Altitude Minerals Ltd · ASX:ATT
Altitude Minerals — Non-Deal Roadshow (August 2026)
11 slides from Altitude Minerals's roadshow presentation, Aug 25, 2026
Slide 1: Two Nevada Silver-Gold Projects
Two Nevada Silver-Gold Projects Firenze Project Drilling Sept-October • Firenze - never previously drilled • W-Project - demonstrated mineralisation, untested structures ASX: ATT | 1
Slide 2: Firenze – Nevada – Silver & Gold Opportunity
FIRENZE – NEVADA - SILVER & GOLD OPPORTUNITY Never been drilled silver & gold epithermal system – 100% owned D R IL L RE ADY SILVER & GOLD TARGETS • Firenze is a completely undrilled silver & gold system released by the BLM from wilderness zoning in 2022 – creating a genuine first-pass drill opportu
Slide 3: Firenze Drill Target Selection Criteria
FIRENZE DRILL TARGET SELECTION CRITERIA Altitude Minerals applies strict investment gates before committing drilling capital Firenze Project ü in-demand strategic and precious metals - (Au-Ag) ü profitable mines in same geological region – (Multiple) ü favorable jurisdictions - (Nevada, #1 Ranked in
Slide 4: Why Nevada?
WHY NEVADA? • Established profitable mines, producing 70% of the USA’s annual gold production • On its own, Nevada is the fifth largest gold producer globally – behind China, Russia, Australia and Canada. • Nevada is ranked #1 in the World by the Fraser Institute for mining (2026) • Good access and
Slide 5: Drill Targeting - Firenze
DRI LL R DRILL TARGETING - FIRENZE EAD Y Planned drill collars and drill traces (yellow) Drill Targeting • 9 holes ~2600m of reverse circulation drilling • Testing multiple structures validated by CSAMT & magnetic geophysics and mapping of structures and alteration • Targeting potential bonanza-grad
Slide 6: About Epithermal Mineral Systems
ABOUT EPITHERMAL MINERAL SYSTEMS Textures Firenze Project Field Observations of textures Interpreted Firenze supporting the interpreted Erosional Level erosional level. Moss, massive chalcedony, Targeted adularia, bladed calcite potential (replaced with quartz), Bonanza Au, Ag grades cockade, comb,
Slide 7: Drill Section E-E’ (PLGGFZ07)
Plan View Drill Section E-E’ (PLGGFZ07) PLGGFZ07 E E 43.9 ppm Au, 534 ppm Ag E’ 18.45 ppm Au, 974 ppm Ag E’ PLGGFZ07 AZI (T): 290° DIP: 45° Planned drill Hole Depth: 300m (100m & 200m below surface) hole PLGGFZ07 Target: NE-SW striking orthogonal vein to main NW-SE vein. Targeting under high grade s
Slide 8: W-Project: Demonstrated Mineralisation, Untested Structural Targets
W-PROJECT: DEMONSTRATED MINERALISATION, UNTESTED STRUCTURAL TARGETS • 40 of 43 holes intersected gold mineralisation • Seven holes ended in mineralisation • Significant Historical Intersections include: • 37m @ 1.30 g/t Au, 9.8g/t Ag from 31m (W87-1) • 3m @ 3.75 g/t Au, 4.2 g/t Ag from 73m (W87-6) •
Slide 9: Altitude’s Pipeline of Nevada Drill Targets
ALTITUDE’S PIPELINE OF NEVADA DRILL TARGETS Drill Ready Final Validation Nevada – Arizona, USA Epithermal Silver & Gold Opportunities Firenze Project, Nevada W-Project, Nevada +/- Strategic Minerals • Drill permits • Outcrop sampling, secured geophysics & ATT continually screens opportunities agains
Slide 10: RIU Roadshow August 2026
RIU ROADSHOW AUGUST 2026 MELBOURNE 25 AUG SYDNEY 27 AUG Market Cap $3.1 M Share Price Duncan Chessell 0.7 cents Managing Director Ph: +61 414804055 E: dc@altitudeminerals.com Current Cash Position 30 June 2026 $1.1 m Adelaide Office 21 Sydenham Road Capital Structure Norwood, SA 5067 446 m Shares ww
Slide 11: Disclaimer, JORC Information Location Map
DISCLAIMER, JORC INFORMATION LOCATION MAP This presentation has been prepared by Altitude Minerals Ltd (Altitude). This document contains current background information as of the presentation date. The presentation is in summary form and does not purport to be all-inclusive or complete. Recipients s