Gogold Resources, Inc. · TSX:GGD

Gogold Resources — Investor Presentation (September 2026)

27 slides from Gogold Resources's investor presentation, September 2026

  1. Slide 1: Corporate Presentation

    CORPORATE PRESENTATION SEPTEMBER 2026 TSXGGD OTCGLGDF gogoldresources.com

  2. Slide 2: Forward Looking Information

    FORWARD LOOKING INFORMATION This investor presentation contains certain statements, which may constitute “forward-looking information” under Canadian securities law requirements and “forward looking statements” under applicable securities laws (“forward-looking information”). All statements other th

  3. Slide 3: Experienced Management Team

    EXPERIENCED MANAGEMENT TEAM Brad Langille President & CEO Co-Founder, Major Shareholder Dana Hatfield Anis Nehme CFO COO Previously Managed Companies Market Cap: Market Cap: $0 $2.2 Billion Market Cap: m e x g old Mexgold Resources Inc $5 Million Sold for: $375 Million Market Cap: Market Cap: $40 Mi

  4. Slide 4: Capital Structure

    CAPITAL STRUCTURE Basic Shares Outstanding 434 million Institutional Holders Warrants Outstanding (Nov 28 - $68M USD) 27 million Options and DSUs Outstanding 14 million • Van Eck Associates • MMCAP Fully Diluted 475 million • Franklin Templeton • Konwave • Sprott Asset Management • Palisades Goldcor

  5. Slide 5: Environmental, Sustainability, Governance (ESG)

    ENVIRONMENTAL, SUSTAINABILITY, GOVERNANCE (ESG) Awarded the ESR distinction (Empresa Socialmente Responsables – Corporate Social Responsibility) for sixth year. ELSSA distinction from the Instituto Mexicano del Seguro Social (IMSS), a public healthcare and social security institution in Mexico, for

  6. Slide 6: GoGold Properties

    GOGOLD PROPERTIES Status: Sold • Purchased by Agnico Eagle Mines • Total of $20m invested, sold for $95m 3 years later. Status: In Production • Production • 2025 – 2.1M AgEq • 2024 – 1.5M AgEq • 2023 – 1.5M AgEq • 2022 – 1.8M AgEq • 2021 – 2.2M AgEq • 2020 – 2.3M AgEq • 2019 – 1.8M AgEq Status: Deve

  7. Slide 7: Los Ricos

    LOS RICOS TSXGGD OTCGLGDF gogoldresources.com

  8. Slide 8: Los Ricos South Mineral Resource

    LOS RICOS SOUTH MINERAL RESOURCE 1) Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.

  9. Slide 9: South Mineral Reserve

    LOS RICOS SOUTH MINERAL RESERVE 1) Mineral Reserves are based on Measured and Indicated Mineral Resource Classifications only. 2) Mineral Reserves are reported using the 2014 CIM Definition Standards and 2019 Best Practices Guidelines and have an effective date of January 14, 2025. 3) Mineral Reserv

  10. Slide 10: South Feasibility Study – Highlights

    LOS RICOS SOUTH FEASIBILITY STUDY – HIGHLIGHTS After-Tax net present value (“NPV”) (5%) of US$355 million with an After-Tax IRR of 28% (Base Case); At a silver price of $41/oz and gold price of $3,580/oz, NPV (5%) of US$862 million with an After-Tax IRR of 52%; 15-year mine life producing a total of

  11. Slide 11: District – Metal Sensitivity

    LOS RICOS DISTRICT – METAL SENSITIVITY Los Ricos South Base Upside Silver 26.80 40 60 80 100 Los Ricos South – Sensitivity based on Feb 2025 Feasibility Study Gold 2,330 3,500 4,300 4,700 5,000 After tax NPV (5%) 355 828 1,354 1,803 2,232 After tax IRR (%) 28 50.1 70.5 85.9 99.4 After tax Payback (Y

  12. Slide 12: South DFS Details

    LOS RICOS SOUTH DFS DETAILS • P&E Mining – Lead consultant, Resource, Reserve & Mining • Ausenco Engineering – Plant & Infrastructure • SGS Lakefield – Metallurgical • WSP – Geotechnical • CIMA – Environmental • Paterson & Cooke – Paste backfill testing • BCG – Tailings geotechnical testing • BQE –

