ready for Installation For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  52. Slide 52: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Strictly Confidential & Patents Pending View of the Tank For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  53. Slide 53: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Progress of the LNG Tank Strictly Confidential & Patents Pending For personal use only LNG Tank in July 2014 LNG Tank in October 2014 Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  54. Slide 54: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Construction of the LNG Tank – Roof Formwork in March 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  55. Slide 55: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Construction of the LNG Tank – Roof Dome in April 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  56. Slide 56: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Construction of the LNG Tank – Roof Dome in April 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  57. Slide 57: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Construction of the LNG Tank – Roof Dome in May 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  58. Slide 58: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Construction of the LNG Tank – Roof Dome in May 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  59. Slide 59: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Construction of the LNG Tank – Roof Dome in June 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  60. Slide 60: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Construction of the LNG Tank – Roof Dome in June 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  61. Slide 61: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Construction of the LNG Tank – Roof Dome in July 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  62. Slide 62: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Construction of the LNG Tank – Roof Dome in August 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  63. Slide 63: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Construction of the LNG Tank – Roof Dome in September 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  64. Slide 64: Indonesia – Sengkang LNG – Auditor Site Visit

    Indonesia – Sengkang LNG Strictly Confidential & Patents Pending Site Visit by Ernst & Young Auditor For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  65. Slide 65: Indonesia – Sengkang LNG – SKK Migas Site Visit

    Indonesia – Sengkang LNG Strictly Confidential & Patents Pending Site Visit by SKK Migas Republic Indonesia For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  66. Slide 66: Indonesia – Sengkang LNG – Directors site visit

    Indonesia – Sengkang LNG Strictly Confidential & Patents Pending Directors site visit For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  67. Slide 67: Indonesia – Sengkang LNG – Directors site visit

    Indonesia – Sengkang LNG Strictly Confidential & Patents Pending Directors site visit For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  68. Slide 68: Indonesia – Sengkang LNG – Directors site visit

    Indonesia – Sengkang LNG Strictly Confidential & Patents Pending Directors site visit For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  69. Slide 69: Our LNG Projects – LNG Hub Terminal and Power Plant

    Strictly Confidential & Patents Pending For personal use only Our LNG Projects The Philippines – Pagbilao LNG Hub Terminal and Power Plant LNG Hub Terminal Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  70. Slide 70: LNG Hub Terminal – Pagbilao

    Philippines – Pagbilao LNG Hub Terminal Strictly Confidential & Patents Pending For personal use only Pagbilao LNG Hub Terminal Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  71. Slide 71: LNG Hub Terminal

    Philippines – Pagbilao LNG Hub Terminal Strictly Confidential & Patents Pending For personal use only LNG TANK PAGBILAO LNG HUB TERMINAL AND POWER PLANT DELIVERING CLEAN AND GREEN ENERGY Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  72. Slide 72: Pagbilao LNG Terminal

    Philippines – Pagbilao LNG Hub Terminal Strictly Confidential & Patents Pending For personal use only Pagbilao LNG Terminal: PHILIPPINES  Terminal will act as a hub for onward distribution of LNG throughout the Philippines  Energy World Group will develop a 600MW CCGT power plant at this site Mani

  73. Slide 73: LNG Hub Terminal – View of the Site

    Philippines – Pagbilao LNG Hub Terminal View of the Site Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  74. Slide 74: LNG Hub Terminal – View of the Site

    Philippines – Pagbilao LNG Hub Terminal View of the Site Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  75. Slide 75: LNG Hub Terminal – View of the Site

    Philippines – Pagbilao LNG Hub Terminal View of the Site Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  76. Slide 76: LNG and Power – Site Visit by Cong. Umali

    Philippines – Pagbilao LNG and Power Site Visit by Cong. Reynaldo Umali and Mr. Stewart Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  77. Slide 77: LNG and Power – Project Presentation

    Philippines – Pagbilao LNG and Power Site Visit by Cong. Reynaldo Umali - Project Presentation by Mr. Stewart Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  78. Slide 78: LNG and Power – Site Visit by Cong. Umali

    Philippines – Pagbilao LNG and Power Site Visit by Cong. Reynaldo Umali Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  79. Slide 79: LNG and Power – Site Visit by Constituents

    Philippines – Pagbilao LNG and Power Site Visit by Cong. Umali’s Constituents Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  80. Slide 80: LNG and Power – Site Visit by Department of Energy

