Williams Companies, Inc. (the) · NYSE:WMB

Williams Companies, Inc. (the) — Transco (Transcontinental Gas Pipe Line Company) — Corporate Update (2017)

39 slides from Williams Companies, Inc. (the)'s corporate update, 2017

  1. Slide 1: Fall Update 2017

    Fall Update 2017 Transco Transportation Services Fall Transco Station 515, Leidy Southeast Project in PA Photo by Williams employee, Peter Poarch, Engineer

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements > The reports, filings, and other public announcements of The Williams Companies, Inc. (Williams) and Williams Partners L.P. (W PZ) may contain or incorporate by reference statements that do not directly or exclusively relate to historical facts. Such statements are “forwa

  3. Slide 3: Forward Looking Statements (cont'd)

    Forward Looking Statements (cont’d) – The impact of existing and future laws, regulations, the regulatory environment, environmental liabilities, and litigation, as well as our ability to obtain permits and achieve favorable rate proceeding outcomes; – Williams’ costs and funding obligations for def

  4. Slide 4: Transportation Services/1Line Org Chart

    Transportation Services/1Line Org Chart Gary Duvall VP Comm Eastern Interstates Melissa Casey Director Transportation Services/1Line Linette Schneider Jamie Johnson Diane Ezernack Mike DiCarlo Manager – Transportation Manager – Transportation Sharon Larsen Services North Manager – 1Line Services Sou

  5. Slide 5: Regulatory Matters

    Regulatory Matters 5 Summer Update 2017 © 2017 The Williams Companies, Inc. All rights reserved.

  6. Slide 6: Rate Case Timeline

    Rate Case Timeline Transco Base and Test Periods Assumes August 31, 2018 Filing Date 2017 2018 2019 J J A S O N D J F M A M J J A S O N D J F M A M Base Period Test Period Jun. – May Jun. – Feb. Filing Date Aug. 31, 2018 Effective Date Mar. 1, 2019 Filing Date: August 31, 2018 Base Period: June 1, 2

  7. Slide 7: Priority of Service - Proposed Tariff Filing

    Priority of Service - Proposed Tariff Filing > Transco posted a draft Tariff filing, presentation video explaining the filing, and answers to frequently asked questions on the Informational Postings page – Filing, presentation & video posted on 2/16/17; FAQs posted 4/13/17 – Links: Draft Tariff fili

  8. Slide 8: Failure of Electronic Equipment - Proposed Tariff Filing

    Failure of Electronic Equipment - Proposed Tariff Filing > Transco filed tariff records with FERC on 3/24/17 to clarify Transco’s business practice when the 1Line system is unavailable and unable to process nominations. > Prior to a final FERC acceptance, Transco received feedback and interventions

  9. Slide 9: Failure of Electronic Equipment - Proposed Tariff Filing

    Failure of Electronic Equipment - Proposed Tariff Filing > What is an outage? – A 1Line outage is a period of time in which the system is unavailable to both internal Williams employees and to our shippers and operators. > Minimizing down time for unplanned outages of 1Line – After the extended 1Lin

  10. Slide 10: Failure of Electronic Equipment - Proposed Tariff Filing

    Failure of Electronic Equipment - Proposed Tariff Filing > Why can’t Transco handle written nominations during or after a 1Line outage? – The 1Line system processes ~12,000+ nominations and PDAs daily with a large number of those transactions being transmitted via EDI or X-12. > What if there are ot

  11. Slide 11: Failure of Electronic Equipment - Proposed Tariff Filing

    Failure of Electronic Equipment - Proposed Tariff Filing > What Transco can do after a 1Line outage is complete – Transco will post that 1Line has returned to service. – Transco will notify shippers and operators what data was recovered and what processes were completed. – Transco may accept POST* a

