Axis NIFTY Bank ETF · NSE:BNKETFAXIS
Axis NIFTY Bank ETF — IEA Networked Standby Conference (March 2013)
15 slides from Axis NIFTY Bank ETF's conference presentation, Mar 7, 2013
Slide 1: IEA Networked Standby Conference: Industry perspectives on global policy framework
IEA Networked Standby Conference Industry perspectives on global policy framework Industry Presenters Peter Gibson- Intel Nathan Moin-HP Date: 7 March 2013
Slide 2: Agenda Outline
Agenda Outline • Industry principles on global energy efficiency convergence • Scope: Policy focus and approach • Definitions: Ensuring use of consistent terminology • Measurement and data collection • Standardization • Current Policy Issues and Options • Summary 2
Slide 3: Key principles on global energy efficiency convergence
Key principles on global energy efficiency convergence • Ensure energy efficiency • Use proven successful voluntary programs for ICT products help and mandatory energy efficiency programs for ICT products as a promote, and not impede, energy basis for regulatory convergence efficient economic growth
Slide 4: The Big Picture
The Big Picture Edge device (Example) PC’s Imaging interface Equip LAN Networking device WAN Routers Switches WAP Set-top Could scale with boxes traffic, shouldn’t Blue-ray Could scale with sleep Servers player traffic, Shouldn’t Storage sleep Could scale Load with traffic, balancers shouldn’t sleep
Slide 5: Scope for network standby policy
Scope for network standby policy • Consider the network elements (networking devices, networked infrastructure devices, edge devices) in their entirety before considering efficiency requirements for each device class separately • Horizontal approach not workable, the power and energy profiles and en
Slide 6: Definitions for network standby technologies
Definitions for network standby technologies • Standardized definitions and terminology an advantage • Clear and unambiguous terminology that comprehend network technology trends – Recent development of IEC 62542 demonstrated that a generic terminology can create difficulties due to differing techno
Slide 7: Measurement & Data Collection
Measurement & Data Collection • Market Studies need to be; – Clear with identification of scope (inc product and activities) – Identify transformation target – Less reliant on previous study data which may not be applicable or relevant • In-Country/Regional studies based on local infrastructure and
Slide 8: Standardization
Standardization • International Standards – avoiding duplicative and conflicting requirements – Wider stakeholder engagement and acceptance • Standardized test methodology (e.g. IEC 62623) – Product focused – Measurement framework – Uniform data – Conformity assessment – Exemptions • Transportabilit
Slide 9: Policy Issues and Options
Policy Issues and Options • Key learning from Lot 26 experience made available for other policy makers • Regulations must be balanced reflecting market incentives to avoid stifling innovation • Data driven, prioritized vertical segment approach with greatest energy savings gains taking into consider
Slide 10: Summary – Key Issues From an Industry Perspective
Summary – Key Issues From an Industry Perspective • Energy, not power • Holistic approach • Vertical product focus • Voluntary • Global objective • Lot 26 (Horizontal approach) should not be a precedent 10
Slide 11: Back-up
Back-up 11
Slide 12: Key ICT Product Energy Regulations Summary
Key ICT Product Energy Regulations Summary1 March 2013 2010 2011 2012 2013 2014 2015 Update Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ENERGY Servers v1 TVs v5.1 Servers v2 STAR* Client v5 Client v6(Est.)2 (US, Europe, Aus/NZ) EU VA Complex STBs ErP/EuP Lot 6, v1 (S5) Lo
Slide 13: Scope for network standby policy
Scope for network standby policy • Edge device primarily interacts with end user – Some devices are not expected to be activated by the network – no need for NW Standby, use normal standby mode – Some devices activated by the network – opportunity for reduced power while maintaining network connecti
Slide 14: Majority Profile Enterprise PC
Majority Profile Enterprise PC Duty cycle attributes for the Enterprise majority profile duty cycle study: Majority profile is based on enterprise Desktop Computer Notebook Computer users (people using computers in small to large businesses primarily focused Toff 45% 25% on office productivity appli
Slide 15: Energy vs. Power example Printer
Energy vs. Power example Printer Consider an Inkjet MFP that meets the EU regulation, but only supports 1 user. The network standby (Sleep mode) is 1.5 W with a typical electricity consumption of 0.5 kwh/week. If there is a group of 20 workers, each worker needs 1 Inkjet MFP - So the total network d
Axis NIFTY Bank ETF — IEA Networked Standby Conference (March 2013) on 6ix