Slide 1: La Libertad Mine
LA LIBERTAD MINE Entrance Sign Roundabout Process Plant : Milling and Tanks Area Main Square LA LIBERTAD – WHERE SECURITY IS OUR COMMITMENT 1
Slide 2: La Libertad Mine
LA LIBERTAD MINE Limon Mine La Managua Libertad Mine 2
Slide 3: La Libertad Mine (formerly Orosi Mine)
La Libertad Mine (formerly Orosi Mine) Production commenced in January 2010 Economic completion February 1st 2010 Open pit mine Converted from heap leach operations to conventional milling planned throughput 3,500 tonnes per day April average tonnage approximately 3,900 tonnes of ore per d
Slide 4: La Libertad Concession
La Libertad Concession Comarca Betania Comarca Espejo Comarca Chamarro 3.0 Km2 Comarca San Fco de Comarca El Zapote de Comarca El Salto Gamalote Oriente Comarca El Zapote Comarca San Buenaventura Comarca Potrero 4
Slide 5: La Libertad Mine Infrastructure
LA LIBERTAD MINE INFRASTRUCTURE Inaugural Ceremony Site Crimea Santa Maria Mojón 5
Slide 6: Site View from Lookout
SITE VIEW FROM LOOKOUT Mine Infrastructure and Tailings Impoundment Tailings Impoundment 6 6
Slide 7: Mojon Pit
MOJON PIT 7 7
Slide 8: Ore Extraction
ORE EXTRACTION es < Resa Rs Poe Sep B2GOLD ;
Slide 9: Crimea Pit
CRIMEA PIT > Sp B2GOLD 9
Slide 10: Process Plant
PROCESS PLANT Crusher, Milling Area and Tanks 10 10
Slide 11: Process Plant
PROCESS PLANT Crusher, Mill Area, Leach Tanks and ADR 11 11
Slide 12: ADR Plant
ADR PLANT 12 12
Slide 13: Refinery
REFINERY > B2GOLD
Slide 14: Gold Bar - Dore
Gold Bar - Dore PESO DE LA BARRA: 20.40 Kg. ONZAS DE ORO: 247.586 ONZAS DE PLATA: 401.436 ONZAS IMPUREZAS: 6.852 Estimated Value: US$ 304,000 14
Slide 15: Tailings Impoundment
TAILINGS IMPOUNDMENT > B2GOLD 15
Slide 16: Power Supply – Transmission Line
POWER SUPPLY – TRANSMISSION LINE SUBESTACION ELETRICA EL MOJON La Libertad SUBESTACION Tensión de Línea: 138 KV ELETRICA SANTA MARIA JUIGALPA 16
Slide 17: Chemical Laboratory
CHEMICAL LABORATORY > B2GOLD 7
Slide 18: Environment
ENVIRONMENT Reclamation in Mojon Pit , youth participation in the preparation of seedbeds SEGURIDAD NUESTRO COMPROMISO 18
Slide 19: Artisanal Miners - A Mining Tradition
ARTISANAL MINERS - A MINING TRADITION 19
Slide 20: Social Responsibility
SOCIAL RESPONSIBILITY Support social projects in La Libertad Village Remodeling La Libertad´s Catholic Church Illumination of the entrance to La Libertad Improvements to dining hall for children and Village senior citizens 20
Slide 21: Social Responsibility
SOCIAL RESPONSIBILITY Water tank inauguration in La Libertad Village Water reservoir construction Construction of footbridge over Mico River 21
Slide 22: Social Responsibility
SOCIAL RESPONSIBILITY Donation to the Telethon – program Donation toSan Marcos town Donation to Santo Domingo miners for children with special needs Donation to National Police Donation to National Police Donation for reforestation in Santo Domingo 22
Slide 23: La Libertad Mine Contribution to the Nicaraguan Economy
La Libertad Mine Contribution to the Nicaraguan Economy Community Support budget B2Gold Corp. (Desminic) spent US$ 1.3 million in 2009. Most of this money was directed to artisanal miners For 2010 B2Gold Corp. expects to spend US$ 1.3 million. Support for the National Economy In 2009 B2Gol
Slide 24: B2Gold Contribution to the Nicaraguan Economy
B2Gold Contribution to the Nicaraguan Economy Community Support Budget In 2009 B2Gold Corp. (La Libertad and El Limón Mines) spent a total of US$ 2.0 million For 2010 B2Gold’s total budget for community support is US$ 2.9 million Global Support to the National Economy In 2009 B2Gold contribu