  13. Slide 13: South Feasibility – Mill Design

    LOS RICOS SOUTH FEASIBILITY – MILL DESIGN • Conventional whole ore leaching process • Simplistic flow sheet • Will produce silver-gold dore bars and copper precipitate • Water recovery and dry-stacked detoxified tailings • Dedicated power line from the nearby La Yesca hydroelectric dam TSXGGD OTCGLG

  14. Slide 14: LRS Progress

    LRS PROGRESS Current Status Detailed Engineering TSXGGD OTCGLGDF gogoldresources.com

  15. Slide 15: LRS Key Schedule Milestones

    LRS KEY SCHEDULE MILESTONES 1. Earthworks commence – August 2026 2. Underground mine plan optimization – August 2026 3. Powerline installation – Nov 2026 4. Concrete foundation pouring – Jan 2027 5. Portal development / ramp blasting – Jan 2027 6. Paste plant construction – Jan 2027 7. Hill-slope st

  16. Slide 16: LRS Quarterly Capital Spend vs Cash Balance

    LRS QUARTERLY CAPITAL SPEND VS CASH BALANCE Based on current internal estimates using $60/oz Silver and $4,200/oz Gold TSXGGD OTCGLGDF gogoldresources.com

  17. Slide 17: South Feasibility – Mining

    LOS RICOS SOUTH FEASIBILITY – MINING • Bulk underground sub-level longhole mining • Ramp access and haulage • Cemented tailings backfilling of stopes (reduction of surface tailings and environmental impact) • Hydrology assessment indicates minimal de-watering required (dry mine) • Contract mining es

  18. Slide 18: South Feasibility – Annual Production

    LOS RICOS SOUTH FEASIBILITY – ANNUAL PRODUCTION TSXGGD OTCGLGDF gogoldresources.com

  19. Slide 19: Los Ricos North Mineral Resource

    LOS RICOS NORTH MINERAL RESOURCE Average Grade Contained Metal Deposit Tonnes Au Ag Cu Pb Zn AuEq AgEq Au Ag Cu Pb Zn AuEq AgEq • El Orito is a silver-base metal sulfide zone, all other deposits are silver- gold oxide zones. (Mt) (g/t) (g/t) (%) (%) (%) (g/t) (g/t) (koz) (koz) (Mlb) (Mlb) (Mlb) (koz

  20. Slide 20: North Resource Sensitivity

    LOS RICOS NORTH RESOURCE SENSITIVITY TSXGGD OTCGLGDF gogoldresources.com

  21. Slide 21: North PEA - Highlights

    LOS RICOS NORTH PEA - HIGHLIGHTS After-Tax NPV(5%) of $413 Million with an After-Tax IRR of 29% (Base Case) 13-year mine life producing a total of 110M AgEq Oz, consisting of 68M Ag Oz, 222K Au Oz, 23M lb Cu, 144M lb Pb, 242M lb Zn Initial capital costs $221M over 18 months, including $29M contingen

  22. Slide 22: North PEA – Annual Production

    LOS RICOS NORTH PEA – ANNUAL PRODUCTION TSXGGD OTCGLGDF gogoldresources.com

  23. Slide 23: LRN Resource Grade Distribution

    LRN RESOURCE GRADE DISTRIBUTION TSXGGD OTCGLGDF gogoldresources.com

  24. Slide 24: LRN Cross Section

    LRN CROSS SECTION TSXGGD OTCGLGDF gogoldresources.com

  25. Slide 25: Future Growth

    FUTURE GROWTH TSXGGD OTCGLGDF gogoldresources.com

  26. Slide 26: Future Growth

    FUTURE GROWTH Oz AgEq Production Profile (AgEq) $ USD 18,000,000 1,400,000,000 16,000,000 1,200,000,000 14,000,000 1,000,000,000 12,000,000 800,000,000 10,000,000 8,000,000 600,000,000 6,000,000 400,000,000 4,000,000 200,000,000 2,000,000 - - 2027 2028 2029 2030 2031 Parral Los Ricos South Los Ricos

  27. Slide 27: Parral – SART Zinc Update

    PARRAL – SART ZINC UPDATE Commissioning Completed January 2024 Zinc Circuit Benefits: • Cyanide regeneration, providing significant cost savings • Increased copper precipitate quality • Saleable zinc precipitate to be produced • Cleaner solution flow to increase silver / gold recoveries TSXGGD OTCGL

GoGold Resources — Investor Presentation (September 2026) on 6ix