    Philippines – Pagbilao LNG and Power Site Visit by The Department of Energy, Philippines Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  81. Slide 81: LNG and Power – Site Visit by Department of Energy

    Philippines – Pagbilao LNG and Power Site Visit by The Department of Energy, Philippines Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  82. Slide 82: LNG Hub Terminal – Site Visit by Arup

    Philippines – Pagbilao LNG Hub Terminal Site Visit by Arup Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  83. Slide 83: LNG Hub Terminal – Directors site visit

    Philippines – Pagbilao LNG Hub Terminal Strictly Confidential & Patents Pending Directors site visit For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  84. Slide 84: LNG Hub Terminal – Directors site visit

    Philippines – Pagbilao LNG Hub Terminal Strictly Confidential & Patents Pending Directors site visit For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  85. Slide 85: LNG Hub Terminal – Directors site visit

    Philippines – Pagbilao LNG Hub Terminal Strictly Confidential & Patents Pending Directors site visit For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  86. Slide 86: LNG Hub Terminal – Site visit by Chart Energy

    Philippines – Pagbilao LNG Hub Terminal Strictly Confidential & Patents Pending Site visit by Chart Energy Kevin J. Blount For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  87. Slide 87: LNG Hub Terminal – Site visit by Chart Energy

    Philippines – Pagbilao LNG Hub Terminal Strictly Confidential & Patents Pending Site visit by Chart Energy Kevin J. Blount For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  88. Slide 88: LNG Hub Terminal – LNG Jetty

    Strictly Confidential & Patents Pending For personal use only Philippines – Pagbilao LNG Hub Terminal LNG Jetty Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  89. Slide 89: Layout Plan of Jetty Area

    Our LNG Projects The Philippines - LNG Hub Terminal and Power Plant Strictly Confidential & Patents Pending Layout Plan of Jetty Area For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  90. Slide 90: LNG Hub Terminal – Progress of the Jetty

    Philippines – Pagbilao LNG Hub Terminal Progress of the Jetty Strictly Confidential & Patents Pending For personal use only Jetty in July 2014 Jetty in November 2015 Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  91. Slide 91: Construction of Jetty Area in March 2015

    Philippines – Pagbilao LNG Hub Terminal Construction of Jetty Area in March 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  92. Slide 92: Construction of Jetty Area in April 2015

    Philippines – Pagbilao LNG Hub Terminal Construction of Jetty Area in April 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  93. Slide 93: Construction of Jetty Area in April 2015

    Philippines – Pagbilao LNG Hub Terminal Construction of Jetty Area in April 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  94. Slide 94: Erection of Marine Loading Arms in April 2015

    Philippines – Pagbilao LNG Hub Terminal Erection of Marine Loading Arms in April 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  95. Slide 95: Construction of Jetty Area in June 2015

    Philippines – Pagbilao LNG Hub Terminal Construction of Jetty Area in June 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  96. Slide 96: Installation of the Control Room in November 2015

    Philippines – Pagbilao LNG Hub Terminal Installation of the Control Room in November 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  97. Slide 97: Installation of the Control Room in November 2015

    Philippines – Pagbilao LNG Hub Terminal Installation of the Control Room in November 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  98. Slide 98: Installation of the Control Room in November 2015

    Philippines – Pagbilao LNG Hub Terminal Installation of the Control Room in November 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  99. Slide 99: Construction of Jetty Area in August 2015

    Philippines – Pagbilao LNG Hub Terminal Construction of Jetty Area in August 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  100. Slide 100: Construction of Jetty Area in October

    Philippines – Pagbilao LNG Hub Terminal Construction of Jetty Area in October 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  101. Slide 101: Construction of Jetty Area in October

    Philippines – Pagbilao LNG Hub Terminal Construction of Jetty Area in October 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  102. Slide 102: Construction of Jetty Area in October 2015

    Philippines – Pagbilao LNG Hub Terminal Construction of Jetty Area in October2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  103. Slide 103: Installation of the Marine Dolphins in November 2015

    Philippines – Pagbilao LNG Hub Terminal Installation of the Marine Dolphins in November 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  104. Slide 104: Installation of the Transmission Piping in October 2015

    Philippines – Pagbilao LNG Hub Terminal Installation of the Transmission Piping in October 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  105. Slide 105: Installation of the Transmission Piping in October 2015

    Philippines – Pagbilao LNG Hub Terminal Installation of the Transmission Piping in October 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  106. Slide 106: Installation of the Transmission Piping in October 2015