  12. Slide 12: Failure of Electronic Equipment - Proposed Tariff Language

    Failure of Electronic Equipment - Proposed Tariff Filing > Current Tariff - language resides in Section 28.1 (a) (vii) …..All nominations for storage or transportation service must be made electronically through 1Line or by electronic data interchange. However, in the event of a failure of electroni

  13. Slide 13: Gas/Electric Reliability

    Gas/Electric Reliability > Gas/Electric Coordination INGAA – Transco provided responses to INGAA on natural gas disruptions, outages and damage during the period of 2005-2015. They were particularly interested in days in which reservation charge credits were given. • For Transco, there were instance

  14. Slide 14: Operations

    Operations 14 Summer Update 2017 © 2017 The Williams Companies, Inc. All rights reserved.

  15. Slide 15: SUD and Constraint Changes

    SUD and Constraint Changes > New Constraint at Station 160 effective 6/1/17 – Constraint at Station 160 (MP 1369.44) monitors and limits as required, non-primary firm transportation capacity including NSRP, secondary FT and IT, scheduled from North to South through this location. > Extension of Main

  16. Slide 16: Mainline SUD

    Mainline SUD Extension of SUD 6/1/17 Future extension of SUD 16 Summer Update 2017 © 2017 The Williams Companies, Inc. All rights reserved.

  17. Slide 17: Future OIA Evaluations

    Future OIA Evaluations > OIA evaluation process – As defined by the North American Energy Standards Board (“NAESB”) and as adopted by the Commission, an OIA is the largest possible area on a pipeline system in which imbalances have a similar operational effect. – Following the in service of: • Virgi

  18. Slide 18: Future OIA Evaluations

    Future OIA Evaluations Existing OIAs OIA 1 – Transco’s system in its entirety south and west of station 90 OIA 2 – Station 90 and Transco’s system north and east of station 90 up to end of Zone 5 OIA 3 – Zone 6 with the exception of Station 505 and the Leidy line system west of Station 505 OIA 4 – S

  19. Slide 19: Fuel Assessment

    Fuel Assessment > Zones 5 and 6 – Transco began assessing fuel on reverse flow transactions in Zones 5 and 6 effective April 1, 2017, as Transco has experienced the need to run compression to effectuate flows from North to South. > Zones 1-4 – Transco will continue to evaluate gas compression in Zon

  20. Slide 20: Active Confirmations & Location Specific OFO's

    Active Confirmations & Location Specific OFO’s > Imbalances on the system cause operational issues. Transco currently utilizes Zone Specific OFOs to manage imbalances when those issues arise. > Transco plans to start using additional tools currently existing in the tariff to target locations that ar

  21. Slide 21: Maintenance Notifications

    Maintenance Notifications > Transco is improving communications during maintenance to help identify impacted areas/locations by: – Posting reminder notices in timely manner – Providing detailed information on locations or meters impacted, including milepost information – Making dates clearer when im

  22. Slide 22: 1Line Changes

    1Line Changes 22 Summer Update 2017 © 2017 The Williams Companies, Inc. All rights reserved.

  23. Slide 23: 1Line Changes

    1Line Changes > Retro Balances – Effective June 15, 2017, 1Line began updating shipper imbalance information with the previous gas day allocation processing or retro processing. – Balances will be updated after the following allocation updates are completed: • 8 am Retro Processing • 11 am Previous

  24. Slide 24: Electronic Contracting in 1Line (eContracting)

    Electronic Contracting in 1Line (eContracting) > Key elements of information from Exhibits A, B & C for all firm transportation contracts, excluding release contracts, are now available for the first time in the 1Line system. – This data was collected from a manual review of 448 contracts with 430 l

  25. Slide 25: Electronic Contracting in 1Line (eContracting)

    Electronic Contracting in 1Line (eContracting) > Capacity Release Traditional Rights Inheritance – Per paragraph 4.8 of Rate Schedule FT in Transco’s FERC Gas Tariff, “For capacity release transactions, receipt and delivery points will be established by the terms of the capacity release agreement. T

  26. Slide 26: Capacity Release – Create Offer

    Capacity Release – Create Offer 26 Summer Update 2017 © 2017 The Williams Companies, Inc. All rights reserved.

