Vizsla Copper Corp · TSXV:VCU

Vizsla Copper — Investor Presentation (March 2026)

27 slides from Vizsla Copper's investor presentation, March 2026

  1. Slide 1: North American Critical Minerals at a Critical Time

    Cu Ag Au Corporate Presentation March 2026 NORTH AMERICAN CRITICAL MINERALS AT A CRITICAL TIME TSXV: VCU OTC: VCUFF

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS This presentation contains “forward looking statements” regarding Vizsla Copper Corp. (the “Company”) within the meaning of applicable securities legislation, including statements as to future events, results and plans. Forward-looking statements are sometimes but not alwa

  3. Slide 3: Palmer Acquisition Thesis

    Palmer Acquisition Thesis Critical Minerals Creating a North American critical minerals powerhouse through the acquisition of Palmer, a 1 Focused significant >3% CuEq1 resource in a proven Alaskan VMS district near tidewater access. Exploration Vizsla Copper’s team ready to mobilize exploration acro

  4. Slide 4: Track Record of Success

    TRACK RECORD OF SUCCESS CRAIG PARRY MICHAEL KONNERT SIMON CMRLEC STEVE BLOWER Chairman & CEO Advisor Director VP Exploration • Co-Founder & Chairman of • Founder, President & CEO of • COO of Vizsla Silver and • Geologist with over 30 years of Vizsla Silver, Co-Founder of Vizsla Silver. Co-Founder &

  5. Slide 5: Copper Focused Critical Minerals Champion

    Copper Focused Critical Minerals Champion Palmer VMS Poplar Discovery Pipeline • Advanced-stage Cu-Zn-Ag • +47,000ha land package ~38km • Multiple discovery-ready targets exploration project in Southeast from the Huckleberry Copper exist on Woodjam and Alaska, with 60km of road Mine Copperview4 acce

  6. Slide 6: North American Critical Minerals More Essential Than Ever

    North American Critical Minerals More Essential Than Ever ALASKA BC SUPPORT SUPPORT $16.00 4,000 Trilogy Metals 3,500 $12.00 3,000 Leverage strong Canadian $8.00 +250% 2,500 2,000 Federal Government support for critical mineral TTM Return 1,500 development (e.g. C$3.8 $4.00 1,000 Palmer billion Crit

  7. Slide 7: Capital Structure

    Capital Structure Transaction Vizsla Copper acquired 100% of the Palmer VMS Project from American Pacific (the “Acquisition”) C$15 million payable in common shares of Vizsla Copper on Closing; Acquisition + Additional C$5 million payable upon completion of an updated resource containing +22mt of min

  8. Slide 8: Indicative Development Timeline

    Indicative Development Timeline 2025 2026 2027 2028 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 H1 H2 H1 H2 Transaction Close Drilling Assay results BC Updated MRE Scoping Study Infill & Expansion Drilling Assay Results Alaska Updated MRE Engineering Phase 8

  9. Slide 9: Palmer VMS Project

    “=f VIZSLA COPPER CORP. Palmer VMS Project

  10. Slide 10: Palmer VMS Project in Alaska

    PALMER VMS PROJECT IN ALASKA 1 4 High-grade Cu, Zn, Ag, Au plus Barite Excellent Recent Drill Results at Palmer2 Advanced-stage exploration project, in Southeast • 43.8m of 8.22% CuEq Alaska. 60km of road access to tidewater – Definitive • 37.1m of 8.40% CuEq Agreement to acquire 100% Ownership • 33

  11. Slide 11: The Right Asset at the Right Time

    The Right Asset at the Right Time President Trump’s White House Reiterates Statement of Support For the Development of the Palmer Project in Alaska Renewed Momentum “Under President Trump, there is real momentum for resource development” Top-Down Industry Support “We are optimistic about the path fo

  12. Slide 12: The Right Asset at the Right Time

    The Right Asset at the Right Time State of Alaska Report in Response to Executive Order 1421 – (April 2025) Deal Announced 1. White House Publication (October 7, 2025) 12

  13. Slide 13: Palmer Project - Location

    Palmer Project - Location Location • 60 km road access from Haines (tidewater) • 392 km road access from Whitehorse • 170 km air/marine access from Juneau Geology & Mineralization • Mafic-dominated, bimodal sequence of Triassic volcanic- sedimentary rocks hosting VMS mineralization • Two VMS deposit

  14. Slide 14: Palmer Mineral Resource Estimate

    Palmer Mineral Resource Estimate Published January 20251 Classification Zone Domain Mass (Mt) Cu (%) Zn (%) Pb (%) Ag (g/t) Au (g/t) BaSO₄ (%) ZnEq (%) CuEq (%) Indicated SW(³) Zone_1 2.75 2.15 5.20 0.11 25.7 0.33 20.5 14.9 3.9 Zone_2 2.02 1.08 5.12 0.17 32.1 0.23 20.7 10.8 2.8 Total 4.77 1.69 5.17