    Philippines – Pagbilao LNG Hub Terminal Installation of the Transmission Piping in October 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  107. Slide 107: Arrival of Cryogenic LNG Transfer System

    Philippines – Pagbilao LNG Hub Terminal Strictly Confidential & Patents Pending Arrival of Cryogenic LNG Transfer System For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  108. Slide 108: Fender Photos - Body

    Philippines – Pagbilao LNG Hub Terminal Strictly Confidential & Patents Pending Fender Photos - Body For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  109. Slide 109: LR inspection process Photos

    Philippines – Pagbilao LNG Hub Terminal Strictly Confidential & Patents Pending LR inspection process Photos For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  110. Slide 110: Quick Release Hooks Ready for Installation

    Philippines – Pagbilao LNG Hub Terminal Strictly Confidential & Patents Pending Quick Release Hooks Ready for Installation For personal use only 108 Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  111. Slide 111: LNG Hub Terminal – LNG Storage Tank

    Strictly Confidential & Patents Pending For personal use only Philippines – Pagbilao LNG Hub Terminal LNG Storage Tank Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  112. Slide 112: LNG Hub Terminal – View of The Tank

    Philippines – Pagbilao LNG Hub Terminal View of The Tank Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  113. Slide 113: Progress of LNG Tank

    Philippines – Pagbilao LNG Hub Terminal Progress of LNG Tank Strictly Confidential & Patents Pending For personal use only LNG Tank in July 2014 LNG Tank in May 2015 Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  114. Slide 114: Construction of Roof Dome in January 2015

    Philippines – Pagbilao LNG Hub Terminal Construction of Roof Dome in January 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  115. Slide 115: Construction of Roof Dome in January 2015

    Philippines – Pagbilao LNG Hub Terminal Construction of Roof Dome in January 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  116. Slide 116: Construction of Roof Dome in February 2015

    Philippines – Pagbilao LNG Hub Terminal Construction of Roof Dome in February 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  117. Slide 117: Construction of Roof Dome in March 2015

    Philippines – Pagbilao LNG Hub Terminal Construction of Roof Dome in March 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  118. Slide 118: Construction of Roof Dome in April 2015

    Philippines – Pagbilao LNG Hub Terminal Construction of Roof Dome in April 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  119. Slide 119: Construction of Roof Dome in April 2015

    Philippines – Pagbilao LNG Hub Terminal Construction of Roof Dome in April 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  120. Slide 120: Construction of Roof Dome in May 2015

    Philippines – Pagbilao LNG Hub Terminal Construction of Roof Dome in May 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  121. Slide 121: Construction of Roof Dome in May 2015

    Philippines – Pagbilao LNG Hub Terminal Construction of Roof Dome in May 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  122. Slide 122: Construction of Roof Dome in May 2015

    Philippines – Pagbilao LNG Hub Terminal Construction of Roof Dome in May 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  123. Slide 123: Construction of Roof Dome in May 2015

    Philippines – Pagbilao LNG Hub Terminal Construction of Roof Dome in May 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  124. Slide 124: Construction of Scaffolding at Buttress Area of LNG Tank

    Philippines – Pagbilao LNG Hub Terminal Construction of Scaffolding at Buttress Area of LNG Tank in October 2015 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  125. Slide 125: Site Formation of LNG Tank

    Philippines – Pagbilao LNG Hub Terminal Site Formation of LNG Tank No. 2 Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  126. Slide 126: Power – Regasification Facility

    Strictly Confidential & Patents Pending For personal use only Philippines – Pagbilao Power Regasification Facility For 650 MW Power Station Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  127. Slide 127: Regasification Facility – Vaporizer Unit

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Regasification Facility – Vaporizer Unit For personal use only General Arrangement Water Inlet / Outlet Water Inlet / Outlet ANSI Flange ANSI Flange Cryogen Outlet Carbon Steel Shell Stainless Steel Bundle ASME Code ASME Code Shop

  128. Slide 128: Regasification Facility – Vaporizer Unit

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Regasification Facility – Vaporizer Unit For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  129. Slide 129: Regasification Facility – Vaporizer Unit under Testing

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Regasification Facility – Vaporizer Unit under Testing For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  130. Slide 130: Installation of Regasification Facility

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Installation of Regasification Facility For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  131. Slide 131: Installation of Regasification Facility

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Installation of Regasification Facility For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  132. Slide 132: Installation of Regasification Facility