  27. Slide 27: New Projects and Locations

    New Projects and Locations 27 Summer Update 2017 © 2017 The Williams Companies, Inc. All rights reserved.

  28. Slide 28: Dalton and Murray Laterals

    Dalton and Murray Laterals > Dalton Lateral Locations – Dalton Lateral Transfer Point allows shippers to exchange gas from Transco’s mainline to the Dalton Lateral. – AGL Dalton represents AGL’s Lucas Road and Murray meters. – City of Cartersville – Smith Looper Bridge > Murray Lateral Location – CP

  29. Slide 29: Dalton Lateral/Murray Lateral Nominatable Points

    Dalton Lateral/Murray Lateral Nominatable Points CPH MURRAY AGL MP 2.0 SMITH LOOPER BR MP AGL 112.70 DALTON MP 54.0 City of Cartersville MP 55.9 Dalton Lat Transfer MP 1007.75 29 Summer Update 2017 © 2017 The Williams Companies, Inc. All rights reserved.

  30. Slide 30: Sabal Trail Receipts off Transco's system

    Sabal Trail Receipts off Transco’s system > Receipts available on Transco for Sabal Trail Shippers – Sabal Trail shippers can direct connect to the Sabal Trail lease capacity by using the interconnects Scott Mountain (Location ID 9003962) and Pine View (Location ID 9004982). Transco will be the conf

  31. Slide 31: Transco Pooler Activity at Station 85 delivering to Sabal Trail Pipeline

    Transco Pooler Activity at Station 85 delivering to Sabal Trail Pipeline Transfers from Station 85 pool to Station 85 Sabal Trail Transfer will be treated as a pool to pool transfer and will not be subject to a MDQ check. An IT or FT contract may be used. 31 Summer Update 2017 © 2017 The Williams Co

  32. Slide 32: Atlantic Sunrise Business Practice Changes

    Atlantic Sunrise Business Practice Changes > Shipper Zone 6 Flexible Path Options – The Atlantic Sunrise project will introduce an additional line off Transco’s mainline in zone 6 to be called the Central Penn Line (CPL) – With three possible paths (Central Penn, Leidy, or Mainline), shippers receiv

  33. Slide 33: Additional Line in Zone 6

    Additional Line in Zone 6 33 Summer Update 2017 © 2017 The Williams Companies, Inc. All rights reserved.

  34. Slide 34: New Interconnections

    New Interconnections 34 Summer Update 2017 © 2017 The Williams Companies, Inc. All rights reserved.

  35. Slide 35: Communications

    Communications 35 Summer Update 2017 © 2017 The Williams Companies, Inc. All rights reserved.

  36. Slide 36: Newsletters

    Newsletters > Transco’s Summer 2017 Customer Connection newsletter: – This newsletter provides insights into Transco’s ongoing projects, the people helping to make Transco a reliable and safe pipe, as well as our community involvements. > 1Line Summer 2017 in Focus newsletter (September): – This new

  37. Slide 37: Update 1Line Information

    Update 1Line Information > Verify contact information is correct for the following roles: Balance Trades, Capacity Release, Confirmation Party Primary, Nominations, and Storage Confirmation > Verify Business Associate contact information for correct e-mail addresses, phone numbers, and access to 1Li

  38. Slide 38: Customer Satisfaction Discussion

    Customer Satisfaction Discussion > Is there something we should do to improve our service to you? > Is your representative available when needed? > Are you able to reach someone after business hours? > Is the knowledge of expertise of your representative able to help solve your business needs? > Doe

  39. Slide 39: Questions?

    Questions? Click the Links: Who Should I Call? Or Contact My Rep 39 Summer Update 2017 © 2017 The Williams Companies, Inc. All rights reserved.