  15. Slide 15: Palmer Deposit – Expansion Potential

    Palmer Deposit – Expansion Potential Best Copper Intercepts in Palmer History Drilled in 20231 1. American Pacific October 18, 2023 and January 10, 2024 news release, sedar.com 15

  16. Slide 16: Palmer Project – District Potential

    Palmer Project – District Potential 5 km 1. Data sourced from geochemical data compilations. The technical information contained in this figure is historical in nature and has been compiled from public sources believed to be accurate. The historical technical information has not been verified by Viz

  17. Slide 17: British Columbia Projects

    “=f VIZSLA COPPER CORP. British Columbia Projects

  18. Slide 18: British Columbia Projects

    British Columbia Projects Extraordinary Exploration Upside Backstopped by Resource The Strategy • District scale projects well situated amongst existing roads, power, and operating mines in the tier one jurisdiction of Central British Columbia, Canada • Existing historical resources on Woodjam and P

  19. Slide 19: British Columbia - Resources

    British Columbia - Resources Woodjam Historical Resources1: 1.71B lbs Cu + 968K oz Au @ 0.40% CuEq Zone Category Tonnage Grade Metal Content Tonnes (Mt) Cu (%) Au (g/t) CuEq (%) Cu (Mlbs) Au (koz) Southeast Inferred 221.7 0.31 0.05 0.36 1,507 383.7 Deerhorn Inferred 32.8 0.22 0.49 0.67 158 516.2 Tak

  20. Slide 20: Thira – A New Copper Discovery

    Thira – A New Copper Discovery OPEN 800 m OPEN OPEN OPEN Shallow mineralization that spans minimum of 800m E-W, mineralized to depth, open in all directions *See VCU news releases dated July 22nd, 2025, September 9th, 2025, and October 20th, 2025, vizslacopper.com **Copper equivalent calculation (Cu

  21. Slide 21: Unlocking a New Porphyry District

    Unlocking a New Porphyry District 1) Potential for multiple porphyries with Thira SW yet to be drilled 2) Thira well situated amongst roads, powerlines, & past producing mine 3) Thira Discovery Showing Potential Grade & Scale of Current Mines • TH25-138 Intersected 345.3m of 0.43% CuEq1 from 10.7m d

  22. Slide 22: Providing the Elements the World Needs

    PROVIDING THE ELEMENTS THE WORLD NEEDS. NYSE: VZLA TSX.V: VROY TSX.V: VCU TSX.V: COSA TSX.V: HSTR TSX: VZLA OTCQB: VCUFD OTCQB: COSAF OTCQB: HSTXF Inventa was founded in 2017 by Craig Parry and Michael Konnert to seize emerging opportunities in the natural resource sector. Today, Inventa has grown i

  23. Slide 23: Contact Us

    CONTACT US HEAD OFFICE VIZSLACOPPER.COM INFO@VIZSLACOPPER.COM 1723 – 595 W. Burrard St. +1-604-364-2215 Vancouver, BC, V7X 1J1 TSX.V: VCU | OTC: VCUFF

  24. Slide 24: Appendix A: Palmer Mineral Resource Notes

    Appendix A Palmer Mineral Resource Notes (1) Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. The deposits have been classified as Indicated and Inferred based on confidence in the geological model, drill spacing. The estimate of Mineral Resources may b

  25. Slide 25: Appendix B: Woodjam Historical Mineral Resource Notes

    Appendix B Woodjam Historical Mineral Resource Notes Source Southeast: “NI 43-101 Technical Report for 2012 Activities on the Woodjam South Property, Cariboo Mining Division, British Columbia”, prepared by Ross Sherlock, PhD., P.Geo., Gold Fields Canada Exploration BV and Alex Trueman, P.Geo., MAusI

  26. Slide 26: Appendix C and D: Poplar Mineral Resource Notes

    Appendix C Poplar Mineral Resource Notes The Mineral Resources are supported by the following 43-101 report filed on SEDAR under Universal's profile on September 8, 2021: Technical Report 2021 Update On The Poplar Deposit, Omineca Mining Division British Columbia Report For: Universal Copper Ltd. Pr

  27. Slide 27: Contact Us

    CONTACT US HEAD OFFICE VIZSLACOPPER.COM INFO@VIZSLACOPPER.COM 1723 – 595 W. Burrard St. +1-604-364-2215 Vancouver, BC, V7X 1J1 TSX.V: VCU | OTC: VCUFF

Vizsla Copper — Investor Presentation (March 2026) on 6ix