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Installation of Regasification Facility For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  133. Slide 133: Installation of Regasification Facility

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Installation of Regasification Facility For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  134. Slide 134: Power – Combined Cycle Gas Fired Power Station

    Strictly Confidential & Patents Pending For personal use only Philippines – Pagbilao Power 650 MW Combined Cycle Gas Fired Power Station Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  135. Slide 135: View of Power Station Site

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending View of Power Station Site For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  136. Slide 136: Progress of Power Station

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Progress of Power Station For personal use only Power Plant in July 2014 Power Plant in November 2015 Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  137. Slide 137: Construction of Power Station in January 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Power Station in January 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  138. Slide 138: Construction of Power Station in March 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Power Station in March 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  139. Slide 139: Construction of Power Station in March 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Power Station in March 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  140. Slide 140: Construction of Power Station in April 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Power Station in April 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  141. Slide 141: Construction of Power Station in April 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Power Station in April 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  142. Slide 142: Construction of Power Station in April 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Power Station in April 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  143. Slide 143: Construction of Power Station in May 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Power Station in May 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  144. Slide 144: Construction of Power Station in May 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Power Station in May 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  145. Slide 145: Construction of Power Station in June 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Power Station in June 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  146. Slide 146: Construction of Power Station in June 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Power Station in June 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  147. Slide 147: Construction of Power Station in June 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Power Station in June 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  148. Slide 148: Construction of Power Station in July 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Power Station in July 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  149. Slide 149: Construction of Power Station in July 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Power Station in July 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  150. Slide 150: Construction of Power Station in August 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Power Station in August 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  151. Slide 151: Construction of Power Station in August 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Power Station in August 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  152. Slide 152: Construction of Power Station in October 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Power Station in October 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  153. Slide 153: Construction of Power Station in October 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Power Station in October 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  154. Slide 154: Construction of Power Station in November 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Power Station in November 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  155. Slide 155: Construction of Power Station in November 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Power Station in November 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  156. Slide 156: Construction of Power Station in November 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Power Station in November 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  157. Slide 157: Construction of Power Station in November 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Power Station in November 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  158. Slide 158: Construction of Control Room / Admin. Building

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Control Room / Admin. Building For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  159. Slide 159: Construction of Steam Turbine Foundation in November 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Steam Turbine Foundation in November 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  160. Slide 160: Construction of Steam Turbine Foundation in November 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Steam Turbine Foundation in November 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  161. Slide 161: Construction of Steam Turbine Foundation in November 2015

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Steam Turbine Foundation in November 2015 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  162. Slide 162: Manufacture of Steam Turbine Equipment

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Manufacture of Steam Turbine Equipment For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  163. Slide 163: Steam Turbine Photos

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Steam Turbine Photos For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  164. Slide 164: HI Rotor & LP Rotor Photos

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending HI Rotor & LP Rotor Photos For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  165. Slide 165: Steam Turbine Generator

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Steam Turbine Generator For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  166. Slide 166: Construction of Resettlement House

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Resettlement House For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  167. Slide 167: Construction of Resettlement House

    Philippines – Pagbilao Power Strictly Confidential & Patents Pending Construction of Resettlement House For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  168. Slide 168: Demand for Clean and Green Energy in the Philippines

    Philippines – Power Generation Strictly Confidential & Patents Pending Demand for Clean and Green Energy in the Philippines For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  169. Slide 169: Demand for Clean and Green Energy in the Philippines

    Philippines – Power Generation Strictly Confidential & Patents Pending Demand for Clean and Green Energy in the Philippines For personal use only Prepared by SHELL Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  170. Slide 170: Australian Projects

    Australian Projects Strictly Confidential & Patents Pending For personal use only Alice Springs Eromanga Gilmore Australia Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  171. Slide 171: Our Australian Projects – Alice Springs Power and LNG

    Strictly Confidential & Patents Pending For personal use only Our Australian Projects Alice Springs Power and LNG Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  172. Slide 172: Alice Springs Power and LNG – 18 years of safe LNG operation

    Australia – Alice Springs Power and LNG Strictly Confidential & Patents Pending  EWC has over 18 years of Safe Operation of LNG production in Australia For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  173. Slide 173: Alice Springs 10,000 TPA LNG Plant

    Australia – Alice Springs Power and LNG Strictly Confidential & Patents Pending Alice Springs 10,000 TPA LNG Plant For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  174. Slide 174: Alice Springs 10,000 TPA LNG Plant

