Energy Metals Ltd · ASX:EME

Energy Metals — Shareholder Meeting (May 2018)

28 slides from Energy Metals's shareholder meeting presentation, May 16, 2018

  1. Slide 1: Annual General Meeting 2018

    For personal use only Annual General Meeting 2018 Dr Weidong Xiang Managing Director

  2. Slide 2: Disclaimer

    Disclaimer For personal use only This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information in this presentation has been derived from third parti

  3. Slide 3: Australia's Uranium

    Australia’s Uranium Jabiluka i H 4 Darwine ee mo, Bigrlyi & Ngalia Fadi: ms Macallan : Mopoke Wells 0Bagooma , We Westmoreland Lake Mason TERRITORY Valhalla Anketell : Kintyre Manyingee r) ‘7 one i. i — QUEENSLAND Lakeside ElRIN AUSTRALIA o|Wiluna Lake Maitland SOUTH AUSTRALIA f ° Four Mills » Yeeli

  4. Slide 4: Energy Metals Share Price vs. U3O8 Spot Price from 2010

    Energy Metals Share Price VS. U3O8 Spot Price from 2010 Spot Price EME Share For personal use only US$/lb U3O8 Price Au$ Current EME Share Price 0.10 Current Spot Price $21.00 Long Term Uranium Price $29.00

  5. Slide 5: Uranium supply cut by major producers

    Uranium supply cut by major producers For personal use only  On 8th Nov 2017, Cameco, one of the largest uranium producers in the world, announced that due to continued uranium price weakness, production from the McArthur River mining and Key Lake milling operations in northern Saskatchewan will be

  6. Slide 6: Capital Structure

    Energy Metals Limited For personal use only Capital Structure Shares on Issue 209.7M Shareholders 656 Cash & Bank (31 Dec 2017) $19.8M Major Shareholders China Uranium Development Company Ltd 139.3m 66.45% KangDe Investment Group 26.5m 12.66% Jindalee Resources Limited 14.0m 6.69%

  7. Slide 7: EME Directors & Management

    For personal use only EME Directors & Management Mr Yusheng Cai Non-Executive Chairman Dr Weidong Xiang Managing Director Mr Lindsay Dudfield Non-Executive Director Ms Jan Macpherson Non-Executive Director Mr Yu Zhong Non-Executive Director Ms Junmei Xu Non-Executive Director Mr Zimin Zhang Non-Exec

  8. Slide 8: Clean Energy Targets in China

    Clean Energy Targets in China For personal use only By 2020 CO2 emissions per unit of GDP will be reduced by 40 ~45% from the Non-fossil energy will 2005 level account for 15% of total primary energy consumption In 2015 the ratio was 11.9% • By 2030 CO2 emissions will peak and the share of non-fossi

  9. Slide 9: About CGN (China General Nuclear Power Corporation)

    About CGN (China General Nuclear Power Corporation) CGN: a leading clean energy supplier and service provider For personal use only As of the end of 2017 x20 21.47GW 60% domestically Units in operation: remains first domestically, enters top 5 globally 25% Hongkong Electricity Supply from x8 10.27GW

  10. Slide 10: About CGN

    About CGN Environmental benefits: make our sky clearer and water cleaner For personal use only Reduced consumption of In 2016, the net power standard coal by about 57.28 million tons generation of CGN was 178.8 TWh CO2 = Reduction of CO2 emission by about 139.85 million tons SO2 Equivalent to a fore

  11. Slide 11: Northern Territory Projects

    Northern Territory Projects. Darwin NORTHERN Y fi pad | TERRITORY l a, Macallan ®. ae oe Bigrlyi & Ngalia meu 5S T R A Uae Metals.n2

  12. Slide 12: Northern Territory Projects

    For personal use only NORTHERN TERRITORY PROJECTS

  13. Slide 13: Bigrlyi Joint Venture Project

    Bigrlyi Joint Venture Project For personal use only  Several drilling programs, concentrating mostly on the Anomaly 4 and Anomaly 15 deposits, were completed at Bigrlyi in the period from 2006 to 2011 with most holes intersecting significant uranium mineralisation. Uranium and vanadium resource est

  14. Slide 14: Bigrlyi Joint Venture Project

    Bigrlyi Joint Venture Project For personal use only  Due to current uranium market conditions, the Bigrlyi project is operating on a minimum budget.  Bigrlyi camp infrastructure remains on ‘care and maintenance’ with regular site visits.  The camp bulk fuel storage system was upgraded during the

