Avenira Limited · ASX:AEV
Avenira — Shareholder Meeting (November 2018)
14 slides from Avenira's shareholder meeting presentation, Nov 14, 2018
Slide 1: Annual General Meeting
November 2018 Annual General Meeting ASX: AEV ABN 48 116 296 541
Slide 2: Disclaimer
Disclaimer This presentation has been prepared by Avenira Limited (Avenira). This document does not constitute or contain an offer, invitation, solicitation or recommendation with respect to the purchase or sale of any security in Avenira. This document does not constitute an offer to sell, or a sol
Slide 3: Rationale to Invest
Rationale to Invest Independent phosphate company with enviable industry support Perfectly placed for rapidly growing fertiliser markets, as driven by world population growth and food demand 80% interest in the Baobab Phosphate Project in the Republic of Senegal 75 km2 Exploitation Permit va
Slide 4: Phosphate Rock: Critical for Food Security
Phosphate Rock: Critical for Food Security PHOSPHATE MARKET OVERVIEW Phosphate rock - ingredient for essentially all phosphate products 90% global demand is in fertilisers Food demand predicted to double by 2050 High incidence of vertical integration: only ≈ 12-15% of annual global phosphate
Slide 5: The Gadde Bissik Mine
The Gadde Bissik Mine an established phosphate rock mine in Senegal, West Africa currently processing stockpiles 5
Slide 6: Baobab Project
Baobab Project OVERVIEW Phosphate rock mine located in Senegal, West Africa Sedimentary Deposit, mineralisation beneath 30-35 m of cover 80% owned by Avenira, 20% owned by Mimran Group (Senegal’s largest private employer and experienced agriculture industry participant) 75 km2 Exploitation P
Slide 7: Hitting the Milestones
Hitting the Milestones ALREADY OPERATING LARGE MINERAL RESOURCES INFRASTRUCTURE AVAILABLE In country operating skills Indicated Resources of Readily accessible Supply chain experience 42.0Mt @ 19.4% P2O5 sealed roads Experience with phosphate Inferred Resources of Access to export infrastructure roc
Slide 8: Baobab's Gadde Bissik Mine
Baobab’s Gadde Bissik Mine CURRENT OPERATIONS VALUABLE EXPERIENCE ALREADY GAINED Developed in 2015/2016 Mining suspended in 2017 Sub-optimal recovery using existing circuit Phosphate prices at cyclical low in 2017 Currently operating on a small scale Processing existing ROM piles Curre
Slide 9: Baobab Project
Baobab Project EXPANSION PROJECT HIGHLIGHTS BAOBAB TO BE EXPANDED TO PRODUCE HIGH QUALITY PHOSPHATE PRODUCT Concept Study completed in 2017 provided direction for the current Feasibility Study managed by Wood PLC Replace existing circuit with industry standard flotation, magnetic separation and
Slide 10: Baobab Project
Baobab Project EXPANSION PROJECT HIGHLIGHTS EXPLOITATION PERMIT GRANTED Baobab Exploitation Permit granted by the Government of Senegal Permit valid for a 20-year renewable term and covers a 75 km2 area The Senegalese Government will hold a 10% free- carried interest in the legal entity owning
Slide 11: Wonarah Project
Wonarah Project SLEEPER PROJECT? 100% owned by Avenira, and one of the largest phosphate deposits in Australia Measured Resource of 65 Mt @ 22.4% P2O5, Indicated Resource of 133 Mt @ 21.1% P2O5, Inferred Resource of 352 Mt @ 21 % P2O5 (15% cut-off) Access to infrastructure Direct access to a
Slide 12: JDC Phosphate
JDC Phosphate AVENIRA HAS A 7% INTEREST IN JDC JDC Phosphate - USA based private company seeking to commercialise the “Improved Hard Process” technology for superphosphoric acid production Potential to provide a number of advantages across the value chain relative to existing technology Demons
Slide 13: Key Milestones
Key Milestones COMPLETED UPCOMING Construct and successfully operate a mine Testwork to validate expansion in progress flowsheet Develop in-country capability Feasibility Study on Expansion Project in progress Declaration of Ore Reserves in progress Supply chain experience “Bankable” Feasibili