    Australia – Alice Springs Power and LNG Strictly Confidential & Patents Pending Alice Springs 10,000 TPA LNG Plant For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  175. Slide 175: Alice Springs 10,000 TPA LNG Plant

    Australia – Alice Springs Power and LNG Strictly Confidential & Patents Pending Alice Springs 10,000 TPA LNG Plant For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  176. Slide 176: Alice Springs 10,000 TPA LNG Plant

    Australia – Alice Springs Power and LNG Strictly Confidential & Patents Pending Alice Springs 10,000 TPA LNG Plant For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  177. Slide 177: Alice Springs 8.68MW Power Station

    Australia – Alice Springs Power and LNG Strictly Confidential & Patents Pending Alice Springs 8.68MW Power Station For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  178. Slide 178: Alice Springs 8.68MW Power Station

    Australia – Alice Springs Power and LNG Strictly Confidential & Patents Pending Alice Springs 8.68MW Power Station For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  179. Slide 179: Alice Springs 8.68MW Power Station

    Australia – Alice Springs Power and LNG Strictly Confidential & Patents Pending Alice Springs 8.68MW Power Station For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  180. Slide 180: Our Australian Projects – Gilmore LNG

    Strictly Confidential & Patents Pending For personal use only Our Australian Projects Gilmore LNG Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  181. Slide 181: Australia – Gilmore LNG Project: Proposed Markets

    Australia – Gilmore LNG Project Strictly Confidential & Patents Pending For personal use only Proposed Markets • The Gilmore LNG facility will be a major link in our development program for Australia and will be primarily focused on the Eastern States including the Northern Territory and South Austr

  182. Slide 182: Gilmore LNG Master Layout

    Australia – Gilmore LNG Project Strictly Confidential & Patents Pending Gilmore LNG Master Layout For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  183. Slide 183: Erection of Process Equipment

    Australia – Gilmore LNG Project Strictly Confidential & Patents Pending Erection of Process Equipment For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  184. Slide 184: Erection of Process Equipment

    Australia – Gilmore LNG Project Strictly Confidential & Patents Pending Erection of Process Equipment For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  185. Slide 185: Erection of Process Equipment

    Australia – Gilmore LNG Project Strictly Confidential & Patents Pending Erection of Process Equipment For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  186. Slide 186: South Australia - Southern Cooper Project (PEL 96)

    Strictly Confidential & Patents Pending For personal use only Our Australian Projects South Australia - Southern Cooper Project (PEL 96) Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  187. Slide 187: Australia – PEL Southern Cooper Gas

    Australia – PEL 96 Southern Cooper Gas Strictly Confidential & Patents Pending Australia For personal use only PEL 96 Percentag • 33.3% e Interest of EWC Gas / Oil • Gas potential of 8 - 20 TCF* PEL 96 Operating • Strike Oil Limited Party EWC portion 2.50 – 6.50 TCF Production • PEL obtained 13 May

  188. Slide 188: Le Chiffre (PEL96) – Well Location

    Australia – PEL 96 Southern Cooper Gas Le Chiffre 1 (PEL96) – Well Location Strictly Confidential & Patents Pending For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  189. Slide 189: Ongoing Production Testing at PEL96

    Australia – PEL 96 Southern Cooper Gas Strictly Confidential & Patents Pending Ongoing Production Testing at PEL96 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  190. Slide 190: Strike Energy at PEL96

    Australia – PEL 96 Southern Cooper Gas Strictly Confidential & Patents Pending Strike Energy at PEL96 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  191. Slide 191: Strike Energy at PEL96

    Australia – PEL 96 Southern Cooper Gas Strictly Confidential & Patents Pending Strike Energy at PEL96 For personal use only Strictly Confidential & Patents Pending ENERGY WORLD GROUP

  192. Slide 192: Future Outlook

    Future Strictly Confidential & Patents Pending For personal use only • FY2016/2017 revenue enhanced by commercial operations of Sengkang LNG, Philippines Hub, and Philippines Power Plant Short to medium • Significant transition period from development to operation • Commercialisation of LNG projects

  193. Slide 193: Many Thanks from Energy World

    Strictly Confidential & Patents Pending For personal use only Many Thanks from Energy World Delivering Clean and Green Energy to Asia Whatever Quantity You Require EWG20151118 Strictly Confidential & Patents Pending ENERGY WORLD GROUP