  15. Slide 15: Ngalia Regional Project

    Ngalia Regional Project The 2017 exploration program focused on geophysical targeting of undercover For personal use only uranium mineralisation utilising aerial electromagnetic (AEM) and induced polarisation (IP) survey methods. In mid-2017 an AEM survey was flown over parts of EL24453 and EL31098

  16. Slide 16: IP Surveys 2017

    IP Surveys 2017 Gradient-array (GA-IP) and pole-dipole (PD-IP) induced polarisation surveys For personal use only over three key western Ngalia Basin prospect areas were completed in 2017. The method targets buried, reduced, pyrite-bearing beds (chargeable beds) that are prospective for Bigrlyi-styl

  17. Slide 17: Dingos Rest GA-IP Survey

    Dingos Rest GA-IP Survey For personal use only A strong chargeable anomaly was detected in a tightly folded nose of an interpreted syncline located to the south of known surface mineralisation

  18. Slide 18: Yuendumu Thrust West PD-IP Survey

    For personal use only Yuendumu Thrust West PD-IP Survey The main thrust fault was located together with a chargeable anomaly suggestive of Camel Flat style mineralisation

  19. Slide 19: Walbiri South GA-IP Survey

    Walbiri South GA-IP Survey The target unit was found not to extend onto the southern limb of the For personal use only Mt Eclipse Anticline as predicted but prospective beds were found to be concentrated just north of the axial plane of the fold

  20. Slide 20: Malawiri Project

    Malawiri Project The Malawiri deposit, discovered in 1980, is located in the eastern Ngalia Basin. The For personal use only deposit is similar in style to Bigrlyi but located undercover. Significant historical intercepts include: 12.1m at 3,409 ppm eU3O8 from 164.6m in GCRD9, and 11.9m at 946 ppm e

  21. Slide 21: Malawiri Drillhole MARD004

    Malawiri Drillhole MARD004 For personal use only In 2016 EME confirmed previous results with the drilling of hole MARD004 A new high-grade lens was discovered at depth: 8.1m at 1,789 ppm eU3O8 from 222.0m …including 2.0m at 0.62% eU3O8 from 225.5m

  22. Slide 22: Malawiri Uranium Mineralisation Modelling

    Malawiri Uranium Mineralisation Modelling Mineralised domains and unconformity surfaces were modelled from 25 modern and historical exploration drill-holes For personal use only

  23. Slide 23: Malawiri Project Resource Estimate

    Malawiri Project Resource Estimate For personal use only A review of drilling results demonstrated sufficient continuity of mineralisation to enable the estimation of an initial mineral resource. On 14th December 2017 EME announced an initial JORC Mineral Resource Estimate of 542 tonnes U3O8 for a 1

  24. Slide 24: Retention of WA Uranium Projects

    Retention of WA Uranium Projects For personal use only  EME has four calcrete-style uranium projects in WA: Lakeside, Lake Mason, Anketell & Mopoke Well and one palaeochannel-hosted roll-front deposit located at Manyingee.  JORC-reported Mineral Resource Estimates have now been announced for all E

  25. Slide 25: Tenement Optimisation – Northern Territory

    Tenement Optimisation – Northern Territory For personal use only Following an annual project review, EME’s Ngalia Regional tenements were re-organised: including surrender of low prospectivity blocks, application for retention licences over resource areas, and amalgamation of adjacent titles. The pl

  26. Slide 26: Sacred Site Clearance – Northern Territory

    Sacred Site Clearance – Northern Territory For personal use only In late 2017 EME received four Authority Certificates from the Aboriginal Areas Protection Authority (AAPA), the NT Government agency responsible for sacred site and heritage clearances. The certificates followed site clearance surveys

  27. Slide 27: Plans for 2018

    Plans for 2018 For personal use only Northern Territory Projects:  Exploration Database Audit and Upgrade;  AEM Survey Interpretation & Targeting – Eastern Ngalia;  Ngalia Basin Uranium-Vanadium Deposits Research Program in co-operation with CSIRO;  Ngalia Regional Future Drill Program Planning;

  28. Slide 28: For more information

    For personal use only ASX:EME For more information: Phone: +61 8 9322 6904 Email: enquiry@energymetals.net Web: www.energymetals.net

Energy Metals — Shareholder Meeting (May 2018) on 6ix