  1. Slide 1: Update on Kingston Ash Spill

    Update on Kingston Ash Spill Anda Ray Senior Vice President Office of Environment & Research JULY 2009 1

  2. Slide 2: History of Kingston Fossil Plant

    History of Kingston Fossil Plant • TVA part of Kingston community since early 1950s – Construction of plant began in 1951 – First unit began operation in 1955 • At time of completion, world’s largest coal-burning plant • About 300 people work there • Has nine generating units with a capacity of 1600

  3. Slide 3: History of Failed Dredge Cell

    History of Failed Dredge Cell 3

  4. Slide 4: Failure of Dredge Cell

    Failure of Dredge Cell Dike Failed on December 22, 2008, between midnight & 1 a.m. 4

  5. Slide 5: AECOM June 2009 Root Cause Report

    AECOM June 2009 Root Cause Report 5

  6. Slide 6: What Happened – Initial Failure

    What Happened – Initial Failure Initial effects – 5.4 million cubic yards of coal ash released – Debris covers about 300 acres (about half a square mile) – No injuries – 3 homes uninhabitable, 23 others damaged – Roads, rail line and utilities damaged 6

  7. Slide 7: Aerial View of Site – Post Event

    Aerial View of Site – Post Event Dike Failed 7

  8. Slide 8: Initial Emergency Response

    Initial Emergency Response • Worked closely with: – Roane County Emergency Management Agency – Tennessee Department of Environment & Conservation (TDEC) – Tennessee Emergency Management Agency (TEMA) – U.S. Environmental Protection Agency (EPA) – U.S. Army Corps of Engineers – U.S. Department of Hom

  9. Slide 9: Initial Outreach Response

    Initial Outreach Response • Ensure neighbors are safe • Arrange temporary housing + incidentals • Respond to property damage • Dispatch face-to-face outreach teams • Conduct community meetings • Establish comprehensive Web site to share information • Established an Outreach Center and public phone l

  10. Slide 10: Kingston Recovery Objectives

    Kingston Recovery Objectives Kingston Recovery Project Objectives • Ensure the Safety of Citizens and Response Personnel • Keep the Public and Stakeholders Informed of Response Activities • Maximize the Protection of Environmentally Sensitive Areas • Return Community to Normal Conditions 10

  11. Slide 11: Early Environmental Monitoring

    Early Environmental Monitoring • Began ongoing sampling of air, water & soil • Stabilized site to prevent further movement of ash – Deployed booms to confine floating debris and cenospheres – Began building dikes to confine ash in the water – Began dust control measures with spray-on dust inhibitors

  12. Slide 12: Scope of Cleanup: Failed Ash Cell

    Scope of Cleanup Failed Ash Cell 12

  13. Slide 13: Scope of Cleanup: Failed Cell and Former Dike Area

    Scope of Cleanup Failed Cell and Former Dike Area 13

  14. Slide 14: Scope of Cleanup: Aerial of Spill Before

    Scope of Cleanup Aerial of Spill -BEFORE 14

  15. Slide 15: CERCLA

    CERCLA • TVA and EPA have decided to conduct remediation of the KIF Ash Release under the regulatory structure of CERCLA, the Comprehensive Environmental Response, Compensation & Liability Act • CERCLA provides TVA, regulators, and the public with a clear path forward to clean up the site. Advantage

  16. Slide 16: Scope of Cleanup: Amphibious trackhoes

    Scope of Cleanup Amphibious trackhoes 16

  17. Slide 17: Cenospheres Cleanup

    Cenospheres Cleanup Collecting cenospheres … … and storing them 17

  18. Slide 18: Ash Processing

    Ash Processing River Dredge Settling Pond Rail Loading Dipping Ash Sluice Channel Temp Processing Area Discharge into Rim Ditch 18

  19. Slide 19: River Dredging

    River Dredging 19

  20. Slide 20: Pumping Into Rim Ditch

    Pumping Into Rim Ditch Dredge Material Pumped Into Rim Ditch 20

  21. Slide 21: Dipping Ash From Rim Ditch

    Dipping Ash From Rim Ditch Dredge Material Dipped by Back Hoes from Rim Ditch to Processing Area 21

  22. Slide 22: Loading Rail Cars

    Loading Rail Cars Dried Ash Loaded Into Rail Cars 22

  23. Slide 23: Ash Disposal: Rail Car Burrito Liner

    Ash Disposal Rail Car Burrito Liner 23

  24. Slide 24: Ash Disposal

    Ash Disposal Disposal of Released Ash: • Current Transportation: Rail • Other: Barge, Truck • Alabama site Long Term Options: • Dry Fly Ash Collection • By Product Marketing • Reclamation Sites • Existing Class I or II Landfills • Greenfield Disposal Sites • Brownfield Sites - Structural Fill Class

  25. Slide 25: Soil & Ash Sampling

    Soil & Ash Sampling • Except for arsenic, concentrations of metals in escaped ash are well below EPA Region 4 Removal Action Levels – In most cases, not much different from non-agricultural soils • Ash and soil tested for radioactivity – Kingston ash less radioactive than low- sodium table salt 25

  26. Slide 26: Water & Air Sampling Results

    Water & Air Sampling Results • Well over 2,000 tests by TVA, TDEC & EPA continue to confirm – Municipal drinking water & water sampled from private wells continue to meet standards for drinking water • More than 64,000 of air- quality results show the air is better than National Ambient Air Quality

  27. Slide 27: Biological Monitoring

    Biological Monitoring • Fish (whole body and tissue) • Benthic invertebrates (bottom of food chain) • Birds and eggs (food chain effects) • Insects (food source) • Aquatic Life Toxicity 27

  28. Slide 28: Operational Results

    Operational Results • 357,499 yds3 of ash removed from the river to date • 360+ acres of Flexterra applied • 6,145,500 gallons of Cenosphere slurry collected • 67,963 bags of shoreline debris collected • 959 tons of light debris collected w/ barge-mounted excavators • 64,000+ air samples • 1,800+ ri

  29. Slide 29: Continued Outreach

    Continued Outreach • Public Meetings • Outreach Center • Long-term Recovery Committee • Property Purchases • Business Claims • Community Involvement Plan • ORAU Health Contract • Research RFPs Peer Reviewed • Community Action Group 29

  30. Slide 30: Progress…

    Progress… Failed Dredge Cell from Swan Pond Road 30

  31. Slide 31: Before…

    Before… Tracks adjacent to Swan Pond Road - BEFORE 31

  32. Slide 32: Before…

    Before… Tracks and Swan Pond Road - BEFORE 32

  33. Slide 33: Progress…

    Progress… Tracks and Swan Pond Road - AFTER 33

  34. Slide 34: Before…

    Before… Connector Swan Pond Road and Circle - BEFORE 34

  35. Slide 35: Progress…

    Progress… Connector Swan Pond Road and Circle - AFTER 35

  36. Slide 36: Before…

    Before… Church Slough -BEFORE 36

  37. Slide 37: Progress…HOPE!

    Progress…HOPE! Church Slough -TODAY 37

  38. Slide 38: 38

    38

  39. Slide 39: 39

    39

  40. Slide 40: 40

    40

  41. Slide 41: 41

    41

  42. Slide 42: 42

    42

  43. Slide 43: 43

    43

  44. Slide 44: Questions?

    Questions? 44

Tennessee Valley Authority — Corporate Update (July 2009) on 6ix